5-26 51 Avenue
Queens, NY 11101BBL 4-00034-0034Map
Owner of record: Bell Gerard F
5-26 51 Avenue is a walk-up apartment building built in 1931 in Queens, 11101. It has 6 residential units across 3 floors. The owner of record is Bell Gerard F. HPD has recorded 22 housing violations here, most recently on May 6, 2026. 5 of the 22 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 23
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 11, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
May 24, 2022 · Apt 2R
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and all walls throughout in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
May 24, 2022 · Apt 2R
Open — Certification postponment granted - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
May 24, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 3, 2022
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin waterbugs. in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lock. at south 2 window. in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed
Show 12 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling. in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing. in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lock. at north 2 window. in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west
Jan 18, 2022 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items. at public hall, 3rd story
Jan 18, 2022
Closed — Violation dismissed - BHazardous
Make safe by properly repairing the structural defect bulging wall. at east. at public hall, 1st story
Jan 18, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 27, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 27, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 27, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Jan 14, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Jan 14, 2021
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors front entrance door to building , 1st story
Jan 14, 2021
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 1
- Class - 2
Exposed wires,missing plate for electric box in ceiling,seal base of chimney,termination of combustion air not 30" high,correct violations & send in certificate of correction
Nov 23, 2021 · Penalty $312
Active
Complaints
- Electric
No lighting
Nov 19, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Nov 19, 2023 · Apt 2L
Close - Electric
Power outage
Nov 19, 2023 · Apt 2L
Close - Paint/plaster
Ceiling
Oct 25, 2022 · Apt 2R
Close - Unsanitary condition
Pests
May 20, 2022 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
May 20, 2022 · Apt 2R
Close - Plumbing
Bathtub/shower
Mar 7, 2022 · Apt 2R
Close - Plumbing
Bathtub/shower
Mar 7, 2022 · Apt 2LR
Close - Plumbing
Bathtub/shower
Jan 4, 2022 · Apt 2R
Close - Unsanitary condition
Pests
Jan 4, 2022 · Apt 2R
Close
Show 13 more ↓
- Heat/hot water
Entire building
Jan 4, 2022 · Apt 2R
Close - Door/window
Window frame
Jan 4, 2022 · Apt 2R
Close - Paint/plaster
Ceiling
Jan 4, 2022 · Apt 2R
Close - Flooring/stairs
Floor
Jan 4, 2022 · Apt 2R
Close - Unsanitary condition
Pests
Jan 4, 2022 · Apt 2R
Close - Paint/plaster
Wall
Jan 4, 2022 · Apt 2R
Close - Water leak
Slow leak
Jan 4, 2022 · Apt 2R
Close - Heat/hot water
Entire building
Nov 14, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 13, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Jan 12, 2021 · Apt 1R
Close - Unsanitary condition
Pests
Aug 28, 2020 · Apt 1R
Close - Heat/hot water
Entire building
Mar 27, 2015 · Apt 3YT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,425 ft²
- Lot area
- 2,500 ft²
- Zoning
- M1-4/R6B
- Community board
- 402
- Council district
- 26
- Block / lot
- 34 / 34
- Assessed value
- $671,850
- Landmark / historic district
- No
HPD registration #402874, last renewed Jul 10, 2025.
Questions about 5-26 51 Avenue
Who owns 5-26 51 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bell Gerard F.
Does 5-26 51 Avenue have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 5-26 51 Avenue rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 33% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 5-26 51 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 5-26 51 Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.