3030 Brighton 12 Street
Brooklyn, NY 11235BBL 3-08709-0072Map
Owner of record: 3030 Brighton LLC
3030 Brighton 12 Street is an elevator apartment building built in 1931 in Brooklyn, 11235. It has 96 residential units across 6 floors. The owner of record is 3030 Brighton LLC. HPD has recorded 417 housing violations here, most recently on April 17, 2026. 2 of the 50 most recent violations are still open. City tax records listed 96 rent-stabilized apartments here in 2024.
- HPD violations
- 417
- DOB violations
- 15
- ECB violations
- 14
- HPD complaints
- 1,295
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 417
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 17, 2026
Closed — Violation closed - ANon-hazardous
Replace with new the missing safety covers for electrical outlets at all walls at public hall, 1st story
Apr 17, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Open — First no access to re- inspect violation - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the compactor closet at public hall, 3rd story, section ''north''
Nov 10, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of excessive storage of material and bags in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Nov 10, 2025 · Apt 3E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st story balcony at building front at fire escape
Oct 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Oct 1, 2025 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of excessive storage of material garbage, household items and construction waste in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Oct 1, 2025 · Apt 3E
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Oct 1, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Oct 1, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''south''
Oct 1, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at compactor closet second stry at public hall, 1st story
Sep 5, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet at public hall, 5th story
Sep 5, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet at public hall, 2nd story
Sep 5, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the the floor at compactor closet at public hall, 1st story
Sep 5, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 5th story
Aug 9, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 1st story
Aug 9, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 3rd story
Aug 9, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at compactor closet, 3rd story
Aug 9, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 6th story
Aug 9, 2025
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 2nd story
Aug 9, 2025
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. at compactor closet, 2nd story
Aug 9, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ unaccessible ] at public hall, 1st story
Mar 13, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 6k, 6th story, 6th apartment from south at west
Feb 24, 2025 · Apt 6K
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at hot water fixture in the kitchen located at apt 6h, 6th story, 4th apartment from south at west
Feb 24, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 6h, 6th story, 4th apartment from south at west
Feb 24, 2025 · Apt 6H
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6h, 6th story, 4th apartment from south at west
Feb 24, 2025 · Apt 6H
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6h, 6th story, 4th apartment from south at west
Feb 24, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Feb 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north at west located at apt 6h, 6th story, 4th apartment from south at west
Feb 24, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6k, 6th story, 2nd apartment from south at west , section ''north''
Feb 12, 2025 · Apt 6K
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 6th story, section ''north''
Feb 12, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at compactor closet, 6th story, section ''north''
Feb 12, 2025
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at apt 3n, 3rd story, 1st apartment from north at east
Oct 24, 2024 · Apt 3N
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing duct tape at vestibule door at public hall, 1st story
Oct 24, 2024
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st private hallway from east located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame, ceiling, 1st closet from west at north wall door, 1st closet from east at south wall door, 1st closet from east at south wall door frame in the foyer located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, ceiling, baseboard at north wall in the 1st room from east at north located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 8, 2024 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective broken wire glass at 2nd window lower sash at south , intermidiate landing between 3rd and 4th story at public hall stairs, 3rd story
Jul 17, 2024
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of air conditioner protruding over window sill at 2nd story balcony from west at north ,preventing egress from 3rd story balcony at building front at fire escape, 2nd story
Jul 17, 2024
Closed — Violation dismissed
DOB building violations · 15
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 5 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
Stop all work immediately,make site safe
Jul 18, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p2366
Nov 15, 1999
Dob violation - resolved - Elevator elevatorrequired
(51) r/r motor room light
Dec 6, 1988
Dob violation - resolved
ECB violations · 14
- Class - 2
Failure to maintain building in code-compliant manner. at time of inspection observed hallways from floors 1-5 metal fire doors have been installed on a combustible wood frame. remedy: replace all wood frames w
Jan 11, 2024 · Penalty $655
Resolve - Class - 1
Cease use item: repair door lock monitor, this is a safety device to insure passangers safety., *** to return device to service contact nyc dob by emailing [email protected] ( retaring cam and the gate swit
Jul 25, 2022 · Penalty $3,125
Resolve - Class - 2
Provide pit light switch., replace/repair govornor tention sheave., provide fire proof cabinet in the motor room., provide in-case of fire signs on all floors., provide brailles on all floors., provied resistor
Feb 3, 2022
Resolve - Class - 2
Provide pit light switch., provide in-case of fire signs on all floors., provide brailles on all floors., provide fire proof cabinet in the motor room.
Feb 3, 2022
Resolve - Class - 2
20180924
Aug 9, 2018 · Penalty $312
Resolve - Class - 2
Missing in case of fire signs, misaligned cab mirror, worn tension sheave guides, inoperative phone, replace or adjust door checks where needed, provide access to mr
Aug 9, 2018
Resolve - Class - 1
Electrical work w/o a permit new installation of pannel box. new box cable ran throughtout apt. 1d no permit on file at the time of inspection 4:40pm. remedy: obtain electrial permit
Jun 11, 2013 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit. installation of new copper piping in apt 1d. new hot & cold water pipe installed in bathroom area. no permit on file at the time of inspection: 4:40 pm. remedy: obtain permit.
Jun 11, 2013 · Penalty $1,600
Resolve - Class - 1
Performing plumbing work unlicensed. installation of new copper pipingin apt 1d. new hot & cold water pipe installed in bathroom area. no permit on file @ the time of inspection: 4:40 pm. remedy:obtain plumbing
Jun 11, 2013 · Penalty $2,500
Resolve - Non-hazardous
86u5/38l10/59q3/40i10/12l10/16b1/16t7/66z4/10d6/84k11/.86-perform & file 2yr test.38-car fan defective.59-motor room light unguarded.40-motor room door self closing & self locking.12-car lights out.16-adjust 6
Apr 19, 2007
Resolve
Show 4 more ↓
- Non-hazardous
B4a/34a/34b/
Jul 16, 2002 · Penalty $180
Resolve - Non-hazardous
08v, 15h, 21l,73o,
Dec 17, 1992 · Penalty $200
Resolve - Non-hazardous
21m 25q 35p 35 unable to gain access to complete inspection
Jan 12, 1991 · Penalty $150
Resolve - Non-hazardous
09h 14m 21m 25q 37g 46k 53x 55x 73m 73 five year test and file elv3 and tag properly
Jan 12, 1991 · Penalty $150
Resolve
Complaints
- Heat/hot water
Entire building
Oct 17, 2026 · Apt 3N
Close - Plumbing
Basin/sink
Mar 5, 2026 · Apt 3E
Close - Plumbing
Bathtub/shower
Mar 5, 2026 · Apt 3E
Close - Electric
No lighting
Nov 13, 2025 · Apt 3E
Close - Electric
Power outage
Nov 9, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Nov 3, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Oct 24, 2025 · Apt 3E
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 3N
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 3N
Close - Appliance
Electric/gas range
Oct 9, 2025 · Apt 3E
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 9, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Aug 29, 2025 · Apt 3E
Close - Paint/plaster
Cabinet
Aug 29, 2025 · Apt 3E
Close - General
Cabinet
Aug 1, 2025 · Apt 3E
Close - Unsanitary condition
Garbage/recycling storage
Aug 1, 2025 · Apt 3E
Close - Appliance
Electric/gas range
Aug 1, 2025 · Apt 3E
Close - Electric
Outlet/switch
Jul 14, 2025 · Apt 3E
Close - Paint/plaster
Wall
Jul 14, 2025 · Apt 3E
Close - Plumbing
Toilet
Jun 30, 2025 · Apt 3E
Close - Electric
Outlet/switch
Jun 30, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Mar 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Feb 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2024 · Apt 3N
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt 3N
Close - Heat/hot water
Entire building
Oct 25, 2024 · Apt BLDG
Close - Plumbing
Water supply
Oct 23, 2024 · Apt 3N
Close - Heat/hot water
Entire building
Oct 17, 2024 · Apt 3N
Close - Plumbing
Water supply
Oct 3, 2024 · Apt 2A
Close - Plumbing
Bathtub/shower
Oct 3, 2024 · Apt 2A
Close - Unsanitary condition
Pests
Aug 16, 2024 · Apt 2A
Close - Plumbing
Bathtub/shower
Jun 25, 2024 · Apt 3E
Close - Heat/hot water
Entire building
May 4, 2024 · Apt 3N
Close - Heat/hot water
Entire building
Nov 18, 2023 · Apt 3N
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt 3N
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt 3N
Close - Unsanitary condition
Pests
Oct 6, 2023 · Apt 3E
Close - Door/window
Door
Oct 6, 2023 · Apt 3E
Close - Unsanitary condition
Mold
Oct 6, 2023 · Apt 3E
Close - Safety
Carbon monoxide detector
Oct 6, 2023 · Apt 3E
Close - Plumbing
Bathtub/shower
Sep 9, 2023 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1931
- Floors
- 6
- Residential units
- 96
- Building area
- 100,800 ft²
- Lot area
- 24,000 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8709 / 72
- Assessed value
- $2,810,700
- Landmark / historic district
- No
HPD registration #313077, last renewed Sep 4, 2025.
Questions about 3030 Brighton 12 Street
Who owns 3030 Brighton 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is 3030 Brighton LLC.
Does 3030 Brighton 12 Street have violations?
Yes. NYC HPD has recorded 417 housing violations at this property.
Is 3030 Brighton 12 Street rent stabilized?
NYC Department of Finance tax bills listed 96 rent-stabilized units here in 2024 (about 100% of its 96 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3030 Brighton 12 Street built?
City records list 1931 as the year it was built.
How many apartments are in 3030 Brighton 12 Street?
It has 96 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.