2375 East 3 Street
Brooklyn, NY 11223BBL 3-07179-0058Map
Owner of record: 2375 East 3rd Street, LLC
2375 East 3 Street is an elevator apartment building built in 1957 in Brooklyn, 11223. It has 135 residential units across 6 floors. The owner of record is 2375 East 3rd Street, LLC. HPD has recorded 943 housing violations here, most recently on October 13, 2026. 40 of the 50 most recent violations are still open. City tax records listed 132 rent-stabilized apartments here in 2024.
- HPD violations
- 943
- DOB violations
- 24
- ECB violations
- 38
- HPD complaints
- 1,270
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 943
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and south wall and ceiling in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by the method of reglazing at bathtub in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3v, 2nd story, 1st apartment from south at west
Oct 13, 2026 · Apt 3V
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door
Sep 21, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south
Sep 6, 2026 · Apt 6H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6h, 6th story, 1st apartment from east at south
Sep 6, 2026 · Apt 6H
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at east located at apt 6h, 6th story, 1st apartment from east at south
Sep 6, 2026 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the foyer located at apt 6h, 6th story, 1st apartment from east at south
Sep 6, 2026 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the bathroom , the 2nd room from north, the 4th room from north located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective spring balance lower sash at the 1st window from south at west in the 4th room from north located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall and ceiling in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance lower sash at the 2nd window from south at west in the 2nd room from north located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 3v, 2nd story, 1st apartment from south at west , section at north
Aug 27, 2026 · Apt 3V
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall stairs ''x'' at roof bulk head at public hall
Aug 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall stairs ''x'' at roof bulk head at public hall
Aug 25, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the entire apartment located at apt 6v, 6th story, 1st apartment from south at west
Aug 25, 2026 · Apt 6V
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at bsmt-apt 1u, 3rd bsmt-apt from north at east , section at north
Aug 16, 2026 · Apt 1U
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling , south wall and east wall in the 1st room from east at south located at apt 6f, 5th story, 3rd apartment from north at east , section at south
Aug 12, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6f, 5th story, 3rd apartment from north at east , section at south
Aug 12, 2026 · Apt 6F
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 6f, 5th story, 3rd apartment from north at east , section at south
Aug 12, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2p, 1st story, 1st apartment from north at east , section ''north''
Aug 3, 2026 · Apt 2P
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2p, 1st story, 1st apartment from north at east , section ''north''
Aug 3, 2026 · Apt 2P
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3v, 2nd story, 1st apartment from north at east , section ''north''
Aug 3, 2026 · Apt 3V
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6f, 5th story, 3rd apartment from north at east , section ''south''
Aug 3, 2026 · Apt 6F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at door in the entrance located at apt 5n, 4th story, 1st apartment from west at north , section ''north''
Aug 3, 2026 · Apt 5N
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective bulged masonry retaining wall with dislodged, leaned bricks at wall above and, missing , deteriorated mortar at joints , northwest section, building front yard
Aug 2, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at fire door at east wall at public hall, 3rd story, section at north
Aug 2, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 5, 2026
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information at public hall, 1st story
Jul 5, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jul 5, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7p, 6th story, 1st apartment from north at east , section at north
Jul 5, 2026 · Apt 7P
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on fire door leading to stairs at public hall at basement, section at south
Jul 5, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the kitchen located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 1st story, 2nd apartment from north at east , section ''north''
Jun 26, 2026 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at east staircase door at public hall, section at south
May 12, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood base floor at sink cabinets at south wall in the kitchen located at apt 7e, 7th story, 2nd apartment from north at east
May 4, 2026 · Apt 7E
Closed — Violation closed
DOB building violations · 24
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 20, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 11, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2014
Dob violation - resolved
Show 14 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2004
Dob violation - resolved - Elevator elevatorrequired
3p5061
Dec 12, 2001
Dob violation - resolved - Elevator elevatorrequired
3p5062
Dec 12, 2001
Dob violation - resolved - Elevator elevatorrequired
3p5062
Aug 3, 2000
Dob violation - resolved
ECB violations · 38
- Class - 1
Failure to maintain building code compliant. noted: the partial retaining at wall at left side breezeway is in severe disrepair with the top brick section out of plumb and the bottom section cracking., repair a
Aug 3, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain building in code compliance manner: atoi observed at exp #3 parking lots, water drainages filled with elements preventing water drains in numerous parking spots at exp 4, 3 & 2 ., repair and
Apr 27, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39107265z issued on 02/29/2024, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $1,250
Resolve - Class - 1
The only elevator in section of building out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the device has been returned to servi
Jul 9, 2024 · Penalty $6,250
Resolve - Class - 1
The only elevator in building (or section of building) out of service. upon inspection, the device is found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service imm
Jul 2, 2024 · Penalty $1,250
Resolve - Class - 2
Federal fst-250 boiler=#3 safety valve is leaking/body drain pipes missing at safety valves/pipe leaking at mixing valve;correct violation and submit the certificate of correction
Feb 29, 2024 · Penalty $625
Active - Class - 1
Found federal steam boiler fst-250 with hazardous defect. apt 1b temperature of floor was 135 degrees due to steam pipe leak from boiler. cease use boiler supplying heat to building. use for hot water only. loc
Jan 24, 2024 · Penalty $1,250
Resolve - Class - 1
Observed federal fst 250 boiler gas fired steam boiler. ceased use due to hazardous condition. tubes leaking and water coming out of boiler. do not operate boiler untill all hazardous conditions are immediately
Jan 18, 2024 · Penalty $1,250
Resolve - Class - 2
Unguarded plank switch. self resetting escape hatch switches prohibited. provide readily available keys to roof/machine room.
Nov 27, 2023 · Penalty $625
Resolve - Class - 1
The only elevator in section of building out of service. upon inspection, the device is found to be out-of-service remedy: restore to service immediately and, notify nycdob the device has been returned to servi
Oct 5, 2023 · Penalty $1,250
Resolve
Show 28 more ↓
- Class - 2
Failure to maintain building in code complaint manner : at time of inspection of a 7 story building observed poorly maintained roof created cracks and hole. observed cracks and water damages at celling and arou
Oct 3, 2023 · Penalty $625
Active - Class - 1
Provide current elevator contact information on the controller and main line switch., provide cat 1 year test tag for year 2022., class 1: replace #5 by-passed fuse on the controller.
Jan 11, 2023 · Penalty $1,250
Resolve - Class - 1
Cease use items: repair brake monitoring system., provide proper fuse on the controller ( 10 amp. fuse is in place of a 3amp. fuse ) to return device to service contact nyc dob by emailling [email protected]
Jul 13, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code complaint manner.noted:at time of inspection observed at exposure #1 & #3 several air conditioning units installed in wondows w/o brackets installed exp #1(front)have househ
Oct 29, 2021
Resolve - Class - 2
Sec. 3314.4.3.2 installation inspection. note: at the time of inspection of a 6 sty bldg doing active facade work w/suspended scaffolds. upon review of engineer letter for operation using parapet clamps the wor
Jun 2, 2021 · Penalty $620
Resolve - Class - 1
Failure to provide sidewalk shed where required. note: at the time of inspection of a 6 sty bldg doing facade work under permit#340471439 i observed there were multiple parapet clamps installed at exp#1 for sus
Jun 2, 2021 · Penalty $10,000
Resolve - Class - 2
Failure to maintain building in code compliant manner failure to comply with the commissioners order contained in summons.violation #30-27315h issued on 08-20-20 and to file a certificate of cor
Nov 10, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code-compliant manner. at time of insp. observed at expo: 1,3 a/c units installed in fire escape pathway, landings used as storage area. also expo: 3 fire escape drop ladder tied
Aug 20, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to institite/maintain safety equipment measures or temporary construction.note:at time of my inspection of a building undergoing facade repair,i observed two workers standing on wooden plank which is re
Sep 24, 2019 · Penalty $10,000
Resolve - Class - 2
Scaffold use w/o certificate 4 hour. note:at time of inspection of a 6sty bldg undergoing facade repairs,construction work in progress. i observed 1 worker performing masonary work on a suspended scaffold at ex
Sep 24, 2019 · Penalty $625
Resolve - Class - 2
3308.5 netting. note:at time of my inspection of a 6 story building under construction facade work in progress. i observed loose and missingnetting throughout the perimeter between the top of inner fence and si
Sep 24, 2019 · Penalty $625
Resolve - Class - 2
Bc3303101-tenent protection plan.note:at time of my inspection of a building occupied undergoing facade repairs.construction work in progress.i observed workers performing masonry work on the fire escape at exp
Sep 24, 2019 · Penalty $625
Resolve - Class - 2
Failure to provide approved/accepted plan on site. noted: at time of inspection no plans for sidewalk shed on exp#1 of bldg could be found or provided. remedy: provide approved/accepted plans.
Jul 19, 2018 · Penalty $500
Resolve - Class - 2
Pswo suspended scaffold. failed to notify dept prior to installation of suspended scaffold. noted: at time of inspection adjustable suspended scaffold w/outrigger beams installed on exp#1 of bldg & platform is
Jul 19, 2018 · Penalty $2,500
Resolve - Class - 2
Sec. 3314.3.2 suspended scaffold shall be designed by a registered design professional. noted: at time of inspection suspended scaffold w/c-hooks or provided. there are 2 two-point single tier adjustable suspen
Jul 19, 2018 · Penalty $620
Resolve - Class - 2
Failure to maintain exterior bldg west elevation.exp#1 observed blocksof wood bricks &stones improperly installed under a/c units on the 2nd3rd &7th flrs.south elevation,exp#4 observed bending &deteriorating in
Jun 13, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code-complaint manner noted at time of inspection did observe in north side service entrance corridor large cracks in wall & section of ceiling missing creating a large hole in ceili
Feb 12, 2011 · Penalty $1,000
Resolve - Class - 2
40p17.70o2.100q3.100q top and under car lights
May 4, 2009 · Penalty $500
Resolve - Class - 2
15i11.14i11.16d10.39q340p17. 16d lobby hinge 39q car top light
May 4, 2009 · Penalty $500
Resolve - Non-hazardous
10,m,07,22,l,11,05,b,11 10m provide second gib 22l inside car 05b excessive cleaner between door 5 car enclosure
May 31, 2003 · Penalty $350
Resolve - Non-hazardous
52,y,11,16,h,11,39,d,06,52,b,11,22,l,11 16 h 6fl repair or replace to pivot 39d secure rectifired rear side of contorller 52b lost motion 22l inside car
May 31, 2003 · Penalty $350
Resolve - Non-hazardous
50f,14l,21l,57o.#(211 replace burned out lamps.
Sep 24, 1994
Resolve - Non-hazardous
14l,21x,50f,73o
May 3, 1993
Resolve - Non-hazardous
14l,2x,50f,73o,
May 3, 1993
Resolve - Non-hazardous
14l,21x,35p,55x,57o,58o,59o, (35) unable to gain access to complete inspections
Aug 5, 1992 · Penalty $100
Resolve - Non-hazardous
14l,21x,35p,55x,57o,58o,59o, (35) unable to gain access to complete inspection
Aug 5, 1992 · Penalty $100
Resolve - Non-hazardous
14m,21i,
Apr 15, 1992
Resolve - Non-hazardous
14m,21i
Apr 15, 1992
Resolve
Complaints
- Water leak
Heavy flow
Oct 11, 2026 · Apt 3V
Close - Paint/plaster
Ceiling
Oct 9, 2026 · Apt 3V
Close - Water leak
Slow leak
Oct 9, 2026 · Apt 3V
Close - Water leak
Heavy flow
Sep 24, 2026 · Apt 3V
Close - Water leak
Heavy flow
Sep 2, 2026 · Apt 6H
Close - Safety
Window guard broken/missing
Sep 2, 2026 · Apt 6H
Close - Water leak
Slow leak
Sep 2, 2026 · Apt 6H
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt 6H
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt 6H
Close - Paint/plaster
Ceiling
Aug 24, 2026 · Apt 3V
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Aug 24, 2026 · Apt 3V
Close - Water leak
Heavy flow
Aug 24, 2026 · Apt 3V
Close - Appliance
Refrigerator
Aug 11, 2026 · Apt 4S
Close - Flooring/stairs
Floor
Aug 11, 2026 · Apt 4S
Close - Door/window
Window frame
Aug 11, 2026 · Apt 4S
Close - General
Bell/buzzer/intercom
Aug 11, 2026 · Apt 4S
Close - Appliance
Electric/gas range
Aug 11, 2026 · Apt 4S
Close - Door/window
Window frame
Aug 11, 2026 · Apt 4S
Close - Paint/plaster
Wall
Aug 11, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Aug 11, 2026 · Apt 4S
Close - Unsanitary condition
Mold
Aug 11, 2026 · Apt 4S
Close - Safety
Carbon monoxide detector
Aug 11, 2026 · Apt 4S
Close - Plumbing
Toilet
Aug 11, 2026 · Apt 4S
Close - Safety
Smoke detector
Aug 11, 2026 · Apt 4S
Close - Unsanitary condition
Pests
Aug 11, 2026 · Apt 4S
Close - Plumbing
Bathtub/shower
Aug 11, 2026 · Apt 4S
Close - Safety
Window guard broken/missing
Aug 11, 2026 · Apt 4S
Close - Water leak
Slow leak
Aug 11, 2026 · Apt 4S
Close - Safety
Carbon monoxide detector
Aug 5, 2026 · Apt 4S
Close - Safety
Window guard broken/missing
Aug 5, 2026 · Apt 4S
Close - Unsanitary condition
Mold
Aug 5, 2026 · Apt 4S
Close - Water leak
Slow leak
Aug 5, 2026 · Apt 4S
Close - Safety
Smoke detector
Aug 5, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Aug 5, 2026 · Apt 4S
Close - Unsanitary condition
Pests
Aug 5, 2026 · Apt 4S
Close - Plumbing
Toilet
Aug 5, 2026 · Apt 4S
Close - Door/window
Window frame
Aug 5, 2026 · Apt 4S
Close - Flooring/stairs
Floor
Aug 5, 2026 · Apt 4S
Close - Door/window
Window frame
Aug 5, 2026 · Apt 4S
Close - General
Bell/buzzer/intercom
Aug 5, 2026 · Apt 4S
Close - Door/window
Door
Aug 5, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Aug 5, 2026 · Apt 4S
Close - Plumbing
Bathtub/shower
Aug 5, 2026 · Apt 4S
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 4S
Close - Appliance
Refrigerator
Aug 5, 2026 · Apt 4S
Close - Plumbing
Toilet
Aug 5, 2026 · Apt 4S
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 4S
Close - Paint/plaster
Ceiling
Aug 1, 2026 · Apt 4S
Close - Water leak
Slow leak
Aug 1, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Aug 1, 2026 · Apt 4S
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1957
- Floors
- 6
- Residential units
- 135
- Building area
- 132,160 ft²
- Lot area
- 40,000 ft²
- Zoning
- R4
- Community board
- 315
- Council district
- 44
- Block / lot
- 7179 / 58
- Assessed value
- $4,810,500
- Landmark / historic district
- No
HPD registration #351625, last renewed Oct 14, 2025.
Questions about 2375 East 3 Street
Who owns 2375 East 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is 2375 East 3rd Street, LLC.
Does 2375 East 3 Street have violations?
Yes. NYC HPD has recorded 943 housing violations at this property.
Is 2375 East 3 Street rent stabilized?
NYC Department of Finance tax bills listed 132 rent-stabilized units here in 2024 (about 98% of its 135 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2375 East 3 Street built?
City records list 1957 as the year it was built.
How many apartments are in 2375 East 3 Street?
It has 135 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.