1599 West 10 Street
Brooklyn, NY 11204BBL 3-06597-0052Map
Owner of record: 1599 West 10th Street
1599 West 10 Street is an elevator apartment building built in 1934 in Brooklyn, 11204. It has 60 residential units across 6 floors. The owner of record is 1599 West 10th Street. HPD has recorded 169 housing violations here, most recently on June 9, 2024. City tax records listed 60 rent-stabilized apartments here in 2024.
- HPD violations
- 169
- DOB violations
- 15
- ECB violations
- 8
- HPD complaints
- 130
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 169
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story
Jun 9, 2024
Closed — Violation closed - ANon-hazardous
Replace with new the missing safety caps at electrical outlets at all walls at public hall, 1st story
Jun 9, 2024
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Apr 3, 2024 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance at public hall, 1st story
Apr 3, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinges springs] in the entrance located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 5 in the entrance located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 square feet, at grouts joints irrespective at north wall around bathtub, in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective masonry cements at grouts joints at north wall around bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2024 · Apt 5B
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing [ kickstand door stops] installed on fire doors 1st from east at south at public hall, 5th story
Mar 11, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [slanted] fire doors 1st from east at south, at public hall, 5th story
Mar 11, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at basement
Feb 14, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing permanent door stopper at building front entrance, bolt pipe
Jan 3, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door leading to compactor room at east, hinges, at basement
Jan 3, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at entrance at boiler room
Nov 28, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at entrance to bldg. , 1st story
Nov 28, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at bulkhead , 6th story, section ''south''
Nov 28, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 28, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 4h, 4th story, 1st apartment from north at east
Jan 24, 2023 · Apt 4H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at east located at apt 4h, 4th story, 1st apartment from north at east
Jan 24, 2023 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 4h, 4th story, 1st apartment from north at east
Jan 24, 2023 · Apt 4H
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 5; in the entire apartment located at apt 4h, 4th story, 1st apartment from north at east
Jan 24, 2023 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4h, 4th story, 1st apartment from north at east
Jan 24, 2023 · Apt 4H
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, west wall in the kitchen located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st window frame from north at east wall in the 4th room from east located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall in the kitchen located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from east located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from east located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, south wall in the kitchen located at apt 1j, 1st story, 1st apartment from east at south
Nov 6, 2022 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... 33 sq.ft. ceiling in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, south wall in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1g, 1st story, 2nd apartment from west at north
Nov 6, 2022 · Apt 1G
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles at public hall, 1st story
Sep 17, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to defective hinges at fire door at public hall, 5th story
Jun 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1d, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall in the kitchen located at apt 1d, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5g, 5th story, 2nd apartment from west at north
Jun 22, 2022 · Apt 5G
Closed — Violation closed
DOB building violations · 15
- Elevator elevatorrequired
Cease use of this device: according to the manufacturer, there is a possibility of main drive shaft failure and no ascending car overspeed and unintended car movement protection installed on this device.
Jan 17, 2024
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 24, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 15, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 29, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2008
Dob violation - resolved
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 13, 2006
Dob violation - resolved - Elevator elevatorrequired
3p2519
Sep 10, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p2519
Aug 10, 2000
Dob violation - resolved
ECB violations · 8
- Class - 1
Cu5a10; cu59o02; 57bb07; 67x10; 68m07. 05a10-cease use item, door zone restrictor has been disabled and rendered inoperative. this is a safety device to ensure elevator assenger ssaety. repair restrictor an
Nov 8, 2018 · Penalty $1,250
Resolve - Class - 2
56y13,42b11. 56y-seal leaks; 42b-what is the function of jumper btw terminals 4 and 4a
Feb 27, 2017
Resolve - Class - 1
05n10,42b01,67b10,73b10,74b10. 05n-repair bypassed door zone lock; 42b-properly wire controller to factory prints or state which terminals have been removed or renamed in safety string (jumper across term4-4a
Sep 14, 2016 · Penalty $1,000
Resolve - Class - 2
11b10,08v01,05r09,05l10,61g11,46q03,56y13,40m07,40m07,40h11,16t07,16t07,16e01,10j01. 11b-door does not open completely. when door open button pressed; 08v-where needed; 05r-vision panel grill on wrong side; 05
Jan 19, 2016
Resolve - Class - 2
32h10 32h10 repair worn guide shoes
Aug 11, 2008
Resolve - Non-hazardous
55y13,55o02, 38o02, 66o02, 31h10, 03d06, 84m07, 10d06, 51m07, 53m07. 55. oil leak main machine 55. clean main machine 38.clean car top(oil)66. clean pit 31. car shoes worn 03. handrail loose 84.car fan missing
Oct 5, 2007
Resolve - Non-hazardous
39h 50y 73o
Jun 24, 1999 · Penalty $350
Resolve - Non-hazardous
08v17q37b74m 17,q,03; install guard, basement vision panel. 37,b, make all relays operational. 74,m, provide capacity plate in car.
Nov 25, 1997
Resolve
Complaints
- Heat/hot water
Entire building
Apr 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 8, 2025 · Apt 5J
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt BLDG
Close - Door/window
Door
Jan 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 18, 2024 · Apt 2E
Close - Heat/hot water
Entire building
Mar 9, 2024 · Apt BLDG
Close - Elevator
Maintenance
Jan 24, 2024 · Apt ELEVAT
Close - Safety
Window guard broken/missing
Jan 24, 2024 · Apt BLDG
Close
Show 40 more ↓
- Door/window
Door
Sep 18, 2023 · Apt 2E
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Door/window
Door
Feb 22, 2022 · Apt 2E
Close - Unsanitary condition
Pests
May 12, 2021 · Apt 5F
Close - Appliance
Refrigerator
May 5, 2020 · Apt 5C
Close - Appliance
Refrigerator
May 5, 2020 · Apt 5C
Close - Heat/hot water
Apartment only
Mar 23, 2020 · Apt 6H
Close - Heat/hot water
Entire building
Jan 20, 2020 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 5, 2019 · Apt 2E
Close - Heat/hot water
Entire building
Oct 29, 2019 · Apt 1E
Close - Heat/hot water
Apartment only
Oct 23, 2019 · Apt 4G
Close - Heat/hot water
Entire building
Oct 16, 2019 · Apt 6E
Close - Heat/hot water
Entire building
May 12, 2019 · Apt 2A
Close - Heat/hot water
Entire building
May 3, 2019 · Apt 6G
Close - Heat/hot water
Entire building
Mar 24, 2019 · Apt 3G
Close - Heat/hot water
Apartment only
Feb 24, 2019 · Apt 2E
Close - Heat/hot water
Apartment only
Feb 23, 2019 · Apt 2E
Close - Heat/hot water
Apartment only
Feb 22, 2019 · Apt 2E
Close - Heat/hot water
Entire building
Jan 1, 2019 · Apt 3E
Close - Heat/hot water
Entire building
Nov 26, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 26, 2018 · Apt D1
Close - Heat/hot water
Apartment only
Nov 22, 2018 · Apt 2E
Close - Heat/hot water
Entire building
Oct 14, 2018 · Apt 1E
Close - Unsanitary condition
Pests
May 20, 2018 · Apt 5K
Close - Paint/plaster
Ceiling
May 20, 2018 · Apt 5K
Close - Unsanitary condition
Mold
May 20, 2018 · Apt 5K
Close - Water leak
Heavy flow
May 20, 2018 · Apt 5K
Close - Heat/hot water
Apartment only
May 2, 2018 · Apt 2E
Close - Heat/hot water
Apartment only
Mar 27, 2018 · Apt 2E
Close - Unsanitary condition
Pests
Feb 20, 2018 · Apt 5K
Close - Unsanitary condition
Pests
Feb 20, 2018 · Apt K5
Close - Plumbing
Basin/sink
Feb 20, 2018 · Apt K5
Close - Unsanitary condition
Mold
Feb 20, 2018 · Apt K5
Close - Unsanitary condition
Mold
Feb 20, 2018 · Apt K5
Close - Water leak
Heavy flow
Feb 20, 2018 · Apt K5
Close - Heat/hot water
Entire building
Dec 20, 2017 · Apt 2E
Close - Heat/hot water
Apartment only
Dec 20, 2017 · Apt 2E
Close - Unsanitary condition
Pests
Aug 8, 2017 · Apt 6H
Close - Flooring/stairs
Floor
Aug 8, 2017 · Apt 6H
Close - Flooring/stairs
Floor
Aug 8, 2017 · Apt 6H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1934
- Floors
- 6
- Residential units
- 60
- Building area
- 62,160 ft²
- Lot area
- 15,800 ft²
- Zoning
- R4-1
- Community board
- 311
- Council district
- 43
- Block / lot
- 6597 / 52
- Assessed value
- $2,079,900
- Landmark / historic district
- No
HPD registration #304336, last renewed Sep 23, 2025.
Questions about 1599 West 10 Street
Who owns 1599 West 10 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1599 West 10th Street.
Does 1599 West 10 Street have violations?
Yes. NYC HPD has recorded 169 housing violations at this property.
Is 1599 West 10 Street rent stabilized?
NYC Department of Finance tax bills listed 60 rent-stabilized units here in 2024 (about 100% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1599 West 10 Street built?
City records list 1934 as the year it was built.
How many apartments are in 1599 West 10 Street?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.