800 Avenue H
Brooklyn, NY 11230BBL 3-06511-0001Map
Owner of record: 800 Midwood LLC
800 Avenue H is an elevator apartment building built in 1938 in Brooklyn, 11230. It has 67 residential units across 6 floors. The owner of record is 800 Midwood LLC. HPD has recorded 157 housing violations here, most recently on May 1, 2026. 11 of the 50 most recent violations are still open. City tax records listed 67 rent-stabilized apartments here in 2024.
- HPD violations
- 157
- DOB violations
- 23
- ECB violations
- 14
- HPD complaints
- 209
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 157
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north at east located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, west wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Certification postponment granted - BHazardous
Properly repair or replace the broken or defective door lock in the entrance located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective rotten wood floor in the 2nd room from north located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. south wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from north located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north at west located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1d, 1st story, 1st apartment from south at west , section at west
Apr 1, 2025 · Apt 1D
Open — Certification postponment granted - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1d, 1st story, 1st apartment from south at west , section at west
Mar 26, 2025 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section at west
Mar 26, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west , section at west
Mar 26, 2025 · Apt 1D
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1d, 1st story, 1st apartment from south at west , section at west
Mar 26, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective wood floor in the 1st room from north at west located at apt 1d, 1st story, 1st apartment from south at west
Mar 26, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood tiles at floor in the 1st room from north at west located at apt 1d, 1st story, 1st apartment from south at west
Mar 26, 2025 · Apt 1D
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of lockable knob at door preventing entrance to fire escape window in the 1st room from north at west located at apt 1d, 1st story, 1st apartment from south at west , section ''west''
Feb 4, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood at floor in the 2nd room from north at west located at apt 1d, 1st story, 1st apartment from south at west , section ''west''
Feb 4, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator in the kitchen located at apt 1d, 1st story, 1st apartment from south at west , section ''west''
Feb 4, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood base cabinet at south in the kitchen located at apt 1d, 1st story, 1st apartment from south at west , section ''west''
Feb 4, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6k, 6th story, 1st apartment from east at south
Dec 13, 2024 · Apt 6K
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste pipe at bathtub in the bathroom located at apt 3j, 3rd story, 2nd apartment from north at east
Sep 26, 2024 · Apt 3J
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3j, 3rd story, 2nd apartment from north at east
Sep 26, 2024 · Apt 3J
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 2nd story, section at west
Jul 24, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at public hall, 1st story
Jul 24, 2024
Closed — Violation closed - BHazardous
Refit fire door at public hall, 6th story, section at west
Jul 24, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 5j, 5th story, 2nd apartment from north at east , section at east
Jul 24, 2024 · Apt 5J
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. at public hall, 3rd story
May 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. at public hall, 5th story
May 15, 2024
Closed — Violation closed - BHazardous
Refit fire door. at public hall, 3rd story
May 15, 2024
Closed — Violation closed - BHazardous
Refit fire door. at public hall, 5th story
May 15, 2024
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . at 2nd public hall bulkhead from east, 6th story
May 15, 2024
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . at 1st public hall bulkhead from east, 6th story
May 15, 2024
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
May 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the fire door at public hall, 5th story
Jan 15, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door in the private hallway located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from west at north wall door, 2nd closet from west at north wall door frame, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 2nd window frame from west at north wall in the 4th room from east located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall in the 4th room from east located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st radiator from west at north wall, 1st window frame from west at north wall in the kitchen located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, east wall, 1st window frame from west at north wall in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd radiator from west at north wall in the 1st room from east located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from east located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 4th story
Dec 24, 2023
Closed — Violation closed - BHazardous
Properly secure the loose wash basin at east wall in the bathroom located at apt 4g, 4th story, 1st apartment from west at north
Dec 24, 2023 · Apt 4G
Closed — Violation dismissed
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed
Show 13 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 5, 2003
Dob violation - resolved - Elevator elevatorrequired
3p2830
Aug 3, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 14
- Class - 2
Provide keys to access basement., provide keys to access pit., provide motor room door sign., reinstall hand rail on motor room stairs., provide up to date elevator maintenance log book with out future months m
Mar 18, 2024
Resolve - Class - 1
No dlm tag on the controller. electrical brake monitoring disabled taken apart hazardous condition.
Nov 30, 2020
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurteannces required by 28-302.4 for control #812525.submit acceptable required tech
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 2
Notification prior to commencement at work. note: suspended scaffold w/outrigger beams had been erected at exp #1,2,4. respondent failed tonotify dept prior to use outrigger beams in connection w/suspended
Jan 3, 2014 · Penalty $800
Resolve - Class - 1
Failed to file evidence of compliance w/disability benefits law. note disability insurance policy #dbl 55679 has been expired at 12.31.13. remedy: stop using suspended scaffold obtain disability insurance.
Jan 3, 2014 · Penalty $1,250
Resolve - Class - 1
Sec. 3314.6.3 lifelines and suspension ropes shall each be attached toa different point anchorage. note:suspended scaffold w/outrigger beamshad been erected @ exp #1,2,4. lifelines & tiebacks had been attached
Jan 3, 2014 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.15.2 hangers or stirrups. the hanger or stirrups shall be placed at least 6" but not more than 18" from the end of the platform. note: suspended scaffoldd w/outrigger beams had been erected at exps
Jan 3, 2014 · Penalty $1,600
Resolve - Class - 2
20b11,03e10,56f10,61t07. 20b- plastic. 03e- between 4 and 5 floors in both directors. 61t-elev co info.
Jun 22, 2011
Resolve - Class - 3
56y10,56y02,59y02,61r10,16a13. 61r- can be locked. 16a- hoist side door pull bsmt
Nov 17, 2010
Resolve - Class - 2
35r11.42a1.77q3.35r illegal wiring to fan in m/r 40r smoke hole grate and doo r41i unlockable 42a car door timimg 52b anti spin-outs to code77q under car light
Aug 7, 2009 · Penalty $2,500
Resolve
Show 4 more ↓
- Class - 3
15m07.98bb05.77o02.66o02.
Sep 5, 2008
Resolve - Non-hazardous
52i11,32a09,69i11,60t07,84e10.52i-( )in gov rope visible on govw/car at 6fl.32a-remove material from top of.69i-car buffer spring repair or replace.60t-provide elec co emergency phone #.84e-occasional no
May 22, 2007 · Penalty $180
Resolve - Hazardous
83x10.83x10-section 11-02 only elevator in bldg out of service.restoreto service.
May 2, 2007 · Penalty $350
Resolve - Non-hazardous
40b7,74l11. 40-provide electric disconnect for up direction on governor. 74-phase ii not returining to lobby when normal is turned on.
Dec 23, 1997 · Penalty $350
Resolve
Complaints
- Plumbing
Basin/sink
Apr 7, 2026 · Apt 5J
Close - Heat/hot water
Apartment only
Apr 6, 2026 · Apt 6H
Close - Heat/hot water
Entire building
Apr 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 6, 2026 · Apt 6H
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt 5A
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Nov 6, 2025 · Apt 1D
Close - Electric
Outlet/switch
Nov 6, 2025 · Apt 1D
Close - Paint/plaster
Wall
Nov 6, 2025 · Apt 1D
Close
Show 40 more ↓
- Flooring/stairs
Floor
Nov 6, 2025 · Apt 1D
Close - Water leak
Slow leak
Nov 6, 2025 · Apt 1D
Close - Door/window
Door
Nov 6, 2025 · Apt 1D
Close - Paint/plaster
Wall
Sep 23, 2025 · Apt 4K
Close - General
Janitor/super
Sep 17, 2025 · Apt 5A
Close - General
Janitor/super
Aug 30, 2025 · Apt 6J
Close - Heat/hot water
Apartment only
Apr 7, 2025 · Apt 6H
Close - Paint/plaster
Window/frame
Apr 4, 2025 · Apt 1D
Close - Paint/plaster
Door/frame
Apr 4, 2025 · Apt 1D
Close - Paint/plaster
Radiator
Apr 4, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Mar 26, 2025 · Apt 5A
Close - Flooring/stairs
Floor
Mar 25, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Mar 25, 2025 · Apt 1D
Close - Door/window
Door frame
Mar 25, 2025 · Apt 1D
Close - Appliance
Refrigerator
Mar 25, 2025 · Apt 1D
Close - Door/window
Door
Mar 25, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Mar 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Mar 16, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 1, 2025 · Apt 4C
Close - Plumbing
Basin/sink
Jan 31, 2025 · Apt 1D
Close - General
Cabinet
Jan 31, 2025 · Apt 1D
Close - Paint/plaster
Wall
Jan 31, 2025 · Apt 1D
Close - Appliance
Refrigerator
Jan 31, 2025 · Apt 1D
Close - Door/window
Door frame
Jan 31, 2025 · Apt 1D
Close - Flooring/stairs
Floor
Jan 31, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Jan 21, 2025 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Dec 30, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 30, 2024 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 17, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 11, 2024 · Apt 5C
Close - Heat/hot water
Entire building
Nov 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2024 · Apt 6H
Close - Plumbing
Bathtub/shower
Sep 6, 2024 · Apt 3J
Close - Appliance
Refrigerator
Sep 6, 2024 · Apt 3J
Close - Door/window
Window frame
Aug 27, 2024 · Apt 4C
Close - Water leak
Slow leak
Mar 26, 2024 · Apt 3J
Close - General
Janitor/super
Mar 21, 2024 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1938
- Floors
- 6
- Residential units
- 67
- Building area
- 74,600 ft²
- Lot area
- 20,000 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 45
- Block / lot
- 6511 / 1
- Assessed value
- $1,996,650
- Landmark / historic district
- No
HPD registration #305324, last renewed Jul 23, 2026.
Questions about 800 Avenue H
Who owns 800 Avenue H?
The owner of record in NYC Department of City Planning PLUTO data is 800 Midwood LLC.
Does 800 Avenue H have violations?
Yes. NYC HPD has recorded 157 housing violations at this property.
Is 800 Avenue H rent stabilized?
NYC Department of Finance tax bills listed 67 rent-stabilized units here in 2024 (about 100% of its 67 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 800 Avenue H built?
City records list 1938 as the year it was built.
How many apartments are in 800 Avenue H?
It has 67 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.