43-29 39 Place
Queens, NY 11104BBL 4-00190-0013Map
Owner of record: Orwell Building Corp
43-29 39 Place is a walk-up apartment building built in 1929 in Queens, 11104. It has 40 residential units across 4 floors. The owner of record is Orwell Building Corp. HPD has recorded 99 housing violations here, most recently on December 30, 2024. 1 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 99
- DOB violations
- 21
- ECB violations
- 27
- HPD complaints
- 187
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 99
- CImmediately hazardous
Remove the illegal fastening consisting of key operated lock installed on bulkhead door to roof restricting access into building at public hall, 4th story
Dec 30, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temprature of 130 degrees at all hot water fixtures. in the entire apartment located at apt 49, 4th story, 3rd apartment from south at west
Dec 14, 2024 · Apt 49
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixture at ceiling at public hall, 2nd story
Nov 17, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Apr 16, 2019
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceiling and south wall with fire retardant plaster at bulkhead
Mar 15, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 15, 2019
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction material at bulkhead at public hall stairs
Mar 15, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall at bulkhead
Mar 15, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 1, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 1st living room from north located at apt 11, 1st story, 1st apartment from south at west
Jul 27, 2015 · Apt 11
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall and ceiling. in the 1st living room from north located at apt 31, 3rd story, 1st apartment from south at west
Jul 27, 2015 · Apt 31
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 2nd living room from east located at apt 33, 3rd story, 4th apartment from north at east
Jul 27, 2015 · Apt 33
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the 1st bedroom from east located at apt 45, 4th story, 2nd apartment from north at east
Jul 27, 2015 · Apt 45
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the bathroom located at apt 33, 3rd story, 4th apartment from north at east
Jul 27, 2015 · Apt 33
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling. in the bathroom located at apt 33, 3rd story, 4th apartment from north at east
Jul 27, 2015 · Apt 33
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded sheet rock ceiling at cellar south.
Jul 27, 2015
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes storage of flower pots. etc. all stories at south fire escape.
Jul 27, 2015
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective - in the entrance located at apt 45, 4th story, 2nd apartment from north at east
Feb 5, 2013 · Apt 45
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 3rd room from east located at apt 45, 4th story, 2nd apartment from north at east
Feb 5, 2013 · Apt 45
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Aug 1, 2011 · Apt 48
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 12a, 1st story
Jan 13, 2011 · Apt 12A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling er-1 in the 1st bedroom from east located at apt 12a, 1st story
Jan 13, 2011 · Apt 12A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of cascading water leak ceiling er-1 in the 1st bedroom from east located at apt 12a, 1st story
Jan 13, 2011 · Apt 12A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt 12a, 1st story, apartment at east
Jan 13, 2011 · Apt 12A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling er-1 at center livingroom located at apt 12a, 1st story, apartment at east
Jan 13, 2011 · Apt 12A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of cascading water leak ceiling er-1 center livingroom located at apt 12a, 1st story, apartment at east
Jan 13, 2011 · Apt 12A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - ANon-hazardous
Refit door to in the 2nd room from north at east located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at east located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical out let north wall in the kitchen located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet in the 1st room from north at west located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at west located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the bathroom located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets washbasin in the bathroom located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - ANon-hazardous
Refit door to in the 1st room from north at west located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the entire apartment located at apt 48, 4th story, 4th apartment from west at north
Jan 7, 2011 · Apt 48
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 1st room from north at east located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at window frame in the bathroom located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly secure the loose electric outlet at east wall in the 1st room from north at west located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed - BHazardous
Repair the broken or defective connection at leaky radiator shut-off valve in the 1st room from north at east located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor under radiator in the 1st room from north at east located at apt 48, 4th story, 4th apartment from south at west
Jan 5, 2011 · Apt 48
Closed — Violation closed
DOB building violations · 21
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 15, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 16, 1997
Dob violation - dismissed - Construction other optional
8
Nov 14, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 11 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jun 24, 1993
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Jun 24, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
May 25, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 23, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 26, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 28, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 29, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 2, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Oct 30, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
Mp
Aug 27, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 27
- Class - 2
Missing chimney drain as per fgc 501.16 construction plans not on site as per mc107.2(3); fgc-misc, comply with notice of violation
Feb 22, 2021
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. note: sidewalk shed have been erected all around the bldg under permit #440109428-01-eq-sh. 1.sws section next to main entr
Jul 21, 2014 · Penalty $250
Resolve - Class - 2
Sidewalk shed information panel not in compliance w/secion.note:sidewalk shed have been erected all around the building. the information panel not in compliance with section. rmdy: comply w/code.
Jul 21, 2014
Resolve - Class - 2
Sidewalk shed does not meet code specification. underside at sws shall be lighted at all time either by natural or artificial light.note:sidewalk shed have been erected all around the bldg under permit #440109
Jul 21, 2014
Resolve - Class - 2
B254./16/50a/50b/50c/50d/50e/ 50a-steam lines leakiing bad must be replaced and leaking near electrical fixture. 50b-piping to mixing valve leaking. 50c-valve req. on top of oil tank on suction line. 50d-bolt
Mar 8, 2014 · Penalty $500
Resolve - Class - 2
B254,15,32a,48b,50a,50b,50c,50d,50e,50f,50g,50h. 50a-need support for discharge pipe for relief valve; 50b-no band iron on smoke pipe,solid strap or hangers; 50c-seal all holes in boiler room; 50d-valve missing
Mar 6, 2013 · Penalty $500
Resolve - Hazardous
Failure to comply with the commissioners order to file a certificate of correction with the dob for violation #'s34337279l & 34415978l as issued on 8/23/02 & 11/11/03 respectively. remedy: file certificate of
Oct 10, 2007
Resolve - Hazardous
Failure to maintain bldg. defect:plaster lathe ceiling defective and missing in dwelling unit #30 -(#3 left) approx -10'x10' section missingand defective at front section or living at the above premises and
Nov 11, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintian building noted : in cellar n/w corner of bldg floor joists wood rotted loose and floor slent and nto in straight level possible structure stability affected above floor remedy : immediately
Aug 23, 2002 · Penalty $800
Resolve - Hazardous
Failure to maintain. defect is: missing part of the concrete retainingwall at rear of this building. the size of the defective retaining wall is approx 15' long x 8' high. remedy: make safe immediately.
Oct 16, 1997
Resolve
Show 17 more ↓
- Hazardous
Failure to maintain: missing of retaining wall in rear of this building size approx 16 wide x 8 high. remedy: make safe immediately obtain necessary permits & approvals.
Nov 14, 1995
Resolve - Hazardous
Failure to maintain exterior the masonry (concute block) retaining wall for party property line is defective broken out of plumb creating a hazardous condition * rear of replace for multiple dwelling *43-28 43-
Apr 7, 1995
Resolve - Hazardous
Work without a permit creating hazardous contitions noted temporay wood.sharing has been erected at the rear area way 2-the nood material is in a state exposure deterioration,creating a compromise to sharing in
Apr 7, 1995
Resolve - Hazardous
Failure to maintain exterior noted the concrete block wall at rear one story garage is building out of plumb and in danger of collapse onto required replace area.remedy make all necessary repairs to the staes
Apr 7, 1995
Resolve - Non-hazardous
Failure to maintain cement block retaing wall in rear collapsed remedy:obtain permit and make all necessary repairs.
Feb 1, 1995 · Penalty $875
Resolve - Non-hazardous
Failure to maintain: cement block retaining wall in rear collapsed. remedy: obtain a permit and make all necessary repairs.
Jan 19, 1995
Resolve - Hazardous
Failure to maintain.defect is:concrete block retaining wall at rear lot line has sollalpsed.remedy:obtain plermit and make all necessary repairs
Oct 5, 1994
Resolve - Non-hazardous
Failing to maintain: defect is concrete block retaining wall at rear lot line has collapsed, (formed out) remedy: obtain permits- make area safe to moke all necessary repairs
Sep 16, 1993
Resolve - Hazardous
Failing to maintain defect is concrete block retaining wall at rear lot line has collapsed. remedy: obtain permits & make all necessary repairs
Aug 25, 1993 · Penalty $350
Resolve - Non-hazardous
Failure to maintain defect is concrete black retaining wall at rear lot line has collapsed. remedy:obtain permits and make all necessary repairs.
Jul 29, 1993
Resolve - Non-hazardous
Failure to maintain. cement block retaining wall in rear collapsed. remedy:obtain permit and make all neccessary repair.
Dec 29, 1992 · Penalty $5,000
Resolve - Non-hazardous
Failure to maintain defect is cement block wall at rear has collapsed.remedy:obtain a permit and make all repairs.
Dec 2, 1992
Resolve - Non-hazardous
Failure to maintain: cement block retaining wall in rear collapsed remedy: obtain a permit and make all necessary repairs.
Nov 30, 1992
Resolve - Non-hazardous
Failure to maintain: cement block retaining wall in rear collapsed. remedy: obtain a permit and make all necessary repairs
Jun 4, 1992
Resolve - Non-hazardous
Failing to maintain a cement block reataining wall in rear collapsed remedy: obtain a permit and make all necessary repairs.
Mar 3, 1992
Resolve - Non-hazardous
Failure to maintain:cement block retaining wall in rear collapsed. remedy:obtain a permit and make all necessary repairs.
Jan 6, 1992 · Penalty $720
Resolve - Non-hazardous
Failure to maintain cement block retaining wall in rear collapsed. remedy:obtain permit and make all neccessary repairs.
Oct 7, 1991
Resolve
Complaints
- Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 21, 2024 · Apt 44
Close - Heat/hot water
Entire building
Nov 15, 2024 · Apt 44
Close - Heat/hot water
Entire building
Oct 11, 2024 · Apt BLDG
Close - Water leak
Heavy flow
May 4, 2022 · Apt 42
Close - Unsanitary condition
Mold
Jan 9, 2022 · Apt 46
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2020 · Apt BLDG
Close - Water leak
Slow leak
Feb 9, 2020 · Apt 46
Close - Heat/hot water
Apartment only
Jan 23, 2020 · Apt 45
Close - Water leak
Slow leak
Jan 23, 2020 · Apt 45
Close - Heat/hot water
Apartment only
Jan 23, 2020 · Apt 45
Close - Water leak
Slow leak
Mar 8, 2019 · Apt 45
Close - Water leak
Slow leak
Mar 8, 2019 · Apt 45
Close - Water leak
Slow leak
Mar 8, 2019 · Apt 45
Close - Heat/hot water
Apartment only
Jan 31, 2019 · Apt 45
Close - Door/window
Door
Mar 13, 2017 · Apt 10
Close - Paint/plaster
Ceiling
Mar 13, 2017 · Apt 10
Close - Safety
Window guard broken/missing
Mar 13, 2017 · Apt 10
Close - Unsanitary condition
Mold
Mar 13, 2017 · Apt 10
Close - Appliance
Electric/gas range
Mar 13, 2017 · Apt 10
Close - Electric
Outlet/switch
Mar 13, 2017 · Apt 10
Close - Water leak
Damp spot
Mar 13, 2017 · Apt 10
Close - Flooring/stairs
Floor
Mar 13, 2017 · Apt 10
Close - Unsanitary condition
Pests
Mar 13, 2017 · Apt 10
Close - Plumbing
Steam pipe/riser
Mar 13, 2017 · Apt 10
Close - Heat/hot water
Apartment only
Dec 16, 2016 · Apt 45
Close - Safety
Fire escape
Aug 2, 2016 · Apt 12A
Close - Door/window
Window frame
Aug 2, 2016 · Apt 12A
Close - Paint/plaster
Ceiling
Aug 2, 2016 · Apt 12A
Close - Paint/plaster
Ceiling
Jul 29, 2016 · Apt 12A
Close - Door/window
Window frame
Jul 29, 2016 · Apt 12A
Close - Safety
Fire escape
Jul 29, 2016 · Apt 12A
Close - Heat/hot water
Apartment only
Feb 15, 2016 · Apt 45
Close - Heat/hot water
Entire building
Jan 24, 2016 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 6, 2015 · Apt 19
Close - Safety
Smoke detector
Mar 6, 2015 · Apt 19
Close - Safety
Carbon monoxide detector
Mar 6, 2015 · Apt 19
Close - Heat/hot water
Apartment only
Jan 2, 2015 · Apt 45
Close - Heating
Heat related
Feb 9, 2014 · Apt 45
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1929
- Floors
- 4
- Residential units
- 40
- Building area
- 28,600 ft²
- Lot area
- 9,400 ft²
- Zoning
- R7A
- Community board
- 402
- Council district
- 26
- Block / lot
- 190 / 13
- Assessed value
- $1,437,750
- Landmark / historic district
- No
HPD registration #401528, last renewed Jul 29, 2026.
Questions about 43-29 39 Place
Who owns 43-29 39 Place?
The owner of record in NYC Department of City Planning PLUTO data is Orwell Building Corp.
Does 43-29 39 Place have violations?
Yes. NYC HPD has recorded 99 housing violations at this property.
Is 43-29 39 Place rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 40% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 43-29 39 Place built?
City records list 1929 as the year it was built.
How many apartments are in 43-29 39 Place?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.