40-09 29th Street
Queens, NY 11101BBL 4-00402-0024Map
Owner of record: Gang W. Realty, INC.
40-09 29th Street is an elevator apartment building built in 2019 in Queens, 11101. It has 20 residential units across 5 floors. The owner of record is Gang W. Realty, INC.. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 15
- ECB violations
- 20
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 16, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 5 more ↓
- Unsafe buildings none
Ub-unsafe buildings none
May 27, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 20
- Class - 1
@active 5story nb site partial stop work order reinspection complaint4975999+vio#39533634r" stop all exterior work at exp#1" issued on 10/21/24 by#3050 i observe exterior work@exp#1 completed of stucco+coping f
Apr 7, 2025 · Penalty $10,000
Resolve - Class - 2
Observed 5 str nb- active site with 10+ workers on site. upon review of the pre-shift meeting records, i found that the names, titles, and company affiliation of each worker who participated in the pre-shift me
Oct 21, 2024
Resolve - Class - 2
Bc 3303.7.2 fire extinguishers- nyc fc 906. observed 5 str nb with fire extinguishers missing in multiple required areas (stairwells), and where provided, many were placed on the ground / not hung up as require
Oct 21, 2024 · Penalty $2,500
Resolve - Class - 2
Observed an aprox. 3ft x 8 ft chopped/cut opening in the concrete foundation wall at the cellar lvl- leading into an electrical room- near the corner of exps# 1 & 4. upon request for the competent person to pro
Oct 21, 2024
Resolve - Class - 2
Bc 3307.1 protection of pedestrians. observed 5 str nb- topped off- with unfinished work-stucco- on the exp#1 5th flr terrace parapet wall- immediately over the exp#1 sidewalk/pedestrian walkway- with no sidewa
Oct 21, 2024 · Penalty $2,400
Resolve - Class - 2
Observed a supported scaffold installed by the gc in the exp#4 adj. property's rear yard, with the scaffold blocking the adj. building's fire escape ladder- obstructing that building's emergency egress and crea
Oct 21, 2024 · Penalty $5,000
Resolve - Class - 2
Bc 3314.1 scaffolds. observed a 3-tier supported scaffold at exp#4 with the following conditions- missing cross-bracing; loose planks; 1 working platform not fully planked; 1 area missing guard rails / end rail
Oct 21, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3309.1- failure to protect/adequately protect adjoining properties during construction operations. observed unfinished exterior walls (exposed cmu blocks) at exps#2 & 4, over 4ft above the adj building roofs
Apr 5, 2024 · Penalty $2,500
Resolve - Class - 2
Upon entering the site, observed 2 wood shanties approx 10ft x 16ft and 10ft x 8ft, constructed with 2x4 and ply wood sheating, upon inspection it was determined the material was not fire-rated, stop all use o
Oct 19, 2023
Resolve - Class - 2
During my inspection of a new 5 story building, construction in progress, building topped off, upon reaching the 2nd floor observed unprotected powerline approx 2ft from the leading edge, creating a possible el
Oct 19, 2023
Resolve
Show 10 more ↓
- Class - 2
Jobsite at superstructure phase-building new steel columns erected 5 feet away the fence at exp#1 have exceeded approx. 15 feet beyond the height of the fence. sidewalk shed missing contrary to ssp-310.00 dated
Jun 27, 2022 · Penalty $1,280
Resolve - Class - 1
Work contrary to approved soe plans.note:at time of inspection observed underpinning work in progress.request pre construction survey & monitoring report none was provided by competent person.underpinning in pr
Mar 30, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33-formwork design drawings. noted: at time of my inspection of a new 5sty bldg,construction in progress at the foundation phase,i observed
Nov 24, 2021
Resolve - Class - 1
Sec. bc3307.1 sidewalk & street operations w/o dot permit. noted: at time of my inspection of a new 5 sty bldg construction in progress at the foundation phase,i observed upon approaching the site that a concre
Nov 24, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to perform proper washout procedures(concrete). noted: at timeof my inspection of a new 5 sty bldg,construction in progress at the foundation phase,i observed concrete truck & pump operations in progres
Nov 24, 2021 · Penalty $2,500
Resolve - Class - 2
Sec. 28-105.12.8 site contrary to site safety plan. noted: at time of my inspection of a new 5 sty bldg construction in progress at the foundation phase,i observed upon reviewing the site safety plan that a sta
Nov 24, 2021
Resolve - Class - 2
Failure to maintain/display onsite documents as required by bc chapter33.at time of inspection of an active nb project on request to review monitoring reports and special inspections performed none were availab
Oct 12, 2021
Resolve - Class - 1
Failure to provide protection at side of excavation. at the time of inspection i observed at exp#4 next to adjacent property that excavationwas about 7'deep(shear cut)& no adequate protection was provided this
Oct 16, 2019 · Penalty $5,000
Resolve - Class - 2
Pedestrian protection inadequate. at the time of inspection,i observedan ,inadequate barrier that was anchored to sidewalk using sand bags &covered w/pieces of debris netting. this barrier does not conform with
Oct 16, 2019 · Penalty $2,400
Resolve - Class - 1
Sec. 3315.1 failure to provide code compliance ramp. at time of inspection,i noticed that there is no sloped ramp as per code excavator machine is sitting at the top of pile of dirt horizontally w/no dirt ramp
Oct 16, 2019 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2019
- Floors
- 5
- Residential units
- 20
- Building area
- 23,610 ft²
- Lot area
- 7,505 ft²
- Zoning
- M1-2/R5D
- Community board
- 401
- Council district
- 26
- Block / lot
- 402 / 24
- Assessed value
- $2,617,650
- Landmark / historic district
- No
Questions about 40-09 29th Street
Who owns 40-09 29th Street?
The owner of record in NYC Department of City Planning PLUTO data is Gang W. Realty, INC..
Does 40-09 29th Street have violations?
NYC HPD has no housing violations on record for this property.
Is 40-09 29th Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 40-09 29th Street built?
City records list 2019 as the year it was built.
How many apartments are in 40-09 29th Street?
It has 20 residential units and 21 units in total.