38-35 Crescent Street
Queens, NY 11101BBL 4-00387-0002Map
Owner of record: Tgz Crescent Tower LLC
38-35 Crescent Street is an elevator apartment building built in 2020 in Queens, 11101. It has 17 residential units across 6 floors. The owner of record is Tgz Crescent Tower LLC. HPD has recorded 3 housing violations here, most recently on January 16, 2026. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 3
- DOB violations
- 0
- ECB violations
- 10
- HPD complaints
- 7
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Jan 16, 2026 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 16, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 10
- Class - 2
Sec. 3301.13.13 construction superintendent log book. noted: at time of my inspection of a new 6 sty bldg,construction superintendents,log book,i observed multiple missing days,time in-out not filled out on num
Jan 14, 2021
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at time of my inspection of a new 6 sty bldg,construction in progress,bldg topped off,i observed numberous areas throughout the bldg w/
Jan 14, 2021
Resolve - Class - 2
Smoking at construction site.as noted:at time of inspection on an active construction site.i observed at exposure#4 floor#4 mr.hao rong chensmoking at construction site.smoking shall be prohibited at all constr
Oct 30, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measure on temporary construction-no guardrails.as noted:at time of inspection an active construction site.i observed at exposure#1 floor#3 balcony and exposure#3
Oct 30, 2020 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order. at time of re-inspection of"stop all use of supported scaffold at roof floor. do not remove supported scaffold,comply w/ code."swo issued on 7/16/19
Aug 1, 2020 · Penalty $5,000
Resolve - Class - 1
3301.6-no sigend and sealed design drawing for temporary platform at tiem of inspection of actiev site observed at roof level to bulkead stairway temporary platform in place with lumber plank platform with no f
Jul 16, 2020 · Penalty $625
Resolve - Class - 1
3314.1-supported scaffold not comply with code at time of inspection observed active construction site roof level 2 supported erected 3/4 frames high adn for cmu wall erection and observed violating condition
Jul 16, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to institue/maintain safety measure equipment or temporary construction-no guardrails.note:at time of my inspection of a 6 story building at 5th floor level under construction i observed the guardrails
Jun 2, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3309.10 failure to provide roof protection for adjacent property.note:at time of my inspection observed 6 story new building at 5th floor level under construction and exp-3 was not provided roof protection f
Jun 2, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3301.2 failure to provide overhead protection at exp-2/3 ad jacent properties.note:at time of my inspection of a 6 story new building at 5th floor level under construction.i observed the overhead protection
Jun 2, 2020 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 14, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 6D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2020
- Floors
- 6
- Residential units
- 17
- Building area
- 22,194 ft²
- Lot area
- 6,500 ft²
- Zoning
- M1-2/R5D
- Community board
- 401
- Council district
- 26
- Block / lot
- 387 / 2
- Assessed value
- $1,961,100
- Landmark / historic district
- No
HPD registration #433878, last renewed Jul 28, 2026.
Questions about 38-35 Crescent Street
Who owns 38-35 Crescent Street?
The owner of record in NYC Department of City Planning PLUTO data is Tgz Crescent Tower LLC.
Does 38-35 Crescent Street have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 38-35 Crescent Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 35% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 38-35 Crescent Street built?
City records list 2020 as the year it was built.
How many apartments are in 38-35 Crescent Street?
It has 17 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.