3022 Brighton 5 Street
Brooklyn, NY 11235BBL 3-08674-0010Map
Owner of record: 3022 Brighton Realty INC
3022 Brighton 5 Street is a hotel built in 1899 in Brooklyn, 11235. The owner of record is 3022 Brighton Realty INC. HPD has recorded 152 housing violations here, most recently on May 7, 2026. 32 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 152
- DOB violations
- 15
- ECB violations
- 27
- HPD complaints
- 208
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 152
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilling in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile at floor at community bathroom, 1st story
May 7, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden sill at window in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color window recess in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls at community bathroom, 1st story
May 7, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls at community kitchen, 1st story
May 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door entrance in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north located at b-room 5, 1st story, 1st b-room from east at south
May 7, 2026 · Apt 5
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 5, 1st story, 1st apartment from east at south
Jan 13, 2026 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5, 1st story, 1st apartment from east at south
Jan 13, 2026 · Apt 5
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1, 1st story, 1st apartment from north at east
Mar 21, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the room located at b-room 1, 1st story, 1st b-room from east at south
Mar 14, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the room located at b-room 1, 1st story, 1st b-room from east at south
Mar 14, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the 1st entrance from north located at b-room 1, 1st story, 1st b-room from east at south
Mar 14, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the room located at b-room 12, 4th b-room from east at south
Mar 14, 2025 · Apt 12
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the 1st entrance from north located at b-room 12, 4th b-room from east at south
Mar 14, 2025 · Apt 12
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the room located at b-room 12, 4th b-room from east at south
Mar 14, 2025 · Apt 12
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building entrance door
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at building north yard
Jun 5, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 21, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 7, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door at community bathroom at public hall, 2nd story
Jul 1, 2020
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door to community bathroom at public hall, 1st story
Jul 1, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the soffit at roof at east
Jul 1, 2020
Closed — Violation closed - BHazardous
Replace with new the broken or defective rotted wood at gable of roof at east
Jul 1, 2020
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder stack at building north yard at fire escape
Jun 16, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... the ceiling and walls in the bathroom located at apt 1, 1st story
Sep 19, 2019 · Apt 1
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the ceiling and walls at the communal bathroom at basement
Sep 19, 2019
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the east wall in the 5th room from north located at b-room, section ''basement''
Sep 19, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls in the kitchen located at apt 1, 1st story
Sep 19, 2019 · Apt 1
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... at the east wall in the 5th room from north located at b-room, section ''basement'' original violation 13297155 issued 19-sep-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 19, 2019
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... at the ceiling and walls at the communal bathroom at basement original violation 13297149 issued 19-sep-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 19, 2019
Open — Defect letter issued - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire room throughout in the 5th room from north located at b-room, section ''basement''
Sep 19, 2019
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the 5th room from north located at b-room, section ''basement''
Sep 19, 2019
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls at the communal bathroom at basement
Sep 19, 2019
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 1, 1st story
Sep 19, 2019 · Apt 1
Open — Not complied with
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Dec 28, 2009
Dob violation - active - Construction other optional
C-construction other optional
Mar 25, 2006
Dob violation - active
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 27
- Class - 1
Failure to comply with commissioner's order contained in summons/violation #35384408r issued 2/28/19 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.at basement work w/o permit.remedy:c
Sep 25, 2021 · Penalty $6,250
Resolve - Class - 1
Failure to comply with commissioner's order contained in summons/violation #35384408r issued on 07/26/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with commis
Jun 29, 2021 · Penalty $12,500
Resolve - Class - 1
Work w/o a permit. failure to comply w/the comm's order contained in summons/vio#35384408r issued on 07/26/19 & to file a cert of correctionpursuant to 28-201.1 & 1rcny 102-01. previous ecb#35519729n. remedy: c
Nov 18, 2020 · Penalty $12,500
Resolve - Class - 1
Work without a pemrit failure to comply with the commissioners order contained in summons/violation #35384408r issued on 07-26-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01
Aug 25, 2020 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35384409z issued on 02-28-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by the c of o or dob records
Feb 6, 2020 · Penalty $1,280
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35384409z issued on 02/28/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.occupancy contrary to
Dec 24, 2019 · Penalty $3,125
Resolve - Class - 2
Occupancy contrary to that allowed by the building department records.hpd record 212529 indicates 2story unit and 11b units,at time of inspection found that the one car garage at mean is illegally converted and
Sep 26, 2019 · Penalty $3,125
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35384408r issued on 07/26/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. b101: work w/o a permit(cellar class'a'apt w/3pc bathroom,kitch
Sep 19, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35384409z issued on 02-28-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. b103: occupancy contrary to that allowed by the c of o or bldg
Sep 19, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation# 35384409z issued on 02/28/19 and to file a certificate of correction to pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary
Jul 26, 2019 · Penalty $3,125
Resolve
Show 17 more ↓
- Class - 1
Failure to comply with the commissioner's order contained in summons/violation# 35384408r issued on 02/28/19 and to file a certificate of correction to pursuant to 28-201.1 and 1rcny 102-01. work without a perm
Jul 26, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35384409z issued on 2/28/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary to that
May 18, 2019 · Penalty $3,125
Resolve - Class - 1
I observed from pictures bathroom sink not correctly vented on 1st and 2nd floors , repair and/replace
Mar 8, 2019 · Penalty $6,250
Active - Class - 2
Loose cement at flue to chimney-storage+debris in boiler room
Mar 1, 2019 · Penalty $1,562
Resolve - Class - 1
Work w/o a permit. observed substantially complete construction of a class a studio apt in the basement rear w/ a 3 piece bathroom;toilet,shower stall and sink. also a kitchen sink. observed window opening cut
Feb 28, 2019 · Penalty $6,250
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or building dept records. observed basement level rear occupied w/ a class a studio apt w/ a 3 piece bathroom and kitchen. access to boiler room inside apt only.
Feb 28, 2019 · Penalty $6,250
Resolve - Class - 3
Work w/o a permit. noted: partition walls erected creating 3 pc bathroom and kitchen area w/gas and water lines. plumbing work for heater & boiler room created at side of garage. bathroom & kitchen w/2x4 & 2x3
Dec 4, 2009 · Penalty $200
Active - Class - 3
Occupancy contrary to that allowed by the bldg dept. record, note : one car garage illegally converted to habitable space, 3pc bathroom & kitchen area observed @ rear garage. remedy: discontinue illegal use & /
Dec 4, 2009
Resolve - Class - 1
Occupancy contrary to that allowed by c/o and dob records - detached garage converted into class 'a' partitions erected creating rooms, kitchen and bathroom fixtures present. remedy: discontinue illegal use of
Nov 20, 2009 · Penalty $2,400
Active - Non-hazardous
Failure to comply w/an order of the commissioner to correct nov #34623151j, issued on 12-24-07 for removing 2 kitchens from basement creating 5 rooms & common kitchen at 1st fl. no access to premises to check
May 6, 2008 · Penalty $1,500
Active - Hazardous
Work w/o a permit work noted: removed 2 kitchen from basement. built and removed partitions created 5 furnished rooms & common kitchen at 1st floor. remedy: obtain permit if feasibel or restore to prior legal
Dec 24, 2007 · Penalty $800
Active - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. certificate of occupancy # 141379. from: one family's dwelling & 2 furnished rooms on 1st floor. and five
Dec 24, 2007 · Penalty $3,050
Resolve - Non-hazardous
Fence exceeds permitted height noted: wood fence at rear is approx. 8'high exceeds permitted 6 ft height. remedy: conform fence to code.
Mar 25, 2006
Resolve - Non-hazardous
Work without a permit. work noted: garage door. removed residential swing door installed as well as residential crank window. appears to be converted to habitable space/office or a residence. remedy: obtain
Jan 19, 2006 · Penalty $250
Resolve - Non-hazardous
Work w/o a permit-noted garage door removed/replaced with crank windowunit and swing door at rear yard (masonary garage) w/o permit. remedy:obtain permit or restore garage to prior legal condition.
Nov 1, 2005
Resolve - Hazardous
Failure to maintain. note at front of building left side, metal white gutter away from fascia board and in danger of falling. this is hazardous condition. repair gutter, maintain building.
Sep 21, 1999 · Penalty $800
Resolve - Non-hazardous
Failure to maintain note:-in rear yard between garages: 12t mattreses/box springs covered w/leaves& rotting dicarded bed frame,wood,plywood,car seat,white door,iron sink ,tv st, cot frame,metal window and rugs.
Sep 4, 1999 · Penalty $800
Resolve
Complaints
- Paint/plaster
Ceiling
May 6, 2026 · Apt 5
Close - Paint/plaster
Wall
May 6, 2026 · Apt 5
Close - Flooring/stairs
Floor
May 6, 2026 · Apt 5
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 22, 2025 · Apt 5
Close - General
Signage missing
May 2, 2024 · Apt BLDG
Close - General
Signage missing
Jan 28, 2024 · Apt BLDG
Close - Safety
Fire escape
Jan 28, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Jun 3, 2020 · Apt 2
Close - Door/window
Door
Jun 3, 2020 · Apt 2
Close
Show 40 more ↓
- Door/window
Door
Mar 24, 2020 · Apt 2FL
Close - Plumbing
Toilet
Sep 13, 2019 · Apt 1
Close - Unsanitary condition
Pests
Sep 13, 2019 · Apt 1
Close - Unsanitary condition
Pests
Sep 13, 2019 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 13, 2019 · Apt 1
Close - Paint/plaster
Wall
Sep 13, 2019 · Apt 1
Close - Water leak
Heavy flow
Sep 13, 2019 · Apt 1
Close - Unsanitary condition
Pests
Sep 13, 2019 · Apt 1
Close - Unsanitary condition
Mold
Jun 14, 2019 · Apt 5
Close - Paint/plaster
Ceiling
Jun 14, 2019 · Apt 5
Close - Door/window
Window frame
Jun 14, 2019 · Apt 5
Close - Paint/plaster
Wall
Jun 14, 2019 · Apt 5
Close - Door/window
Door
Jun 14, 2019 · Apt 5
Close - Paint/plaster
Ceiling
Jun 14, 2019 · Apt 5
Close - Electric
Wiring
Jun 14, 2019 · Apt 5
Close - Door/window
Door
Feb 18, 2019 · Apt 5
Close - Paint/plaster
Ceiling
Feb 18, 2019 · Apt 5
Close - Paint/plaster
Ceiling
Feb 18, 2019 · Apt 5
Close - Electric
Outlet/switch
Feb 10, 2019 · Apt 12
Close - Paint/plaster
Wall
Feb 10, 2019 · Apt 12
Close - Unsanitary condition
Pests
Feb 10, 2019 · Apt 12
Close - Unsanitary condition
Pests
Feb 10, 2019 · Apt 12
Close - Electric
Outlet/switch
Jan 14, 2019 · Apt 5
Close - Door/window
Door frame
Jan 14, 2019 · Apt 5
Close - Heat/hot water
Apartment only
Jan 14, 2019 · Apt 5
Close - Water leak
Heavy flow
Jan 14, 2019 · Apt 5
Close - Plumbing
Bathtub/shower
Oct 16, 2018 · Apt 2
Close - Plumbing
Toilet
Oct 16, 2018 · Apt 2
Close - Water leak
Slow leak
Oct 16, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Apr 16, 2018 · Apt 5
Close - Heat/hot water
Entire building
Mar 5, 2018 · Apt 5
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 1
Close - Heat/hot water
Entire building
Jan 3, 2017 · Apt 3
Close - Door/window
Door
Nov 11, 2016 · Apt BSMT11
Close - Unsanitary condition
Pests
Nov 11, 2016 · Apt BSMT11
Close - Heat/hot water
Apartment only
Nov 11, 2016 · Apt BSMT11
Close - Electric
Outlet/switch
Nov 11, 2016 · Apt BSMT11
Close - Flooring/stairs
Floor
Nov 11, 2016 · Apt BSMT11
Close - Unsanitary condition
Pests
Nov 11, 2016 · Apt BSMT11
Close - Unsanitary condition
Pests
Nov 11, 2016 · Apt BSMT11
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (HR)
- Year built
- 1899
- Floors
- 2
- Residential units
- —
- Building area
- 2,880 ft²
- Lot area
- 2,800 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8674 / 10
- Assessed value
- $89,100
- Landmark / historic district
- No
HPD registration #358041, last renewed Sep 28, 2024.
Questions about 3022 Brighton 5 Street
Who owns 3022 Brighton 5 Street?
The owner of record in NYC Department of City Planning PLUTO data is 3022 Brighton Realty INC.
Does 3022 Brighton 5 Street have violations?
Yes. NYC HPD has recorded 152 housing violations at this property.
Is 3022 Brighton 5 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024. To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3022 Brighton 5 Street built?
City records list 1899 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.