43-11 49 Street
Queens, NY 11104BBL 4-00138-0007Map
Owner of record: Francis Apartments
43-11 49 Street is an elevator apartment building built in 1931 in Queens, 11104. It has 56 residential units across 6 floors. The owner of record is Francis Apartments. HPD has recorded 39 housing violations here, most recently on October 2, 2024. 18 of the 39 most recent violations are still open. City tax records listed 51 rent-stabilized apartments here in 2024.
- HPD violations
- 39
- DOB violations
- 29
- ECB violations
- 14
- HPD complaints
- 48
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- CImmediately hazardous
M/d law abate the nuisance consisting of fire passageway sealed up with concrete obstructing 2nd means of egress from rear yard to building front
Oct 2, 2024
Open — Nov certified late - CImmediately hazardous
M/d law abate the nuisance consisting of concrete extension erected below dropladder obstructing travel of dropladder fire escape south yard
Oct 2, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall fire stair at basement
Oct 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper installed street entrance door to building
Oct 2, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper installed on vestibule door to public hall basement
Oct 2, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material north wall fire stair at basement
Oct 2, 2024
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at 1st public hall bulkhead from east, 6th story
Sep 3, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls at 1st public hall bulkhead from east, 6th story
Sep 3, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 6th story
Sep 3, 2024
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed
Show 29 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2016
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective washbasin base cabinet water damage in the bathroom located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Refit wood doors on cabinet at north wall above sink in the kitchen located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock and assembly at door in the entrance located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 00; wg to repair = 0; in the entire apartment located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective oven at gas range in the kitchen located at apt 2h, 2nd story, 2nd apartment from west at north
Dec 8, 2015 · Apt 2H
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 4f, 4th story, 4th apartment from south at west
May 26, 2013 · Apt 4F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector innoperative located at apt 4f, 4th story, 4th apartment from south at west
Apr 23, 2013 · Apt 4F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). innoperative located at apt 4f, 4th story, 4th apartment from south at west
Apr 23, 2013 · Apt 4F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4f, 4th story, 4th apartment from south at west
Apr 23, 2013 · Apt 4F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 1st room from north at west located at apt 4f, 4th story, 4th apartment from south at west
Apr 23, 2013 · Apt 4F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall west wall and ceiling in the bathroom located at apt 5h, 5th story, 2nd apartment from west at north
Apr 5, 2006 · Apt 5H
Open — Not complied with - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 5d, 5th story, 2nd apartment from south at west
Sep 30, 2003 · Apt 5D
Open — Not complied with - BHazardous
Replace with new the missing braces for airconditioners at windows at 1,2 and 5 sty at bldg front at entire apartment, apartment
Jun 23, 2002
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective masonry arond flu pipe boiler room cellar.
Dec 6, 1997
Open — False certification - BHazardous
Properly repair the broken or defective locking assembly vestibule door 1 sty public hall.
Aug 13, 1996
Open — False certification - BHazardous
Repair or replace the smoke detector defective at 6 sty northwest apt 6f mr chon. , section '' ''
Jun 19, 1995 · Apt 6F
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective bottom sash of kitchen window at 6 sty northwest apt 6f. , section '' ''
Jun 19, 1995 · Apt 6F
Open — Nov sent out - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway padlocked gate north fire passageway er1.
Aug 21, 1994
Open — False certification - BHazardous
D26-13.03 adm code abate the nuisance consisting of vermin roaches kitchen & bathrm 1 sty apt 1g. , section '' ''
Jun 28, 1994 · Apt 1G
Open — Nov sent out - ANon-hazardous
D26-22.03 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jun 28, 1994
Open — Nov sent out - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill 5 sty south front.
Jun 28, 1994
Open — Nov sent out - BHazardous
Repair or replace the smoke detector 6 sty rear apt 6i mrs burr. , section '' ''
Apr 8, 1988 · Apt 6I
Open — Nov sent out - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 4 sty apt 4g. , section '' ''
Oct 3, 1985 · Apt 4G
Open — Nov sent out - ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls & clg 4 sty apt 4g thruout. , section '' ''
Oct 3, 1985 · Apt 4G
Open — Nov sent out - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors entrance 2 sty apt 2g. located at apt 2g
Oct 3, 1985 · Apt 2G
Open — Nov sent out
DOB building violations · 29
- Construction other optional
Borough commissioner has ordered work stopped for job # q01158659-i1 due to intent to revoke approval and permit.
Dec 1, 2025
Dob violation - dismissed - Construction other optional
Ftm bldg in a code compliant manner.obsvd @ exp1 deteriorate mortar joints @multiple locations of parapet & masonry cracks btwn ground-2fl @ 1/2corner.@exp2 obsvd masonry cracks 2 parapet level.immed comply w/ commissioner's order control #341558 and vio #061025pi40201sb to repair the building under permit
Aug 26, 2025
Dob violation - active - Construction other optional
Ftm bldg in a code compliant manner.obsvd @ exp1 deteriorated mortar joints @ mult locations of parapet & masonry cracks btwn ground-2fl @ 1/2 corner.@ exp2 obsvd masonry cracks @ paraper level.owner to immed retain nyspe to eval entire bldg determine struct stab & prepare file repair dwgs bldg t/be repaired under permit starting 7/9/2025
Jun 10, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active
Show 19 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 8, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2006
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Apr 21, 2005
Dob violation - active - Elevator elevatorrequired
4p2932
Apr 2, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Elevator elevatorrequired
4p2932
Mar 30, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Elevator elevatorrequired
(51)file a bn and secure a permit for the installation of new fraction sheave as per nyc admin code rs18
Jun 1, 1989
Dob violation - resolved - Elevator elevatorrequired
1)acc relay 47a)post elev co sign same b)repair door to close properly and lock same 51)repair cab tile floor covering 52)provide in cab capacity plate 2000lbs
Nov 14, 1988
Dob violation - resolved
ECB violations · 14
- Class - 2
Failure to certify corrections for violation number 39126696y, file a certificate of correction
Oct 7, 2026 · Penalty $1,250
Active - Class - 2
Failure to certify corrections for violation number 39126695m, file a certificate of correction
Oct 7, 2026 · Penalty $1,250
Active - Class - 1
Failure to obtain permits and certificate of correction for violation # 39126695 m, comply with commissioner's order
May 1, 2025 · Penalty $2,500
Active - Class - 2
Failure to certify corrections for violation 39126696y, file a certificate of correction
May 1, 2025 · Penalty $1,250
Active - Class - 1
Work without a building: there is a masonry cmu structure at exposure 4 rear yard approximately 15'x10'x8'high, at exposure 2 and 3 there are 2 cmu walls erected on the outside, on the inside there is 3 partiti
Oct 4, 2024 · Penalty $2,500
Active - Class - 1
Passageway obstructed: the passageway at exposure 2/3 is obstructed with illegal cmu walls, at exposure 4 the drop down ladder at rear yard is obstructed with an illegal cmu structure at time of inspection, rem
Oct 4, 2024 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #912072. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior bldg west elevation exp#1 observed cracks and deteriorating in parapet facade arund the vent openings,north end; blocks of wood under a/c units, 2nd and 4th floors; flower pot stor
Aug 31, 2016 · Penalty $250
Resolve - Class - 2
67x10 - emergency phone.
Jan 21, 2014
Resolve - Class - 2
99bb05,100m07,40m07,100b07. 100b07-provide 21'toeguard; 40m07-provide fire extinguisher in motor room; 100m07-provide missing step on steps to motor room.
Aug 6, 2013
Resolve
Show 4 more ↓
- Non-hazardous
Failrue to submit a fifth round technical reprot in compliance with code providions:periodic inspecion of exterior walls and appurtenances as required by local law 11 of 1998 and the department of building rule
Jun 3, 2005
Resolve - Hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenancesas required by local law 11 of 1998 and the department of buildings
May 20, 2005 · Penalty $700
Resolve - Non-hazardous
Failure to provide elevator landing sign that shall read : " in case of fire, use stairs unless otherwise instructed" at the elevator bank on floor 1 to 6. remedy : install sign as per local law 16/1984
Dec 19, 2002 · Penalty $200
Resolve - Non-hazardous
39a05. #39 installednew traction sheave without a permit.
Jan 14, 1991
Resolve
Complaints
- Elevator
Maintenance
Aug 1, 2024 · Apt BLDG
Close - Elevator
Maintenance
Jul 23, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Jan 30, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 16, 2021 · Apt 2I
Close - Heat/hot water
Apartment only
Feb 16, 2021 · Apt 2I
Close - Heat/hot water
Entire building
Feb 12, 2021 · Apt 5B
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 4C
Close - Door/window
Door
Dec 4, 2015 · Apt 2H
Close - General
Cabinet
Dec 4, 2015 · Apt 2H
Close - Appliance
Refrigerator
Dec 4, 2015 · Apt 2H
Close
Show 38 more ↓
- Appliance
Electric/gas range
Dec 4, 2015 · Apt 2H
Close - General
Cabinet
Dec 4, 2015 · Apt 2H
Close - Paint/plaster
Wall
Apr 18, 2013 · Apt 4F
Close - Heating
Heat related
Jan 23, 2013 · Apt NA
Close - Heating
Heat related
Nov 8, 2012 · Apt 2H
Close - Paint/plaster
Wall
Mar 31, 2009 · Apt 1G
Close - Heating
Heat related
Mar 31, 2009 · Apt 1G
Close - Electric
Electric-supply
Mar 31, 2009 · Apt 1G
Close - Plumbing
Bathtub/shower
Jul 7, 2008 · Apt 5H
Close - Plumbing
Water-leaks
Jul 7, 2008 · Apt 5H
Close - Paint/plaster
Ceiling
Jul 7, 2008 · Apt 5H
Close - Paint/plaster
Ceiling
Jul 7, 2008 · Apt 5H
Close - Plumbing
Water-leaks
Jun 2, 2006 · Apt 5H
Close - Plumbing
Bathtub/shower
Jun 2, 2006 · Apt 5H
Close - Plumbing
Water-leaks
Jun 1, 2006 · Apt 5H
Close - Plumbing
Water-leaks
Jun 1, 2006 · Apt 5H
Close - Appliance
Electric/gas range
Feb 3, 2006 · Apt 2E
Close - Nonconst
Vermin
Feb 3, 2006 · Apt 2E
Close - Nonconst
Vermin
Feb 3, 2006 · Apt 2E
Close - Plumbing
Toilet
Feb 3, 2006 · Apt 2E
Close - Paint/plaster
Ceiling
Feb 3, 2006 · Apt 2E
Close - Plumbing
Water-leaks
Feb 3, 2006 · Apt 2E
Close - Heating
Heat related
Nov 26, 2005 · Apt 2H
Close - Heating
Heat related
Nov 19, 2005 · Apt 6H
Close - Plumbing
Water-leaks
Oct 14, 2005 · Apt 5H
Close - Plumbing
Water-leaks
Jun 27, 2005 · Apt 5H
Close - Plumbing
Bathtub/shower
Jun 27, 2005 · Apt 5H
Close - Nonconst
Vermin
Dec 2, 2004 · Apt 4I
Close - Paint/plaster
Ceiling
May 8, 2004 · Apt 5D
Close - Plumbing
Water-leaks
May 8, 2004 · Apt 5D
Close - Heating
Heat related
Dec 4, 2003 · Apt 4-H
Close - Heating
Heat related
Dec 4, 2003 · Apt 2C
Close - General
Floor
Sep 26, 2003 · Apt 5D
Close - General
Floor
Sep 26, 2003 · Apt 5D
Close - General
Floor
Sep 26, 2003 · Apt 5D
Close - General
Floor
Sep 26, 2003 · Apt 5D
Close - Nonconst
Vermin
Sep 25, 2003 · Apt 5D
Close - Nonconst
Vermin
Sep 25, 2003 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1931
- Floors
- 6
- Residential units
- 56
- Building area
- 39,320 ft²
- Lot area
- 10,900 ft²
- Zoning
- R7A
- Community board
- 402
- Council district
- 26
- Block / lot
- 138 / 7
- Assessed value
- $2,155,500
- Landmark / historic district
- No
HPD registration #400154, last renewed Oct 17, 2025.
Questions about 43-11 49 Street
Who owns 43-11 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is Francis Apartments.
Does 43-11 49 Street have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 43-11 49 Street rent stabilized?
NYC Department of Finance tax bills listed 51 rent-stabilized units here in 2024 (about 91% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 43-11 49 Street built?
City records list 1931 as the year it was built.
How many apartments are in 43-11 49 Street?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.