1815 East 17 Street
Brooklyn, NY 11229BBL 3-06821-0275Map
Owner of record: 1815 Property LLC
1815 East 17 Street is an elevator apartment building built in 1964 in Brooklyn, 11229. It has 84 residential units across 6 floors. The owner of record is 1815 Property LLC. HPD has recorded 780 housing violations here, most recently on June 17, 2026. 30 of the 50 most recent violations are still open. City tax records listed 83 rent-stabilized apartments here in 2024.
- HPD violations
- 780
- DOB violations
- 27
- ECB violations
- 37
- HPD complaints
- 2,215
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 780
- ANon-hazardous
Properly repair or replace the broken or defective mixing valve at bathtub in the bathroom located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base at base cabinet under sink in the bathroom located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the the grout inbetween the tiles at east wall in the bathroom located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of water bugs in the entire apartment located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood stool at window at west wall in the 3rd room from east located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the window frame in the 3rd room from east located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Open — Nov sent out - CImmediately hazardous
Properly secure the loose door in the bathroom located at apt l5, 2nd apartment from north at east , section ''outside''
Jun 17, 2026 · Apt L5
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on fire door, 1st from north at public hall, 6th story
Apr 16, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 3rd story
Apr 13, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd stack from north at east building front at fire escape, 4th story
Apr 13, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st stack from north at east building front at fire escape, 3rd story
Apr 13, 2026
Closed — Violation closed - BHazardous
Properly secure the loose closet doors at south in the foyer located at apt 3h, 3rd story, 4th apartment from south at west
Apr 13, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the foyer located at apt 3h, 3rd story, 4th apartment from south at west
Apr 13, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt 3h, 3rd story, 4th apartment from south at west
Apr 13, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 3h, 3rd story, 4th apartment from south at west
Apr 13, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3h, 3rd story, 4th apartment from south at west
Apr 13, 2026 · Apt 3H
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 12, 2026
Open — Not complied with - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway garbage bags at building front at south
Apr 12, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs door at basement
Jan 20, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 4th story
Jan 20, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at balcony at 2nd stack from north at west at fire escape, 4th story
Jan 20, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jan 20, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south wall in the 1st room from north at west located at apt 6f, 6th story, 2nd apartment from south at west
Jan 20, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6f, 6th story, 2nd apartment from south at west
Jan 20, 2026 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 1st story
Jan 20, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 6f, 6th story, 2nd apartment from south at west
Jan 20, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at the ceiling in the bathroom located at apt 6f, 6th story, 2nd apartment from south at west
Jan 20, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at lower window sash at the north wall in the 4th room from east located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of scooter, bicycle and household items at public hall, 3rd story
Jan 7, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 3rd story
Jan 7, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 3rd story
Jan 7, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs door at south wall at basement
Jan 7, 2026
Closed — Violation closed - BHazardous
Replace with new the missing ceramic tile at the west wall in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Jan 7, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 3rd story
Jan 7, 2026
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the south and west walls in the 2nd room from north at west located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base at base cabinet under wash basin in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in the wasteline at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from west at north
Jan 7, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 3rd story
Jan 7, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 4th story
Jan 7, 2026
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at south and west walls in the 2nd room from north at west located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at the ceiling in the kitchen located at apt 3h, 3rd story, 4th apartment from south at west
Jan 7, 2026 · Apt 3H
Closed — Violation closed
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 21, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2020
Dob violation - dismissed - Failure to correct swarmp conditions (facade) facade required
Cycle 8c failure to correct swarmp conditions
Feb 21, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed
Show 17 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 1989
Dob violation - resolved
ECB violations · 37
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #910163. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Resolve - Class - 3
At time of inspection observed at apt 3h wooden floors in both bedrooms poorly maintain. and front door handle loose and not adequately secured, repair and or replace
Dec 17, 2024 · Penalty $250
Resolve - Class - 2
I observed throughout apartment 3h installation of new outlets. no application on file with d.o.b., obtain permit., obtain permit
Dec 16, 2024 · Penalty $800
Active - Class - 2
I observed in the bedroom when i plug my tester into the a/c outlet it has an open ground, comply with ec
Dec 16, 2024 · Penalty $800
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $625
Resolve - Class - 1
At time of inspection observed at exp#3 exit passageway from apartments obstructed by fence at two locations. also bbq with gas propane tank store and othe personal belonginess stored on ground floor roof., rep
Jun 21, 2024 · Penalty $1,250
Active - Class - 2
Failure to notify the dob prior to installation removal of suspended scaffolding and c-hook. at time of inspection observed at exp# 3 installed suspended scaffold and related c-hook, no notification found on do
Jun 21, 2024 · Penalty $2,500
Resolve - Class - 2
Repair in-car emergency phone., provide keys to access elevators motor room
Jan 9, 2023
Resolve - Class - 2
3307.6.3 failure for area to be protected.at the time of inspection ofan existing 6 story building observed sidewalk shed in place with active permit for facade repair.no active work at the time of inspection.
Apr 14, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain/display on site document required by bc chapter 33for c-hook suspended scaffold & access agressment w/adjoining for property for platform parked at time of inspection of active permitted con
Mar 9, 2021 · Penalty $1,250
Resolve
Show 27 more ↓
- Class - 2
Sec. bc3301.2;bc3309.10 failure to provide a roof protection for adjoining property roof at exp#2 & @ safety measures for the suspended scaffold parked on adjoining property walkway/easement at exp@2 w/no contr
Mar 9, 2021 · Penalty $1,240
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
Apr 3, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit a required cycle 8c report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#810163. remedy: submit acceptable required technica
Feb 13, 2020
Resolve - Class - 2
58l10 58-l-10 machine bearing (defective)repair
Nov 3, 2016 · Penalty $250
Resolve - Class - 1
02x10,05x10,80m07. 02x10-alarm bell inoperative; 05x10-car door restrictor inoperative; 80m07-counterweight runby signage missing.
May 6, 2016 · Penalty $1,000
Resolve - Class - 2
01l10,02l10,56b10,58h10,17h11,05l10,70o02,53e01. 01,02l-mutd bell; 56,58-noise vibrations; 17h-replace where needed; 05l-zone lock restrictor; 53e-rubbing tension sheave guard.
Dec 2, 2014 · Penalty $500
Resolve - Class - 2
02x10,68b07,56b10. 02x- alarm bell inoperative 68b- maintenance log not being filled out 58b- grinning noise
Oct 20, 2010 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner provide required corridor width per bc 1016.2;27-369. at time of inspection observed at exterior of premises at exp 4 the partial obstruction of a egress
Jul 29, 2009 · Penalty $500
Resolve - Class - 2
Failure to maintain in a code compliant manner. at time of inspection observed at exp 2 sideyard concrete walkway apprx 15'x40' is defectivein that pavement has many cracks and has even surface creating many
Jun 25, 2009 · Penalty $500
Resolve - Class - 2
98bb05100bb0557b1070o02. 98bb 5 year test 100bb 2year test 57b motor bearings loud grinding noise.
Oct 24, 2008 · Penalty $500
Resolve - Class - 1
16n10 70o02 52a14 74002 21m07 53007 71m07 16t07 100a01 97i10 16m07 cease use items 16 car running w/ lobby hoist door open be fire return to service call 2125665539 70 clean pit 52 shorten hoist cables 74 clea
Jul 15, 2008 · Penalty $1,000
Resolve - Non-hazardous
31h10.17h11.38d06.86bb05.56e10.59q03.59d06.43h08.57h11.64q03.66o02.38d06 car top fan unsecured 59d06 machine room light switch & pipe are loose unsecured
Apr 30, 2008 · Penalty $2,500
Resolve - Non-hazardous
86bb05.55x10.59x07.66o02. 55x10.hoist machine very noisy 59x07 providelight in the motor room & guard it
Apr 21, 2008 · Penalty $180
Resolve - Non-hazardous
10h11,10m11,84h11,38d06,31b10,66o02,21m07,59l10,41g11,55y13,39y02,56l10.10m-2nd car door gib.84h-car door saddle worn.38d-dust covers layingon car top.31b-car guides.21m-4fl interlock cover.59l-conduit coming
Dec 7, 2007 · Penalty $180
Resolve - Non-hazardous
55y10/56e10/21q3/59x10/24x10/41l10:56e main motor noise can be heard in lobby. 21q lobby lock cover 2410 where required.41l car returns to 1 park w/hoistway door partially open. second off 55y
Dec 20, 2006 · Penalty $350
Resolve - Non-hazardous
58y11/55y02/55y13/86bb05/38o02/66o02/08a10/40b07/41a10/10b07/31h10/24l10/71d06. 58-brake pully & shoes soaked w/leaking machine oil. clean &replace shoes, 08-top host releveling, 40-door sign, 41-disconnected
May 18, 2006 · Penalty $500
Resolve - Non-hazardous
38o02/38m07/31f01/66o02/11l07/24l07/55o02/39o02/40d07.(38) clean car top.(38)provide anti-spin out on hoist cables.(31)adjust & lubricate car shoes.(66)clean pit of debris.(11)repair jammed car buttons.(24)rest
Jul 25, 2005
Resolve - Non-hazardous
11q13/17h11/28q3/38y2/39y2/55y13/55e10/57e10/66o2 11q cover hole 17h lobby 2f hoistway door gibs.
Feb 3, 2005 · Penalty $350
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Aug 20, 2004 · Penalty $1,750
Resolve - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection of exterior walls and appurenances as required by local law 11 of 1998 and the department of buildings rules and regulations.remedy:file the
Feb 6, 2004 · Penalty $700
Resolve - Non-hazardous
50y11,18q03,16b11. 16-b- hoistway door- (self closing)
May 24, 2003
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems.remedy:file report.
Oct 31, 2000
Resolve - Non-hazardous
Failure to provide 3" letter elevator i.d. signs on all floors.remedy:provide signage as per local law 16/84 code.
Oct 31, 2000
Resolve - Non-hazardous
46k,75u,50y,73o,40b. provide up over speed tripping switch and certify to proper calibration as per ansi, sections log and 206.4.
Apr 5, 1999
Resolve - Non-hazardous
08,28v,h
Jun 3, 1994
Resolve - Non-hazardous
57o,58o,59o
Dec 22, 1992
Resolve - Non-hazardous
5i 14m 17m 8j 50y
Jan 16, 1991
Resolve
Complaints
- Water leak
Slow leak
Oct 8, 2026 · Apt 5K
Open - Electric
Power outage
Aug 10, 2026 · Apt 3HLOWC
Close - Unsanitary condition
Garbage/recycling storage
Jun 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 1, 2026 · Apt BLDG
Close - Door/window
Door
Apr 27, 2026 · Apt L5LOB5
Close - Paint/plaster
Window/frame
Apr 27, 2026 · Apt L5LOB5
Close - Electric
Lighting
Apr 27, 2026 · Apt L4L5
Close - Unsanitary condition
Garbage/recycling storage
Apr 27, 2026 · Apt L4L5
Close - Door/window
Door
Apr 23, 2026 · Apt L4ANDL
Close - General
Cooking gas
Apr 22, 2026 · Apt 3H
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 3H
Close - Plumbing
Basin/sink
Feb 20, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt 3H
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
Jan 6, 2026 · Apt 4B
Close - Unsanitary condition
Sewage
Jan 6, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Jan 6, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Jan 6, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Jan 6, 2026 · Apt 3H
Close - Appliance
Electric/gas range
Jan 4, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Jan 4, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 6J6E6M
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Water leak
Damp spot
Dec 22, 2025 · Apt 3H
Close - Flooring/stairs
Floor
Dec 22, 2025 · Apt 3H
Close - Door/window
Window frame
Dec 22, 2025 · Apt 3H
Close - Unsanitary condition
Mold
Dec 22, 2025 · Apt 3H
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1964
- Floors
- 6
- Residential units
- 84
- Building area
- 73,932 ft²
- Lot area
- 19,100 ft²
- Zoning
- R5B
- Community board
- 315
- Council district
- 48
- Block / lot
- 6821 / 275
- Assessed value
- $2,698,200
- Landmark / historic district
- No
HPD registration #373640, last renewed Aug 15, 2025.
Questions about 1815 East 17 Street
Who owns 1815 East 17 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1815 Property LLC.
Does 1815 East 17 Street have violations?
Yes. NYC HPD has recorded 780 housing violations at this property.
Is 1815 East 17 Street rent stabilized?
NYC Department of Finance tax bills listed 83 rent-stabilized units here in 2024 (about 99% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1815 East 17 Street built?
City records list 1964 as the year it was built.
How many apartments are in 1815 East 17 Street?
It has 84 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.