1909 Quentin Road
Brooklyn, NY 11229BBL 3-06782-0050Map
Owner of record: 1909 Realy LLC
1909 Quentin Road is an elevator apartment building built in 1922 in Brooklyn, 11229. It has 65 residential units across 6 floors. The owner of record is 1909 Realy LLC. HPD has recorded 571 housing violations here, most recently on April 1, 2026. 2 of the 50 most recent violations are still open. City tax records listed 63 rent-stabilized apartments here in 2024.
- HPD violations
- 571
- DOB violations
- 21
- ECB violations
- 5
- HPD complaints
- 602
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 571
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 6th story
Apr 1, 2026
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchenette located at apt 6k, 6th story, 3rd apartment from east at south
Apr 1, 2026 · Apt 6K
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6k, 6th story, 3rd apartment from east at south
Apr 1, 2026 · Apt 6K
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6k, 6th story, 3rd apartment from east at south
Apr 1, 2026 · Apt 6K
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 4th room from east located at apt 6k, 6th story, 3rd apartment from east at south
Apr 1, 2026 · Apt 6K
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 6k, 6th story, 3rd apartment from east at south
Apr 1, 2026 · Apt 6K
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 11, 2025 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 2c, 2nd story, 1st apartment from south at west
Dec 11, 2025 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from south at west
Dec 11, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door in the compactor closet at public hall, 1st story
Dec 6, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Dec 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5j, 5th story, 2nd apartment from east at south
Dec 6, 2025 · Apt 5J
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6j, 6th story, 2nd apartment from east at south
Dec 6, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches beyond window sill at 1st fire escape from east at south, 6th story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit pertruding more than 4 inches beyond window sill at 1st fire escape from east at south, 2nd story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit pertruding more than 4 inches beyond window sill at 1st fire escape from east at south, 3rd story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit pertruding more than 4 inches beyond window sill at 1st fire escape from east at south, 5th story
Sep 8, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit pertruding more than 4 inches beyond window sill at 1st fire escape from east at south, 5th story
Sep 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 5th story
Sep 8, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 5th story
Sep 8, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1e, 1st story, 2nd apartment from west at north
Sep 8, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hooper door at compactor closet, 5th story
Sep 8, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south wall, west wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, west wall and the ceiling in the 1st private hallway from north located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall, west wall and the ceiling in the 1st private hallway from north located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from north, the foyer , the kitchen , the 1st private hallway from north located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective broken marble saddle at 1st door from north at east in the kitchen located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall and in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the west wall and ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1d, 1st story, 1st apartment from west at north
May 15, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 5th story
May 11, 2025
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence of rat droppings in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north
Apr 28, 2025 · Apt 1E
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation steamriser at north wall in the 1st room from north at east located at apt 1e, 1st story, 2nd apartment from west at north
Apr 28, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a wooden door wedge at fire rated partition door at public hall, 6th story
Apr 28, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 5th room from north located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock at 1st boiler room from east
Jan 19, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from north located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from north located at apt 6j, 6th story, 2nd apartment from east at south
Jan 19, 2025 · Apt 6J
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1d, 1st story, 1st apartment from west at north
Dec 3, 2024 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures stove in the kitchen located at apt 1d, 1st story, 1st apartment from west at north
Dec 3, 2024 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at north
Dec 3, 2024 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, west wall, north wall in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at north
Dec 3, 2024 · Apt 1D
Closed — Violation dismissed
DOB building violations · 21
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 29, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 6, 2012
Dob violation - resolved
Show 11 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2003
Dob violation - resolved - Elevator elevatorrequired
3p1324
Jun 5, 2001
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 28, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 1989
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 1989
Dob violation - resolved
ECB violations · 5
- Class - 2
41t07,41d06,68m07,45m07. 41- t.d cable and properly secure door to overhead. 45m- gov data cable.
May 19, 2009 · Penalty $500
Resolve - Non-hazardous
17m07,57o02,15r09.17-m-07 5 fl 15-r-09- cylinder lock bsmt door
Feb 15, 2000
Resolve - Non-hazardous
50y,51i,37m,35o,57o,35am,15b,75m, 51-bearing main machine 37 chan guard 35a-fire extingusher 15 checks basement 4,6 75-five year test
Jan 5, 1998
Resolve - Non-hazardous
22r, 22#. 22-top emergency exit cover #. remove electric conduit that runs over top emergency exit cover so cover can be open.
Mar 6, 1995 · Penalty $100
Resolve - Non-hazardous
17m, 28h; 03r; 50f; 57o; 74h; 35o; 35m. #03 provide proof of filing for elevator panelling #74 replace car door saddle - #35 remove old control board from motor room #35 provide id of elev co on motor room
May 29, 1991
Resolve
Complaints
- Unsanitary condition
Mold
Mar 25, 2026 · Apt 6K
Close - Unsanitary condition
Mold
Feb 27, 2026 · Apt 6K
Close - Unsanitary condition
Mold
Feb 20, 2026 · Apt 6K
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 3J
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt 3J
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 30, 2025 · Apt 3J
Close - Paint/plaster
Ceiling
Nov 19, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 5J
Close - Door/window
Door
Mar 8, 2025 · Apt BLDG
Close - Water leak
Slow leak
Feb 16, 2025 · Apt 6E
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 25, 2025 · Apt 1E
Close - Heat/hot water
Apartment only
Jan 18, 2025 · Apt 6J
Close - Heat/hot water
Apartment only
Jan 12, 2025 · Apt 3H
Close - Heat/hot water
Apartment only
Dec 28, 2024 · Apt 3J
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt 1E
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt 1G
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 2B
Close - Appliance
Electric/gas range
Dec 10, 2024 · Apt 1D
Close - General
Cooking gas
Dec 2, 2024 · Apt 1D
Close - Appliance
Electric/gas range
Nov 27, 2024 · Apt 1D
Close - Appliance
Electric/gas range
Nov 21, 2024 · Apt 1D
Close - Appliance
Electric/gas range
Oct 25, 2024 · Apt 4I
Close - Door/window
Door frame
Oct 25, 2024 · Apt 4I
Close - Door/window
Window frame
Oct 25, 2024 · Apt 4I
Close - Paint/plaster
Wall
Oct 25, 2024 · Apt 4I
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 4I
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 4I
Close - Flooring/stairs
Floor
Feb 28, 2024 · Apt 2K
Close - Door/window
Window frame
Feb 28, 2024 · Apt 2K
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt 2K
Close - Flooring/stairs
Floor
Feb 28, 2024 · Apt 2K
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt 2K
Close - Heat/hot water
Entire building
Feb 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2024 · Apt BLDG
Close - Plumbing
Bathtub/shower
Oct 2, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Aug 4, 2023 · Apt 3A
Close - Water leak
Heavy flow
Jul 4, 2023 · Apt 6E
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1922
- Floors
- 6
- Residential units
- 65
- Building area
- 54,000 ft²
- Lot area
- 12,000 ft²
- Zoning
- R7A
- Community board
- 315
- Council district
- 48
- Block / lot
- 6782 / 50
- Assessed value
- $1,929,150
- Landmark / historic district
- No
HPD registration #334676, last renewed Aug 18, 2025.
Questions about 1909 Quentin Road
Who owns 1909 Quentin Road?
The owner of record in NYC Department of City Planning PLUTO data is 1909 Realy LLC.
Does 1909 Quentin Road have violations?
Yes. NYC HPD has recorded 571 housing violations at this property.
Is 1909 Quentin Road rent stabilized?
NYC Department of Finance tax bills listed 63 rent-stabilized units here in 2024 (about 97% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1909 Quentin Road built?
City records list 1922 as the year it was built.
How many apartments are in 1909 Quentin Road?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.