2263 64 Street
Brooklyn, NY 11204BBL 3-06552-0049Map
Owner of record: 2263 Realty LLC
2263 64 Street is a walk-up apartment building built in 1926 in Brooklyn, 11204. It has 30 residential units across 4 floors. The owner of record is 2263 Realty LLC. HPD has recorded 200 housing violations here, most recently on October 17, 2026. 23 of the 50 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 200
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 131
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 200
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall, 2nd window frame from west at north wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, south wall, east wall, 1st window frame from west at north wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from east at north, the 2nd room from east, the private hallway located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door frame, 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, baseboard at south wall in the foyer located at apt 5c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, ceiling, east wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall, baseboard at north wall, 1st closet from west at north wall door frame, ceiling in the foyer located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st door frame from east at south wall, ceiling in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the foyer located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Violation will be reinspected - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Violation will be reinspected - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at south wall in the 1st room from east at north located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Violation will be reinspected - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at the south wall in the kitchen located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the 2nd room from east at north, the 2nd room from east at south located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 3rd story, 1st apartment from north at east , section at north
Sep 10, 2026 · Apt 5C
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at washbasin hot water in the bathroom located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lock at door leading to window with fire escape in the 2nd room from north located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt b7, 2nd story, 2nd apartment from east at south
Mar 15, 2026 · Apt B7
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north at west located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at west located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balances at upper window sash at south wall in the 2nd room from north at west located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective connection wasteline at wash basin in the bathroom located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balances at upper window sash in the kitchen located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 1st room from north at east located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling and north wall in the 1st room from north at east located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt d7, 4th story, 2nd apartment from east at south , section ''east''
Feb 9, 2026 · Apt D7
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 9, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 1, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 1, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor, approximately 10 square feet at west in the 1st room from east at south located at apt a1, 1st story, 1st apartment from south at west
Feb 15, 2023 · Apt A1
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt a1, 1st story, 1st apartment from south at west
Feb 15, 2023 · Apt A1
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a1, 1st story, 1st apartment from south at west
Feb 15, 2023 · Apt A1
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing refrigerator door intact, section north at public hall, 3rd story
Jan 3, 2023
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt d4, 4th story, 1st apartment from south at west
Sep 21, 2022 · Apt D4
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
ECB violations · 2
- Class - 2
Failure to maintain building in code compliant manner:noted:at time ofinspection it was observed that there were multiple areas around structure where there were missing sections of stucco at rear of bldg. all
Nov 27, 2020
Resolve - Class - 2
15,50,50a,50b,50c. 50-oil/gas burner making heavy noise in high fire;50a-cold water pipe sweating in boiler room; 5b-steam pipe leaking above door in boiler room; 50c-oil tank sign missing.
Dec 20, 2016
Resolve
Complaints
- Water leak
Heavy flow
Aug 20, 2026 · Apt 5C
Close - Plumbing
Basin/sink
Aug 20, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 5C
Close - Plumbing
Basin/sink
Aug 20, 2026 · Apt 5C
Close - Unsanitary condition
Garbage/recycling storage
May 30, 2026 · Apt BLDG
Close - Water leak
Slow leak
May 23, 2026 · Apt 3B
Close - Paint/plaster
Wall
Mar 13, 2026 · Apt B7
Close - Paint/plaster
Ceiling
Mar 13, 2026 · Apt B7
Close - Paint/plaster
Ceiling
Mar 13, 2026 · Apt B7
Close - Water leak
Heavy flow
Mar 13, 2026 · Apt B7
Close
Show 40 more ↓
- Water leak
Heavy flow
Feb 5, 2026 · Apt D7
Close - Flooring/stairs
Floor
Feb 5, 2026 · Apt D7
Close - Paint/plaster
Ceiling
Feb 5, 2026 · Apt D7
Close - Door/window
Window frame
Feb 5, 2026 · Apt D7
Close - Water leak
Heavy flow
Jan 31, 2026 · Apt B7
Close - Water leak
Heavy flow
Jan 31, 2026 · Apt B7
Close - Heat/hot water
Entire building
Oct 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt A3
Close - Heat/hot water
Entire building
Jan 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt C1
Close - Heat/hot water
Apartment only
Nov 29, 2023 · Apt C1
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt C1
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt BLDG
Close - General
Bell/buzzer/intercom
Aug 17, 2022 · Apt D4
Close - Appliance
Refrigerator
Aug 17, 2022 · Apt D4
Close - Door/window
Door
Aug 17, 2022 · Apt D4
Close - Appliance
Electric/gas range
Aug 17, 2022 · Apt D4
Close - Electric
Power outage
Aug 17, 2022 · Apt D4
Close - Safety
Carbon monoxide detector
May 14, 2022 · Apt C4
Close - Flooring/stairs
Floor
May 14, 2022 · Apt C4
Close - Door/window
Window frame
May 14, 2022 · Apt C4
Close - Paint/plaster
Wall
May 14, 2022 · Apt C4
Close - Paint/plaster
Ceiling
May 14, 2022 · Apt C4
Close - Electric
No lighting
May 14, 2022 · Apt C4
Close - General
Cooking gas
Apr 29, 2022 · Apt C4
Close - Electric
Power outage
Apr 29, 2022 · Apt C4
Close - Paint/plaster
Wall
Apr 29, 2022 · Apt C4
Close - Paint/plaster
Ceiling
Apr 29, 2022 · Apt C4
Close - Paint/plaster
Ceiling
Apr 29, 2022 · Apt C4
Close - Door/window
Window pane
Apr 29, 2022 · Apt C4
Close - Electric
Power outage
Apr 26, 2022 · Apt B4
Close - Water leak
Slow leak
Apr 26, 2022 · Apt B4
Close - Door/window
Door
Apr 26, 2022 · Apt B4
Close - Flooring/stairs
Floor
Apr 24, 2022 · Apt D4
Close - Paint/plaster
Ceiling
Apr 24, 2022 · Apt D4
Close - Door/window
Window frame
Apr 24, 2022 · Apt D4
Close - Heat/hot water
Apartment only
Apr 24, 2022 · Apt D4
Close - Paint/plaster
Ceiling
Apr 24, 2022 · Apt D4
Close - Appliance
Electric/gas range
Apr 24, 2022 · Apt D4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 4
- Residential units
- 30
- Building area
- 22,800 ft²
- Lot area
- 8,000 ft²
- Zoning
- R4-1
- Community board
- 311
- Council district
- 43
- Block / lot
- 6552 / 49
- Assessed value
- $737,100
- Landmark / historic district
- No
HPD registration #304099, last renewed Jul 15, 2026.
Questions about 2263 64 Street
Who owns 2263 64 Street?
The owner of record in NYC Department of City Planning PLUTO data is 2263 Realty LLC.
Does 2263 64 Street have violations?
Yes. NYC HPD has recorded 200 housing violations at this property.
Is 2263 64 Street rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2263 64 Street built?
City records list 1926 as the year it was built.
How many apartments are in 2263 64 Street?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.