1263 East 14 Street
Brooklyn, NY 11230BBL 3-06735-0080Map
Owner of record: Vitagraph Reit, LLC (The)
1263 East 14 Street is an elevator apartment building built in 2017 in Brooklyn, 11230. It has 302 residential units across 8 floors. The owner of record is Vitagraph Reit, LLC (The). HPD has recorded 9 housing violations here, most recently on June 15, 2026. 7 of the 9 most recent violations are still open. City tax records listed 91 rent-stabilized apartments here in 2024.
- HPD violations
- 9
- DOB violations
- 100
- ECB violations
- 67
- HPD complaints
- 36
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east at north located at apt 508a, 5th story, 1st apartment from west at north , section at north
Jun 15, 2026 · Apt 508A
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking and grout joints of ceramic tiles at east, south and west walls around bathtub, in the bathroom located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cauking and grout joints of ceramic tiles at south and west walls around bathtub, in the bathroom located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective caulking from floor tiles to wood baseboard molding at north wall, in the kitchen located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, in the 1st room from east at south located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 805b, 8th story, 4th apartment from north at east
Jul 11, 2025 · Apt 805B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the entrance door to fire staircase at public hall, 8th story, section ''west''
Jul 2, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed
DOB building violations · 100
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 23, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 1, 2017
Vp*-violation unserved ecb- dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 11, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 16, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
ECB violations · 67
- Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#918061.rem:submit acceptable required t
Dec 9, 2022
Resolve - Class - 1
Sec. 3314.4.5.2;3314.4.5.8 individuals who use a supported scaffold,including the person supervising such,shall at a minimum have completed a dept approved training program or course. noted: at time of re-inspe
Apr 24, 2018 · Penalty $1,250
Resolve - Class - 1
Handrails. at time of inspection for an 8story bldg at 8 stys observed that handrails at various floors were inadequate. lack of adequate handrails creates a hazard for a stair fall. rmdy: provide and maintain
Mar 20, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3301.2 holes uncovered. at time of inspection of an 8 story build ing at 8 stys observed multipled opening in the deckin on multiple floors, open holes creates a hazard for either tripping of material or
Mar 20, 2018 · Penalty $625
Resolve - Class - 1
Guardrails. at time of inspection for an 8story bldg at 8 stys observed that guardrails @ various floors were inadequate. guardrails were ill constructed in some area and cables were loose in some areas and som
Mar 20, 2018 · Penalty $5,000
Resolve - Class - 1
Sec. 27-1009(a) pswo supported scaffold. failure to safeguard person & property affected by construction operations. noted: work fell fron 1 level at scaffold to level below causing 2 planks to fall ground belo
Mar 19, 2018 · Penalty $10,000
Resolve - Class - 1
Sec. 3314 scaffold does not meet code specifications. noted: at time of inspection worker doing facade work from scaffold,scaffold not fully planked,planking not tied down missing guardrail system in multiple
Mar 19, 2018 · Penalty $25,000
Resolve - Class - 1
Failure to safeguard all persons/property affected by construction operations no ppe. at time of inspection of a new 8 story bldg at bulkhead level under construction active job site i observed worker at lea
Jan 31, 2018
Resolve - Class - 2
Failure to paint dedicated standpipe/valves in accordance with sectionat time of inspection of a 8 story bldg under construction at bulkheadlevel, active job site, i observed that the dedicated standpipe at 5th
Jan 31, 2018 · Penalty $800
Resolve - Class - 2
Construction superintendent fails to maintain and/or make job site logs available. at time of inspection of an 8 story new building underconstruction at bulkhead level, active job site upon request for the
Jan 31, 2018
Resolve
Show 40 more ↓
- Class - 1
Bc3308.5.3/failure to institute/maintain safety equipment measures or temporary construction-no zero(on floor)cable or inadequately installed.at time of inspection of a 8 story new building at 8th flr level,act
Dec 4, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation:gaps,holes,opening.at time of inspection of new building under construction at roof level active jobsite,i observed holes,openings
Dec 4, 2017
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.at time of inspection of a new building under construction(a building)i observed that there were heaps of debri and other unwanted materials on
Dec 4, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations-no rebar caps.at time of inspection of new 8 story buildingat 8th flr level(section a)i observed that there were rebars which cre
Dec 4, 2017
Resolve - Class - 1
Bc3303.3 watchperson. note: at the time of my inspection of a 8 story building at roof level and partial at 2nd floor level, site closed. upon banging and shouting on fence, gate and open gaps. no watchperson w
Nov 4, 2017 · Penalty $400
Resolve - Class - 2
Bc1022.8:floor signs-at time of inspection observed floor identificatiion signs indicating flor and stair id were not posted,all floors were spray painted to wall and not posted as reqd.rem:comply w/code.
Nov 2, 2017 · Penalty $800
Resolve - Class - 1
Toe boards.at time of inspection of nb up to 8 fl.obseved wood guard rail circling open area approx 5'x3' w/no toeboards at guard rail.this a hazardous condition for any workers at approx 8'below of materials f
Nov 2, 2017 · Penalty $1,000
Resolve - Class - 1
Bc3308.6.2.11:horizontal safety netting.at time of inspection of nb up to 8th fl observed horizontal safety netting had not been cleaned of debris as reqd.no stripping of any kind was occurring above the nets a
Nov 2, 2017 · Penalty $1,600
Resolve - Class - 1
Unsafe/unsuitable electric equipment.at time of inspection observed many extension cords in use had been tampered w/by removal of 3rd prong (ground)against manufacturers requirements for safe usage.rem:comply w
Nov 2, 2017 · Penalty $1,600
Resolve - Class - 1
Bc3309.11:tree protection.at time of inspection observed trees outside property line but inside constructoin site w/no tree protection as reqd by dept of parks and recreation.observed one tree w/bark damage and
Nov 2, 2017 · Penalty $400
Resolve - Class - 1
Guard rails.at time of inspection of nb up to 8th fl observed cable guard rail system w/cable at approx 4"above fl level creating a condition where materials could roll,be kicked or fall off and injure workers.
Nov 2, 2017 · Penalty $2,400
Resolve - Class - 1
Overhead protection.observed no overhead protection provided at entry located at corner of east 14 st and chestnut.this creates a condition where workers entering or leaving site could be hit by falling debris
Nov 2, 2017 · Penalty $10,000
Resolve - Class - 1
Bc3301.7:design drawing for safety embedded straps.at time of inspection observed concrete embedded safety straps located at 1st fl by floor opening and 2nd fl along perimeter of bldg.while looking at drawings
Nov 2, 2017 · Penalty $800
Resolve - Class - 1
Sec. 3308.5 failure to install or ,aintain vertical safety netting system as required. at time of inspection of a 8 sty new bldg under construction at 4t fl level,active job site. i observed that at 4th fl leve
Aug 1, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to safegaurd all persons & property affected by construciton operations-uncapped rebars. at time of inspection of a 8 sty new bldg under construction at 4th fl level active work site. i observed various
Aug 1, 2017 · Penalty $10,000
Resolve - Class - 1
Sec. 3304.7 failrue to provide at least 1 safe means of egress from excavation. at the time of inspection,active job site w/30 workers of various trade working in excavated pit. active work site i observed that
Aug 1, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3306.9.3 excessive dust on site. noticed at time of inspection notice demolition in progress noticed excessive dust on site & as well as on the outer perimeter of the site. remedy: stop all work & provide
Aug 9, 2016 · Penalty $800
Resolve - Class - 1
Sec. 3301.1.2 no fire watch guard. noticed at time of inspection. worker on site welding steel beams no fire watch on site. remedy: stop all welding operations provide fire watch.
Aug 9, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection inprogress noticedat all exposures on exterior debri brick & concrete falling onto pedestrian way from demolition site. remedy: stop all work & safeguard publ
Aug 9, 2016 · Penalty $10,000
Resolve - Class - 1
Sec. 3301.1.2 no fdny certificate of fitness for welding. noticed at time of inspection worker on site welding beams no welders certificate on site. remedy: stop all welding operations provide welders certifica
Aug 9, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 3307.6 sidewalk shed not to code. noticed at time of inspection demolition of bldg in progress noticed at exp#1,3,4 sidewalk shed erected not to code. noticed between shed & fence no netting provided to
Aug 9, 2016
Resolve - Class - 1
Failure to carry out demolition operations as required. noticed at time of inspection demolition in progress noticed demolition not being carries out as per plans. plans show all roof material shall be lowered
Aug 9, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain housekeeping. noticed at time of inspection demo in progress noticed excessive debris on site not maintained debris piles exceed 20ft in height workers working on top of debris causing unsaf
Aug 9, 2016 · Penalty $2,400
Resolve - Class - 1
Sec 48 failure to adequately supervise work at a construction site,so as to maintain a safe construction site & ensure complaince w/approvedconstruction documents & chapter 33 safeguard during construction & de
Aug 8, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35137318p issued on 7/19/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Apr 4, 2016 · Penalty $800
Resolve - Class - 2
Pedestrian protection does not meet code specifications 3307.6.4.8.1 the underside of sidewalk shed shall be illuminated at all times.noted:at time of inspection (6:30am) there are no working lights on shed at
Feb 11, 2016
Resolve - Class - 2
3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code.noted sidewalk shed erected under job#340284007along exp1 & 4 has inoperable bulbs rendering affected area visibly da
Jan 5, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg wall noted:premises has masonry spalling in avarous locations,@ the corner of east 14 st & locust ave a section @ the pane pet land approx 3'x2'x3" of masonry fell to public walk the re
Jul 19, 2015 · Penalty $1,030
Resolve - Class - 1
Failure to comply w/the comm'nrs order contained in nov 35093526h issued on 3/22/14.failure to maintain free standing brick masonry chimney.remedy: comply w/the comm'nrs order.
May 31, 2014 · Penalty $6,000
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner.noted:at the east corner along locust ave,free standing brick masonry chimney is in severe disrepair.approx 60'high structure has loose,cracked,missing bricks
Mar 22, 2014 · Penalty $5,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35023444k issued on 6/21/13. failure to maintain smoke stack.remedy: comply w/the comm's order.
Jan 9, 2014 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35023444k issued on 6/21/13. for free standing smoke stack in disrepair. remedy: comply w/the comm's order.
Oct 11, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #35023444k issued on 6/21/13. free standing smoke stack in disrepair. remedy: comply w/the comm's order.
Aug 14, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances. noted at rear yard free standing brick smoke stack has cracked/bulging/displaced and dislodged bricks various locations throughout. make safe immediately.
Jun 21, 2013 · Penalty $2,500
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34986542j issued on failure to maintain facade. remedy: comply w/the comm's order.
Apr 12, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/comm's order to correct condition cited in nov #34986542j failure to maintain facade. remedy: comply w/order.
Feb 13, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/commissioner's order to correct condition cited innov #34986542j. failure to maintain facade rear bldg. remedy: comply w/code.
Dec 14, 2012 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg walls of appurtenances in that their is defective brick work around entire bldg. also chimney at rear of property is in disrepair, missing bricks cracks throughout chimney. remedy:
Oct 26, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to comply w/commissioner's order. failure to file c/c w/dob pursuant to 28-204.2 for violation ecb 34877067r for failure to maintain. remedy: file a c/c.
Dec 17, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to maintain brick chimney structure approx 100'0"high located @ rear yard of premises. visible multiple defects, opening and missing/fallen off brick, sporadic cracks @ various - upper & lower section
Dec 17, 2010 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Pests
Oct 20, 2026 · Apt 510C
Open - Unsanitary condition
Pests
Oct 13, 2026 · Apt 510C
Open - Unsanitary condition
Pests
Aug 26, 2026 · Apt PUBLIC
Close - General
Ventilation system
Jun 12, 2026 · Apt 508A
Close - Unsanitary condition
Mold
Jun 12, 2026 · Apt 508A
Close - Paint/plaster
Wall
Jun 12, 2026 · Apt 508A
Close - Unsanitary condition
Mold
May 8, 2026 · Apt 508A
Close - Water leak
Damp spot
May 8, 2026 · Apt 508A
Close - Unsanitary condition
Mold
Mar 23, 2026 · Apt 310B
Close - Door/window
Door
Mar 23, 2026 · Apt 310B
Close
Show 26 more ↓
- General
Ventilation system
Mar 20, 2026 · Apt 508A
Close - General
Ventilation system
Mar 20, 2026 · Apt 508A
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 27, 2026 · Apt 805B
Close - Unsanitary condition
Pests
Jan 27, 2026 · Apt 805B
Close - Unsanitary condition
Mold
Jan 27, 2026 · Apt 805B
Close - Paint/plaster
Ceiling
Dec 6, 2025 · Apt 508A
Close - General
Ventilation system
Dec 6, 2025 · Apt 508A
Close - Unsanitary condition
Mold
Nov 11, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Nov 11, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Nov 11, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Jul 8, 2025 · Apt 805B
Close - Paint/plaster
Wall
Jul 8, 2025 · Apt 805B
Close - Plumbing
Water supply
Jul 8, 2025 · Apt 805B
Close - Plumbing
Water supply
Jul 8, 2025 · Apt 805B
Close - Flooring/stairs
Floor
Jul 8, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Jun 26, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Jun 26, 2025 · Apt 805B
Close - Unsanitary condition
Pests
Jun 26, 2025 · Apt 805B
Close - Heat/hot water
Entire building
May 29, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 25, 2024 · Apt 805B
Close - Heat/hot water
Apartment only
Apr 8, 2024 · Apt 504C
Close - Heat/hot water
Apartment only
Feb 17, 2024 · Apt 314B
Close - Flooring/stairs
Floor
Oct 20, 2023 · Apt 102B
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt ENTIRE
Close - Heat/hot water
Apartment only
Jan 15, 2021 · Apt 405C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2017
- Floors
- 8
- Residential units
- 302
- Building area
- 382,162 ft²
- Lot area
- 71,875 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 44
- Block / lot
- 6735 / 80
- Assessed value
- $28,894,950
- Landmark / historic district
- No
HPD registration #389187, last renewed Jul 24, 2025.
Questions about 1263 East 14 Street
Who owns 1263 East 14 Street?
The owner of record in NYC Department of City Planning PLUTO data is Vitagraph Reit, LLC (The).
Does 1263 East 14 Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 1263 East 14 Street rent stabilized?
NYC Department of Finance tax bills listed 91 rent-stabilized units here in 2024 (about 30% of its 302 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1263 East 14 Street built?
City records list 2017 as the year it was built.
How many apartments are in 1263 East 14 Street?
It has 302 residential units and 303 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.