roofy

30-15 Vernon Boulevard

Queens, NY 11102BBL 4-00506-0029Map

Owner of record: 30 Vernon LLC

30-15 Vernon Boulevard is an elevator apartment building built in 2014 in Queens, 11102. It has 81 residential units across 8 floors. The owner of record is 30 Vernon LLC. HPD has recorded 15 housing violations here, most recently on January 25, 2024. 7 of the 15 most recent violations are still open. City tax records listed 79 rent-stabilized apartments here in 2018.

HPD violations
15
DOB violations
13
ECB violations
28
HPD complaints
43

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jan 25, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2018
79
About 98% of the building's 81 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • C

    Remove device preventing door from being self-closing consisting of kick down door stopper at building vestiblue door at public hall, 1st story

    Jan 25, 2024

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of kick down door stopper on building double front entrance door at public hall, 1st story

    Jan 25, 2024

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at front entrance door to building at public hall, 1st story

    Jan 25, 2024

    Closed — Violation dismissed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story

    Jan 25, 2024

    Closed — Violation dismissed
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at front entrance door to building at public hall, 1st story

    Jan 25, 2024

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north

    Jan 25, 2023 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from west at north

    Jan 25, 2023 · Apt 2B

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 19, 2021

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mechanical ventilation at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Jan 19, 2019 · Apt 1A

    Open — Invalid certification
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... aprox 4 square feet at inside of door to boiler enclosure in the kitchen located at apt 7f, 7th story, 1st apartment from north at east

    Jun 13, 2018 · Apt 7F

    Open — Invalid certification
Show 5 more ↓
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at hot water boiler closet door in the 2nd room from north located at apt 7f, 7th story, 1st apartment from north at east

    Jun 9, 2018 · Apt 7F

    Open — Invalid certification
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 29, 2018

    Open — Nov certified late
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    May 29, 2018

    Open — Nov certified late
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 29, 2018

    Open — Nov certified late
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 29, 2018

    Open — Nov certified late

DOB building violations · 13

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 16, 2018

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 27, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 22, 2016

    Dob violation - resolved
Show 3 more ↓
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 27, 2008

    Vw*-violation - work w/o permit dismissed

ECB violations · 28

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0000802 by the august 1, 2024 deadline. to date, the department

    Oct 1, 2024 · Penalty $12,500

    Active
  • Class - 2

    Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#918132. remedy:submit acceptable requir

    Dec 9, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    1. replace car door hanger rollers 2. close an unsafe hole on a car button station 3. on the car button station missing nyc device # number 4. missing maintenance log 5. missing service company information .

    Feb 18, 2020 · Penalty $312

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. at time of inspection observed active jobsite 6 sty's abovethe ground. at the roof observed temporary guardrail system erected

    Apr 14, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    Sec. 3307.4 warning sign & light to protect public from hazards vehicular traffic barricade. at time of inspection observed traffic barricades in place around a dumpster in the street on 30th rd. approx 25ft in

    Apr 14, 2015 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operations. at time of my inspection observed - nb upto to 8th fl construction in progress. sws & fence been installed at exp 2 vernon blvd

    Sep 2, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. 3303.12 no temporary elevator hoist in readiness as per code requirements. at the time of my inspection observed - nb upto 8 stories - construction in progress above 75'. no temporary elevator or hoist in

    Sep 2, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction - no handrails. observed - nb upto 8 story missing hand rail at staircase from cellar to 1st & bsmt to 2nd fl. remedy: provide

    Sep 2, 2014 · Penalty $1,000

    Resolve
  • Class - 2

    Sec. 3301.2 contractors,ladders not secure. noted: at time of inspection,w/new bldg under construction has excavation in process w/sets ladder not secured to prevent accidental fall hazard. depth of excavation

    Oct 17, 2013

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment. measures or temporary construction - no toe boards. noted at new bldg under construction,w/guard rail system around excavation w/approx depth 10 feet has no toe

    Oct 17, 2013 · Penalty $1,000

    Resolve
Show 18 more ↓
  • Class - 2

    Sec. 3304.8 dep permit required for pumping water for excavation. noted: at new bldg under construction at excavation stage,has retention system installed to drain site w/no dep permit posted. remedy: obtain

    Oct 17, 2013 · Penalty $800

    Resolve
  • Class - 2

    Sec. 3303.7.2 fire extinguisher as per fire code. noted: at new bldg under construction. at excavation stage has no fire extinguishers (adequate) in site. (1016) fire extinguishers shows recharge w/no inspectio

    Oct 17, 2013

    Resolve
  • Class - 1

    Sec. 3307.5.1 flag person. noted: at time of inspection. new bldg under construction,observed construction vehicle blocking sidewalk & partially in street,forcing pedestrians into active roadway. remedy: provid

    Oct 17, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to provide contractor sign. at time of inspection observed no contractors sign posted at jobsite. approx 100'feet of jobsite fence located on vernon blvd & approx 50'feet of fence on 30th rd. no contrac

    Sep 14, 2013 · Penalty $800

    Resolve
  • Class - 1

    Failure to have welders license for manual structure welding.note: at 6story prepared new bldg has shoring and braching in process and has aunlicense welder performing fillet wells or structure bracing for supp

    May 2, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    3304.4.4 guardrails-noted a new bldg under constr,has no guardrails around exp1 excavation.with apprx 8'foot drop at leading edge of hole.remedy: install guardrail immediately.

    May 2, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.noted: at 6story proposed new building at excavation andshoring stage. approved plan under nb#402626994 shows concrete and 2'x

    May 2, 2013 · Penalty $250

    Resolve
  • Class - 2

    Bc3301.1.2.failure to comply w/nyc fire code general.no firewatch,fireguard,cert of fitness.noted:6story prepared new building installing rackers and bracing. has a welder on site with no one as fire watch with

    May 2, 2013 · Penalty $400

    Resolve
  • Class - 2

    Sec. 105.8.2. temporary construction equipment on site - expired permit. noted: 8' high wood construction fence erected at exp 2 w/o a validpermit.last permit #402626994 expired on 2.24.12 w/no renewalon record

    Mar 19, 2012 · Penalty $400

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. noted: construction fence erected under job #402626994 has plywood panels connected to chain link fence,many panels loose & leaning throughout approx 25 fe

    Jul 9, 2010

    Resolve
  • Class - 2

    Failure to maintain observed vacant lot debris filled consisting of revious construction fence panels and post piles of broken brick and concrete household & automotive debris wood planking remedy maintain site

    Feb 9, 2010

    Resolve
  • Class - 1

    Failure to safeguard all public & property observed on corner of vernon blvd & extending into 30 road side of lots app 30 l.f of vertical two foot high rebar on edge of lot adjacent sidewalk rebar uncapped two

    Feb 9, 2010

    Resolve
  • Class - 2

    Jon site fence defective, noted: const. fence approx 10'-0 long is missing site open to public fence is disrepair nails sticking out. non active site. remedy: repair fence

    Jan 22, 2010

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. noted: at exposure #1 (front) job site fence has become loose & is leaning back onto job site,approx 16-20ft of fence is defective. remedy: repair replace

    Dec 3, 2009

    Resolve
  • Class - 2

    Fail to obtain a temp const permit prior to installation. noted: constwood fence 8'high erected at lot line perimeter & no permit on file & current. remedy: obtain temp fence permit.

    Nov 2, 2009

    Resolve
  • Class - 2

    Job site fence defective: noted: job 402626994 construction fence is leaning disrepair. approx 8'x 8' fence is missing. site is open to public. remedy: repair fence.

    Jun 10, 2009 · Penalty $400

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection (defective fence). construction work under appl #402543761 observed at time off inspection, perimeter construction fence apprrox 25 linear ft was defective

    Feb 27, 2009

    Resolve
  • Hazardous

    Job site fence defective fence doors are open allowing access to site one door has fallen and is broken off the hinges nails are also sticking out towards sidewalk. remedy: repair and or replace fence.

    Nov 9, 2007 · Penalty $5,000

    Resolve

Complaints

  • Door/window

    Window frame

    Oct 16, 2025 · Apt 5H

    Close
  • Water leak

    Heavy flow

    Sep 18, 2025 · Apt 6K

    Close
  • Water leak

    Heavy flow

    Sep 15, 2025 · Apt 6K

    Close
  • Unsanitary condition

    Sewage

    Sep 15, 2025 · Apt 6K

    Close
  • Electric

    Outlet/switch

    Sep 15, 2025 · Apt 6K

    Close
  • Door/window

    Door

    Jun 8, 2025 · Apt 4L

    Close
  • General

    Janitor/super

    Jun 8, 2025 · Apt 4L

    Close
  • Door/window

    Door

    May 25, 2025 · Apt 4L

    Close
  • Plumbing

    Radiator

    May 25, 2025 · Apt 3K

    Close
  • Water leak

    Slow leak

    Mar 25, 2024 · Apt 5I

    Close
Show 33 more ↓
  • Heat/hot water

    Entire building

    Jan 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2024 · Apt 3B

    Close
  • Plumbing

    Water supply

    Jan 25, 2024 · Apt 5E

    Close
  • Plumbing

    Water supply

    Jan 25, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 25, 2024 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jan 17, 2023 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 12, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Mar 11, 2019 · Apt 2H

    Close
  • Water leak

    Heavy flow

    Mar 11, 2019 · Apt 2H

    Close
  • Paint/plaster

    Wall

    Jan 17, 2019 · Apt 1A

    Close
  • General

    Ventilation system

    Jan 17, 2019 · Apt 1A

    Close
  • Door/window

    Door frame

    Jan 17, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Jan 17, 2019 · Apt 1A

    Close
  • Door/window

    Window frame

    Jan 17, 2019 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2019 · Apt 1A

    Close
  • Door/window

    Door frame

    Nov 18, 2018 · Apt 2E

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2018 · Apt 2E

    Close
  • Unsanitary condition

    Mold

    Jun 8, 2018 · Apt 7F

    Close
  • Unsanitary condition

    Mold

    Jun 8, 2018 · Apt 7F

    Close
  • Unsanitary condition

    Mold

    May 30, 2018 · Apt APT7F

    Close
  • Unsanitary condition

    Mold

    May 23, 2018 · Apt 7F

    Close
  • Unsanitary condition

    Mold

    May 8, 2018 · Apt 7F

    Close
  • Unsanitary condition

    Mold

    May 8, 2018 · Apt 7F

    Close
  • Heat/hot water

    Entire building

    Apr 10, 2018 · Apt 2M

    Close
  • Plumbing

    Water supply

    Feb 9, 2018 · Apt 7F

    Close
  • Flooring/stairs

    Floor

    Feb 9, 2018 · Apt 7F

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2018 · Apt 7F

    Close
  • Unsanitary condition

    Mold

    Feb 9, 2018 · Apt 7F

    Close
  • Flooring/stairs

    Floor

    Jan 15, 2018 · Apt 7D

    Close
  • Plumbing

    Radiator

    Jan 15, 2018 · Apt 7D

    Close
  • Plumbing

    Radiator

    Jan 15, 2018 · Apt 7D

    Close
  • Unsanitary condition

    Mold

    Jan 15, 2018 · Apt 7D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 5, 2016 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D8)
Year built
2014
Floors
8
Residential units
81
Building area
84,000 ft²
Lot area
15,800 ft²
Zoning
R7A
Community board
401
Council district
22
Block / lot
506 / 29
Assessed value
$8,565,750
Landmark / historic district
No

HPD registration #431592, last renewed Aug 21, 2025.

Questions about 30-15 Vernon Boulevard

Who owns 30-15 Vernon Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is 30 Vernon LLC.

Does 30-15 Vernon Boulevard have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 30-15 Vernon Boulevard rent stabilized?

NYC Department of Finance tax bills listed 79 rent-stabilized units here in 2018 (about 98% of its 81 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 30-15 Vernon Boulevard built?

City records list 2014 as the year it was built.

How many apartments are in 30-15 Vernon Boulevard?

It has 81 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.