41-18 Crescent Street
Queens, NY 11101BBL 4-00414-0035Map
Owner of record: Ciampa S2 LLC
41-18 Crescent Street is an elevator apartment building built in 2010 in Queens, 11101. It has 86 residential units across 10 floors. The owner of record is Ciampa S2 LLC. HPD has recorded 16 housing violations here, most recently on July 11, 2026. 3 of the 16 most recent violations are still open. City tax records listed 86 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 22
- ECB violations
- 54
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 9th story
Jul 11, 2026
Open — Not complied with - ANon-hazardous
Provide lids at garbage cans at compactor closet, 9th story
Jul 11, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 9th story
Jul 7, 2026
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 9c, 9th story, 1st apartment from east at south
Apr 6, 2026 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 9c, 9th story, 1st apartment from east at south
Apr 6, 2026 · Apt 9C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 9c, 9th story, 1st apartment from east at south
Apr 6, 2026 · Apt 9C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 10th story
May 22, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick down doorstop at door leading to compactor room at 1st public hall from east, 1st story
Nov 20, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at 1st public hall from east, 1st story
Nov 20, 2023
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 10th story
Sep 25, 2023
Closed — Violation dismissed
Show 6 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 10th story
Sep 25, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 10th story
Sep 25, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 25, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 25, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective inoperable #2 oil burner at roof at boiler room
Apr 29, 2013
Closed — Violation closed
DOB building violations · 22
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 25, 2018
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2012
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 25, 2011
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2010
Dob violation - active - Construction other optional
C-construction other optional
May 21, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 54
- Class - 2
32-655.outdoor sign exceeds allowable surface area of 500sqft in c6-1 zone.packard square-now leasing.remedy:remove illegal sign.
Jan 19, 2022 · Penalty $2,500
Resolve - Class - 2
114.2.3 outdoor sign does not bear a decal bearing uc classification mark or date of sign's erection.packard square-now leasing.remedy:remove illegal sign.
Jan 19, 2022 · Penalty $2,500
Resolve - Class - 2
28-415.1 failure to have licensed sign hanger attach or erect sign.packard square-now leasing.remedy:remove illegal sign.
Jan 19, 2022 · Penalty $2,500
Resolve - Class - 2
28-105.1 outdoor sign on display without a permit.packard square-now leasing.remedy:remove illegal sign.
Jan 19, 2022 · Penalty $2,500
Resolve - Class - 2
32-64.outdoor sign exceeds allowable height of 40ft above the curb in c6-1 zone.packard sqare-now leasing.remedy:remove illegal sign.
Jan 19, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of building.note:at time of inspection observed that respondent did not file certificate of correction for
Nov 27, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to take and provide adequate safety measures where required to protect and secure public safety from documented unsafe facadea sp er 1rcny 103-04 facade tehcnical report filed unsafe by pe/ra on 07-06-
Jul 14, 2020 · Penalty $10,000
Resolve - Class - 1
Failure to have site safety mgr. present as required.observed workers are working on ground, cellar & 4th flr. doing backfill,electrical & painting work. ssm is not present at time of inspection during work.rem
Jun 25, 2011 · Penalty $2,400
Resolve - Class - 2
Work after hours w/o variance permit contrary to 28-105.12.5. observedworkers are working on cellar & 4th flr. doing electrical & painting work. another worker back filling the side of the stucture(bldg).no va
Jun 25, 2011 · Penalty $800
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required. as noted: at time of inspection at above active construction site observed construction work in progress on cellar & 7 floor to roof level
Jun 21, 2011 · Penalty $2,400
Resolve
Show 40 more ↓
- Class - 1
28-105.12.2 wor does not conform to approved const docs &/or approved amendments-note:violation written 05/23/11 for steel and plank extention built at rear of bldg has not been removed-no amendmens at job sit
Jun 21, 2011 · Penalty $1,600
Resolve - Class - 1
28-105.12.2 work does not conform to approved const docs and/or approved amendments-notes site safety plan does not indicate steel and plankwork being done at rear of bldg.approx. size 12'high x 100'long-crane
May 23, 2011 · Penalty $1,000
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments - noted: site safety plan has not been complied w/sidewalk shed has been removed at front of bldg - 1) no letter from dob has
May 9, 2011 · Penalty $1,000
Resolve - Class - 1
3301.1.2 fail to comply w/nyc fire code. observed asphalt melter (tar kettle) & propane gas being used on the roof. the operator failed to provide fdny certificate of fitness. upon request no fdny permit has be
Apr 16, 2011 · Penalty $1,600
Resolve - Class - 2
Work after hours w/o variance permit contrary to 28-105-12.5. observed approx 5 workers doing roofing work on the roof & bulkhead roof. tar ketttle being used by propane for asphalt melting. no permit has been
Apr 16, 2011
Resolve - Class - 2
Sec. 3301.1.2 failure to comply w/nyc fire code. noted: at time of inspection at above active consr. site observed workers (rafael reinoso &jeses parell) were using torch at roof level upon request no fdny cert
Dec 11, 2010
Resolve - Class - 2
Work w/o a permit. at time of inspection at above active construction site weekend work in progress under variance #410147452,permit issued for sheetrock & taping work for interior. upon inspection observed
Dec 11, 2010
Resolve - Class - 2
Failure to provide design drawing as noted at time of insp at above active construction site observed window installation in progress on 3fl exposures 1 observed workers were installed anchor into wall and usin
Nov 9, 2010
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operation as noted at time of insp at above active construction site observed no protection provided on adjacent property on exp4 north ele
Nov 9, 2010 · Penalty $1,200
Resolve - Class - 2
Job site fence not constructed pursuant to subsection observed job site fence has a opening to enter & exit from the site to adjacent occupied property on 24 st side. rem: comply w/ the code
Oct 23, 2010
Resolve - Class - 1
Sec. 3314.8. failure to provide guard rail & toe board observed a worker working on a supported scaffolding (approx 35') platform. no guard rail & toe board provided. remedy: provide guard rail & toe board on
Oct 14, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to institute / maintain safety equipment measures or temporaryconst. - no hand rails. observe no hand rails installed on the stair well from cellar to 2nd fl. work is in progress on throughout of the bl
Aug 31, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to institute / maintain safety equipment measures or temporaryconst. - no guard rails. observe workers are working on a supported scaffold @ 5th fl level. no guard rails have been provided on scaffold
Aug 31, 2010 · Penalty $2,400
Resolve - Class - 1
Sec. bc3314.4.3 no record of daily inspection of supported scaffold performed by authorized person at site. as noted: @ time of insp. @ above active const. site observed brick work in progress on exposure 4 by
Aug 21, 2010 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved site safety plans as noted : @ time of insp. @ above active const. site brick work in progress observed that roof protection provided on exposure 2 on adjacent property w/ 2" i
Aug 21, 2010
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. asnoted: at time of inspection at above active construction site observed excessive amounts of debris (masonry) are scattered thru-out 10th fl
Aug 14, 2010 · Penalty $2,400
Resolve - Class - 2
Sec. 3314.4.4 failure to maintain scaffold platform free of material &debris. as noted: at time of inspection at above active constr site observed supported scaffold erected on exposure 4 from ground fl up to
Aug 14, 2010 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction no standard guardrails. as noted: at time of inspection atabove active construction site observed no guardrails & toe boards
Aug 14, 2010 · Penalty $2,400
Resolve - Class - 1
Sec. 3308.3 vertical safety netting not per code,damaged or inadequate. as noted: at time of inspection at above active construction site observed vertical perimeter netting are ripped. torn from cable & not 60
Aug 14, 2010 · Penalty $1,600
Resolve - Class - 1
3318.5/ cu97##,cu100r#. cease use 97##-soil under catwalk leading to hout loading dock on ground fl has eroded-excavation unit summoned to access situation hoist is not to be used until excavations unit & eleva
Aug 13, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and prop affected by const operationsat time of inspection crane hoisting precast concrete floor slabs to 9th level of bldg. observed flag persons on street not performing dutie
Jul 29, 2010 · Penalty $2,400
Resolve - Class - 2
Sec bc 3303.7.2 misc viol: fail to provide amount of fire extinguishers per floor. noted: at time of inspection crane hoisting precast concrete floor slabs. observed on all (8) floors of bldg only (1) mounted f
Jul 29, 2010
Resolve - Class - 1
Sec 3308.3 vertical netting requirements noted at time of inspection crane hoisting precase concrete floor slabs. observed on both 7th & 8th floor. vertical safety netting not installed to full height along pe
Jul 29, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures - no toe boardat time of inspection crane hoisting precast concrete floor slabs. observed on 5th fl of bldg along entire floor perimeter edge of bldg no t
Jul 29, 2010
Resolve - Class - 1
Fail to institute & safety equipment measures or temp const (no guard rails) noted: at time of inspection crane hoisting precast concrete floor slabs. observed at 8th level along entire perimeter edge of bldg (
Jul 29, 2010 · Penalty $2,400
Resolve - Class - 2
Operation of a crane w/o a cert of onsite inspection.crane on site lifting skids of block to 8 fl level w/o a crane notice (cn) cd#3831 manitex no cd8 on site new bldg up to 8fl level @ time of insp.jcj constru
Jul 20, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no toe board. as noted: at time of inspection at above active site observed there is no toe board provided on 1st flr exp
May 24, 2010 · Penalty $1,000
Resolve - Class - 1
Erected or installed supported scaffold 40' or higher w/o a permit. asnoted: at time inspection at above active site observed scaffold erected on exp 3 approx 42' in height w/o first obtaining permit. remedy:
May 24, 2010 · Penalty $1,200
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. as noted: at time of inspection at above active construction site observed no protection provided on adjacent window on exp 2 of
May 24, 2010 · Penalty $1,200
Resolve - Class - 1
Sec. 3314.9. failure to provide required bracing/tie backs for supported scaffold. as noted at time of inspection at above active site observed supported scaffold erected on exp 3 approx 42' in height, observed
May 19, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 3314.8. failure to provide required guard rails & toe boards for scaffold platform. as noted: at time of inspection at above active construction site observed there is no guard rails & toe board provided
May 19, 2010
Resolve - Class - 1
3301.2.fail to provide overhead protection as required @ the time of my inspection approx 20 workers on site bldg structure up to 2 fl approx 29ft high the structure adjacent to 41-10 crescent st apprx 4 ft apa
May 19, 2010 · Penalty $1,600
Resolve - Class - 2
Fail to safeguard all persons & property affected by construction operations @ the time of my inspection approx 20 worker on site bldg structure up to 2 fl i observed smoking refuse @ exposure 3 of job site i o
May 19, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.note:@ the time of inspection @ above active construction site observed construction fence erected on sdwlk @ front of jobsite obs
Apr 26, 2010 · Penalty $2,400
Resolve - Class - 2
(misc)failure to provide flag persons.as noted:@ the time of insp @ above active construction site observed no flag persons provide while using construction equipment on the street & sdwlk & sdwlk is open to p
Apr 26, 2010
Resolve - Class - 1
3314.8 failure to provide required guard rails&toe boards for scaffold platform as noted attime of inspection at above active construction site observed pipe scaffold erected approx12feet in height workers were
Apr 8, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to have site safety manager present as required. as noted at time of time of inspection at above active construction site observed workers were working on pipe scaffold and site observed workers were wo
Apr 8, 2010 · Penalty $2,400
Resolve - Class - 2
3303.7.3 smoking refuse within construction site at time of inspection at above active construction site observed recent smoking refuse within construction site in violation of nyc fire code 1404.1 smoking refu
Apr 8, 2010
Resolve - Class - 1
Bc1704.4 failure to provide adequate texting in accordance w/ bc1704.4no scale for unit weight test as noted at time of insp on an active construction site concrete placement in progress for a 3ft deep max appx
Mar 11, 2010
Resolve - Class - 1
Bc1704.4 failure to provide adequate testing in accordance w/ bc1704.4no scale for unit weight test as noted at time of isnp on an active construction site concrete placement in progress for a 3ft deep max appx
Mar 11, 2010
Resolve
Complaints
- General
Ventilation system
Jun 4, 2026 · Apt 9C
Close - General
Bell/buzzer/intercom
Jun 4, 2026 · Apt 9C
Close - Heat/hot water
Entire building
Apr 5, 2026 · Apt 3H
Close - Unsanitary condition
Mold
Mar 22, 2026 · Apt 9C
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 3H
Close - Heat/hot water
Entire building
May 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 19, 2023 · Apt 9C
Close - Heat/hot water
Apartment only
Nov 19, 2023 · Apt 9C
Close - Heat/hot water
Apartment only
Nov 11, 2023 · Apt 9C
Close - Heat/hot water
Entire building
Sep 24, 2023 · Apt BLDG
Close
Show 3 more ↓
- Electric
Power outage
Sep 24, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 10, 2015 · Apt 4J
Close - Heating
Heat related
Apr 28, 2013 · Apt 10B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2010
- Floors
- 10
- Residential units
- 86
- Building area
- 64,029 ft²
- Lot area
- 10,034 ft²
- Zoning
- M1-5/R7-3
- Community board
- 401
- Council district
- 26
- Block / lot
- 414 / 35
- Assessed value
- $6,661,350
- Landmark / historic district
- No
HPD registration #429971, last renewed Sep 23, 2025.
Questions about 41-18 Crescent Street
Who owns 41-18 Crescent Street?
The owner of record in NYC Department of City Planning PLUTO data is Ciampa S2 LLC.
Does 41-18 Crescent Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 41-18 Crescent Street rent stabilized?
NYC Department of Finance tax bills listed 86 rent-stabilized units here in 2024 (about 100% of its 86 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 41-18 Crescent Street built?
City records list 2010 as the year it was built.
How many apartments are in 41-18 Crescent Street?
It has 86 residential units and 87 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.