43-22 Queens Street
Queens, NY 11101BBL 4-00266-0003Map
Owner of record: 43-22 Queens Street L.l.c.
43-22 Queens Street is an elevator apartment building built in 1929 in Queens, 11101. It has 790 residential units across 54 floors. The owner of record is 43-22 Queens Street L.l.c.. HPD has recorded 16 housing violations here, most recently on September 27, 2026. 2 of the 16 most recent violations are still open. City tax records listed 790 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 94
- ECB violations
- 65
- HPD complaints
- 44
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 17k h+, 17th story, 1st apartment from west at north
Sep 27, 2026 · Apt 17K H+
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 27, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall
Jan 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jan 6, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jan 6, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Jan 6, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed
Show 6 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing. at public hall, 1st story
Dec 28, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 94
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 30, 2017
Vp*-violation unserved ecb- dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2013
Dob violation - resolved - Elevator elevatorrequired
This pvt replaces pvt 496715
Dec 20, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 22, 2013
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 19, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2008
Dob violation - resolved
ECB violations · 65
- Class - 1
Device not level at the lobby landing 1 3/4 inches off below the floor(cu). device not level at the top landing 3 3/4 inches above the landing(cu). brake maintenance tag missing the date brake maintenance was p
Aug 10, 2023 · Penalty $1,250
Resolve - Class - 2
Alarm system is not operative
Dec 6, 2019
Resolve - Class - 1
C/u 05x10; 23x10 (05-x-10) restrictor is not operative. (23-x-10) repair indicator lights in hall buttons.
Aug 16, 2019 · Penalty $1,250
Resolve - Class - 1
Cu7x10,99m7,98b7,59b7,59m7,68b7,100m7. 7x10-zone lock inoperative causing a hazardous condition; 99m7-missing 1 year test tag, provide; 9b7-current cat5 tag blank provide; 59b7-brake tag blank provide
Jul 23, 2019 · Penalty $1,250
Resolve - Class - 2
Model apt. @time of insp observed two model apts in use.observed furnished apts &(toiletries) in bathrooms w/out a temp c of o pursuant to 28-111 & bldg bulletin 2010-02.in addition observed sales office w/pers
Jun 8, 2018 · Penalty $625
Resolve - Class - 2
Failure to provide approved/accepted contruction documents at job site at time of inspection.nb job#420651823.at time of an energy compliance inspection.i observed that there were no complete sets of dob approv
Nov 29, 2017 · Penalty $500
Resolve - Class - 1
Design,sizes & capacity of materials.@ the time of inspection of incident that occured @ roof level of the 54 story nb i observed the chain fall system that was used to hoist the #12 steel i beam into place & c
Jun 30, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.5 unsafe conditions & equipment: hoist operating. noted: incident reported when woker was injured by pallet jack when it was accidentally discharhed onto his foot. causing swelling/pain.(vitaess) stat
May 18, 2017 · Penalty $1,600
Resolve - Class - 2
Bc28-104.7.11/failure to provide additional information.as noted:at time of inspection observed reinforced concrete slab,columns,and shear walls.provide to ceu-tr-1,field reports with pictures,rebar and cast in
May 5, 2017 · Penalty $400
Resolve - Class - 2
Bc3301.7/failure to provide p.e approved design drawings.at noted:at time of inspection observed at floor #54 failure to provide pe design for formwork-h20 beams,heads for h20 beams,steel bands to the formwork
May 5, 2017 · Penalty $400
Resolve
Show 40 more ↓
- Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noted: while responding to incident of 54 story new build ing under construction has concrete operations in process stated by
May 4, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. at time of inspection while responding to an incident observed 54 sty bldg under construction has no guardrails
May 4, 2017 · Penalty $2,400
Resolve - Class - 1
Sec. 3308.3 vertical safety netting not per code damaged on inadequate. at time of inspection 54 sty new bldg w/concrete operations has sheer wall climbing form work platform w/vertical netting loose & not encl
May 4, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain addequate housekeeping per section requirements at time of inspection the following was observed. maintaince at 54 sty concrete building under construction has sheer hall (chamboy)platform
May 4, 2017 · Penalty $800
Resolve - Class - 2
Sec. 3301.2 holes/penetrations at time of inspection observed penetrations & holes more than 3"in diameter or more than 6"x6" uncovered & ornot shot down creating a potential for debris,materials or tools to
Feb 22, 2017
Resolve - Class - 1
Housekeeping. at 7th fl observed construction debris consisting of wood,sawdust,nails & various combustibles piled & strewn on floors throughout. remedy: maintain housekeeping.
Feb 22, 2017 · Penalty $2,400
Resolve - Class - 1
Sec. 3310.6 designated concrete safety manager.(csm)at time of inspection observed csm indicated on pw2 had not seen on site since 12/29/16 & various other csm's have been on site. new csm tsetop namgual,has
Feb 22, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3308.7.7 controlled access zone. at 36th fl observed no signage for controlled access zone at edge of bldg where netting or guardrail system had not yet been installed. remedy: comply w/code.
Feb 22, 2017 · Penalty $1,600
Resolve - Class - 1
Housekeeping. observed debris along leading edge of various upper floors creating a condition where debris could fall of bldg to below. remedy: maintain leading edge clear of debris.
Feb 22, 2017 · Penalty $2,400
Resolve - Class - 2
Bc3314.15.2 partial stop work order for suspended scaffold issued pursuant to 28-207.2 and posted at premises. delta stirrups. note:observeda delta stirrups are placed at 5'-6' from the end of the modular plat
Nov 30, 2016
Resolve - Class - 2
Partial stop work order for suspended scaffold issued pursuant to 28-207.2 and posted at premises. work does not conform to approved cd-5(plan) note: observed the tiebacks and safety lines attached to
Nov 30, 2016
Resolve - Class - 2
Work w/o a permit. at time of inspection i observed a spider crane in operation,erecting steel i beams to a roof structure w/o a proper pertmi to perform this work. remedy: obtain permit.
Nov 2, 2016 · Penalty $800
Resolve - Class - 1
Inadeqaute safety measures operation of hoisting equipment in a unsafemanner. at time of inspection i observed the unsafe operation of a spider crane hoisting steel i beams w.the machines support outriggers app
Nov 2, 2016 · Penalty $10,000
Resolve - Class - 1
Sec. 3316.9.2 gc#026044 no 16/32 hour rigging certificate for personnel working w/rigging equipment,hoisting outside bldg. at time of inspection of a spider crane i observed the installation of steel i beams on
Nov 2, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3316.9.2 no 16/32 hour rigging certificate for personnel working w/rigging equipment,hoisting outside a bldg. at time of inspection of a spider crane i observed the installation of steel i beams on a steel
Nov 2, 2016 · Penalty $1,600
Resolve - Class - 1
Gc#026044 in adequate safety measures,operations of hoisting equipmentin a unsafe manner. at time of inspection i observed the unsafe operation of a spider crane hoisting steel i beams w/the machines support
Nov 2, 2016 · Penalty $10,000
Resolve - Class - 2
Work w/o a permit. at time of inspection a spider crane in operation erecting steel i beams to a roof structure w/o a proper permit to perform this work. remedy: obtain permit.
Nov 2, 2016
Resolve - Class - 2
3301.5/inspection of equipment.at time of inspectionof 54 sly concretebldg under construction,concrete(embeded)safety straps have only been inspected for floor 2.site plan for floors doesnt indicate how many st
Aug 29, 2016
Resolve - Class - 1
28-110.1/osha 10.at time of inspection use of 54 sty new bldg, has oneworker found not to have an osha 10 card on his possession,while on a site safety project.rem:obtain osha 10 card
Aug 29, 2016 · Penalty $1,600
Resolve - Class - 1
3314.81 partial stop work order for supported scaffold issued pursuant to 28-2072 & posted @ premises.guardrails & toe boards not moved.noted:observed supported scaffold erected all around the bldg.@ working le
Mar 13, 2015
Resolve - Class - 1
3314.5 partial work order for supported scaffold issued pursuant to 28-207.2 & posted @ premises.unsafe working platform.noted:observed supported scaffold erected all around the bldg under permit #421011087-01-
Mar 13, 2015 · Penalty $1,600
Resolve - Class - 2
Partial stop work order for supported scaffold issued pursuant to 28-207.2 & posted @ premises.work does not conform to approved construction documents &/or approved amendments.noted:observed supported scaffold
Mar 13, 2015
Resolve - Class - 2
67m07,98bb05,99m07,100b07,68m07,72m07,40o02,56o02,60x10,12q03,15m07, 69m07. 67m07-emergency phone; 100b07-provide 21'toe guard.
Nov 8, 2013 · Penalty $2,500
Resolve - Class - 2
99bb05,67m07,70o02,71x10,72m07,40o02,56o02,41l10,52m07,77q03,100b07,69m07,68m07,60x10,39o02. 67m07-emergency phone; 52m07-hoist ropes shackled spin out; 77q03-exposed wiring underside platform;100b0721-toeguar
Nov 8, 2013 · Penalty $2,500
Resolve - Class - 2
97x10 - restore to service that full inspection can be performed.
Nov 8, 2013
Resolve - Class - 2
97x10 - restore to service that full inspection could be performed.
Nov 8, 2013
Resolve - Class - 2
97x10 restore to service that full inspection can be performed.
Nov 8, 2013
Resolve - Class - 2
97x10 - restore to service that full inspection could be performed.
Nov 8, 2013
Resolve - Class - 2
97#05. failure to maintain elevator device. respondent failed to allowmandatory annual inspection by the dept or approved agency per 28-304.6.1 and appendix k of the bldg code: multiple attempts to gain access
Apr 15, 2013 · Penalty $500
Resolve - Class - 2
Failure to maintain elevator device. respondent failed to allow mandatory annual inspection by the dept or approved agency per 28-304.6.1 & appendix k of bldg code. multiple attempts to gain access to perform
Apr 15, 2013 · Penalty $500
Resolve - Class - 2
97#05. failure to maintain elevator device. respondent failed to allowmandatory annual inspection by the dept or approved agency per 28-304.6.1 and appendix k of bldg code. multiple attempts to gain access to
Apr 15, 2013 · Penalty $500
Resolve - Class - 2
97#05. failure to maintain elevator device. respondent failed to allowmandatory annual inspection by the dept or approved agency per 28-304.6.1 and appendix k of bldg code. multiple attempts to gain access to
Apr 15, 2013 · Penalty $500
Resolve - Class - 2
97#05. failure to maintain elevator device. respondent failed to allowmandatory annual inspection by the dept or approved agency per 28-304.6.1 and appendix k of the bldg code. multiple attempt to gain access
Apr 15, 2013 · Penalty $500
Resolve - Class - 2
Failure to maintain elevator device. respondent failed to allow mandatory annual inspection by the dept or approved agency per 28-304.6.1 & appendix k of bldg code. multiple attempts to gain access to perform
Apr 15, 2013 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: observed at time of inspection the exterior walls of the 6 story masonry vacant factory,loose pieces of concrete & stucco leaning & separating from the
Feb 14, 2013 · Penalty $1,000
Resolve - Hazardous
05x10/06h09 05x car gate track damaged
Feb 23, 2004 · Penalty $500
Resolve - Non-hazardous
01x10/05n10
Feb 23, 2004 · Penalty $500
Resolve - Hazardous
65x10/06n09 05x-car gate not closing
Feb 23, 2004 · Penalty $500
Resolve - Non-hazardous
Failure to maintain ( interior ) building wall. in that a non bearing concrete masonary wall appropriate 30' long and 15' high is missing on the south east section of premises 1st floor . remedy: erect concrete
Jan 31, 2000 · Penalty $180
Resolve - Non-hazardous
75u,57o,30o,
Jul 15, 1998 · Penalty $2,500
Resolve
Complaints
- Water leak
Damp spot
Sep 28, 2026 · Apt 3414
Close - Heat/hot water
Entire building
Sep 27, 2026 · Apt 17K
Close - Heat/hot water
Entire building
Sep 26, 2026 · Apt BUILDI
Close - Door/window
Window frame
Aug 28, 2026 · Apt 2006
Close - Heat/hot water
Entire building
Aug 8, 2026 · Apt BLDG
Close - Safety
Smoke detector
Jul 12, 2026 · Apt 5406
Close - Plumbing
Basin/sink
Jun 14, 2026 · Apt 404
Close - Paint/plaster
Wall
Apr 21, 2026 · Apt 3904
Close - Heat/hot water
Apartment only
Mar 23, 2026 · Apt 3904
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close
Show 34 more ↓
- Paint/plaster
Wall
Feb 9, 2026 · Apt 670
Close - Water leak
Slow leak
Feb 9, 2026 · Apt 670
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 670
Close - Door/window
Door
Feb 3, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jan 2, 2026 · Apt 670
Close - Paint/plaster
Wall
Jan 2, 2026 · Apt 670
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Dec 11, 2025 · Apt APT171
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt APT171
Close - Plumbing
Water supply
Jun 19, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
May 2, 2024 · Apt 209
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt 3714
Close - General
Cooking gas
Jan 13, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 19, 2023 · Apt 4901
Close - Paint/plaster
Window/frame
Jul 29, 2023 · Apt 4307
Close - Plumbing
Steam pipe/riser
Dec 29, 2022 · Apt 505
Close - Plumbing
Steam pipe/riser
Dec 28, 2022 · Apt 505
Close - Heat/hot water
Entire building
Jun 17, 2022 · Apt 3307
Close - Heat/hot water
Entire building
Apr 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2022 · Apt 227
Close - Plumbing
Steam pipe/riser
Jan 5, 2022 · Apt 505
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2021 · Apt 310
Close - Unsanitary condition
Pests
Sep 14, 2021 · Apt 310
Close - Unsanitary condition
Pests
Sep 14, 2021 · Apt 310
Close - Unsanitary condition
Pests
Sep 14, 2021 · Apt 308
Close - Unsanitary condition
Pests
Sep 14, 2021 · Apt 308
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 14, 2021 · Apt 308
Close - Heat/hot water
Apartment only
Feb 18, 2021 · Apt 371
Close - Heat/hot water
Apartment only
Oct 31, 2020 · Apt 4102
Close - Plumbing
Water supply
Oct 31, 2020 · Apt 4102
Close - Plumbing
Radiator
Oct 31, 2020 · Apt 4102
Close - Plumbing
Toilet
Mar 22, 2019 · Apt 574
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1929
- Floors
- 54
- Residential units
- 790
- Building area
- 710,860 ft²
- Lot area
- 66,000 ft²
- Zoning
- M1-5/R9
- Community board
- 402
- Council district
- 26
- Block / lot
- 266 / 3
- Assessed value
- $83,363,400
- Landmark / historic district
- No
HPD registration #432582, last renewed Sep 24, 2025.
Questions about 43-22 Queens Street
Who owns 43-22 Queens Street?
The owner of record in NYC Department of City Planning PLUTO data is 43-22 Queens Street L.l.c..
Does 43-22 Queens Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 43-22 Queens Street rent stabilized?
NYC Department of Finance tax bills listed 790 rent-stabilized units here in 2024 (about 100% of its 790 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 43-22 Queens Street built?
City records list 1929 as the year it was built.
How many apartments are in 43-22 Queens Street?
It has 790 residential units and 791 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.