2970 Ocean Avenue
Brooklyn, NY 11235BBL 3-07440-0041Map
Owner of record: Eva Stern 2970 LLC
2970 Ocean Avenue is a walk-up apartment building built in 1927 in Brooklyn, 11235. It has 39 residential units across 4 floors. The owner of record is Eva Stern 2970 LLC. HPD has recorded 660 housing violations here, most recently on October 5, 2026. 18 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 660
- DOB violations
- 4
- ECB violations
- 8
- HPD complaints
- 2,283
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 660
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d1, 4th story, 1st apartment from west at north
Oct 5, 2026 · Apt D1
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 3rd stroy balcony at 1st fire escape from south at building front
Jul 27, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill at 4th stroy balcony at 1st fire escape from south at building front
Jul 27, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). ceiling, 1st door frame from south at west wall, 1st window frame from east at south wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at east wall in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at ceiling in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st window frame from north at east wall in the 1st room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Not complied with
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the foyer located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the foyer located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north wall in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door frame from south at west wall, 1st window frame from east at south wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame in the foyer located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the 1st room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the kitchen located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the foyer located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the private hallway located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall, north wall in the 3rd room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, ceiling, west wall, 1st door frame from south at west wall in the 1st room from east located at apt h2, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt H2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercomunication system from building front to south wall. in the kitchen located at apt d1, 4th story, 1st apartment from east at south , section ''north''
May 28, 2026 · Apt D1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at 1st public hall from north, 2nd story
May 19, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to tenant's phone in the entire apartment located at apt c3, 3rd story, 2nd apartment from west at north
May 19, 2026 · Apt C3
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north, south, east and west walls in the bathroom located at apt c4, 3rd story, 1st apartment from west at north
May 19, 2026 · Apt C4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c4, 3rd story, 1st apartment from west at north
May 19, 2026 · Apt C4
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c4, 3rd story, 1st apartment from west at north
May 19, 2026 · Apt C4
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice at public hall, 1st story
May 19, 2026
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of door with key operated lock preventing egress to fire escape in the 3rd room from east located at apt c4, 3rd story, 1st apartment from west at north , section ''north''
Apr 22, 2026 · Apt C4
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at 1st stack from south at west building front at fire escape, 3rd story
Apr 22, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes airconditioner protruding beyond window sill approx more than 4 inches at 1st stack from south at west building front at fire escape, 3rd story
Apr 22, 2026
Closed — Violation dismissed - BHazardous
Properly secure the loose fuse box at west wall in the foyer located at apt c4, 3rd story, 1st apartment from west at north , section ''north''
Apr 22, 2026 · Apt C4
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c4, 3rd story, 1st apartment from west at north , section ''north''
Apr 22, 2026 · Apt C4
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt c4, 3rd story, 1st apartment from west at north , section ''north''
Apr 22, 2026 · Apt C4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north, west, and and south wall in the bathroom located at apt c4, 3rd story, 1st apartment from west at north , section ''north''
Apr 22, 2026 · Apt C4
Open — Nov sent out
DOB building violations · 4
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Electric signs none
Es-electric signs none
Nov 3, 1993
Dob violation - dismissed
ECB violations · 8
- Class - 2
Observed electrical power and switching supplied to exterior hvac unit , no permit was filed .prior electrical applications not applicable, obtain all permits
Aug 23, 2024 · Penalty $1,250
Resolve - Class - 3
Failure to maintain bldg in code compliant manner.note:chainlink fencebroken leaning§ion of metal from fence fell onto grade below @frontyard of premises.metal corner post&gate post is leaning out of plumb
Dec 30, 2020 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg in code compliant manner re: installation of plumbing material.in apt 3c behind kitchen gas stove,observation was made on gas pipe 3/4 inch black union was installed before the gas shut
Jun 20, 2013
Resolve - Class - 1
Failure to maintain building in code complaint manner.noted:at 1919 avenue r ground floor barber shops entire ceiling is endanger of collapse.center hanging light fixture has fallen,exposed bx and electrical at
Jun 4, 2010 · Penalty $500
Resolve - Class - 3
Failure to maintain premises in a code compliant manner ceiling in lobby at 1st fl main entry is water damaged remedy: make site safe repairs replacements maintain premises as per dob code and regulation
Mar 23, 2009
Resolve - Class - 3
50-relief valve on cold water line n/g 50a-missing air gap & blow down piping on backflow 50b-missing shut off valves on oil pressure gauges 50c-missing cover on controls.
Mar 11, 2009
Resolve - Non-hazardous
B4a,21a,32a,45a,50a,b,c,d,e,f,g,h,i,j,k,3a,28a,33b,45b.50a-mixing valve rotted & leaking.50b-530c valve not piped down.50c-pressure contentsto be put dirty on anti syphon(pigtail).50d-excessive soot in boiler
Nov 27, 2007 · Penalty $180
Resolve - Non-hazardous
Failure to maintain metal ceiling, loose, missing, hanging and defective, various locations of entire ceiling, 1st level store (1919 ave z) remedy: make all necessary repairs to the satisfaction of this dept
May 20, 1991
Resolve
Complaints
- Plumbing
Water supply
Oct 9, 2026 · Apt C4
Open - Unsanitary condition
Pests
Sep 28, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Sep 18, 2026 · Apt D1
Close - Plumbing
Water supply
Aug 21, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Jul 26, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jul 17, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jul 14, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jul 13, 2026 · Apt D1
Close - Unsanitary condition
Pests
Jul 13, 2026 · Apt D1
Close - Unsanitary condition
Garbage/recycling storage
Jun 17, 2026 · Apt D1
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jun 17, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jun 17, 2026 · Apt D1
Close - Unsanitary condition
Pests
Jun 17, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jun 14, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
Jun 9, 2026 · Apt D1
Close - Unsanitary condition
Pests
Jun 6, 2026 · Apt D1
Close - Unsanitary condition
Mold
May 28, 2026 · Apt H2
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt H2
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt H2
Close - General
Cabinet
May 28, 2026 · Apt H2
Close - Paint/plaster
Wall
May 28, 2026 · Apt H2
Close - General
Bell/buzzer/intercom
May 26, 2026 · Apt D1
Close - Unsanitary condition
Pests
May 23, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
May 21, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
May 17, 2026 · Apt D1JUST
Close - General
Bell/buzzer/intercom
May 15, 2026 · Apt D1
Close - Unsanitary condition
Pests
May 13, 2026 · Apt C4
Close - General
Bell/buzzer/intercom
May 8, 2026 · Apt C3
Close - General
Bell/buzzer/intercom
May 7, 2026 · Apt D1
Close - General
Bell/buzzer/intercom
May 6, 2026 · Apt C6
Close - Heat/hot water
Entire building
Apr 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt C3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 4
- Residential units
- 39
- Building area
- 36,000 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7A
- Community board
- 315
- Council district
- 48
- Block / lot
- 7440 / 41
- Assessed value
- $955,800
- Landmark / historic district
- No
HPD registration #300075, last renewed Jul 24, 2025.
Questions about 2970 Ocean Avenue
Who owns 2970 Ocean Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Eva Stern 2970 LLC.
Does 2970 Ocean Avenue have violations?
Yes. NYC HPD has recorded 660 housing violations at this property.
Is 2970 Ocean Avenue rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 97% of its 39 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2970 Ocean Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 2970 Ocean Avenue?
It has 39 residential units and 44 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.