773 East 9 Street
Brooklyn, NY 11230BBL 3-06497-0058Map
Owner of record: 773 East 9th LLC
773 East 9 Street is a walk-up apartment building built in 1925 in Brooklyn, 11230. It has 6 residential units across 3 floors. The owner of record is 773 East 9th LLC. HPD has recorded 81 housing violations here, most recently on May 4, 2026. 1 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 81
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 105
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 81
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise latch set in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Nov 20, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Nov 20, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Nov 20, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective floor ceramic tiles in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective floor ceramic tiles in the foyer located at apt 1r, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective locking assembly (mortise lock) in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Nov 11, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule , 1st story
Oct 20, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures at kitchen and bathroom in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1R
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective mortise latch-set at door in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Oct 20, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum tempeture of 130 degrees at all water fixture in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
May 2, 2025 · Apt 1R
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Apr 23, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 23, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Nov 29, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Nov 6, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin waterbugs in the entire apartment located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash window at 1st from north at east in the 1st room from east at south located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at washbasin and bathtub in the bathroom located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 4th room from east located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt2r, 2nd story, 1st apartment from north at east
Feb 29, 2024 · Apt APT2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door west wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at south at public hall, 1st story
Oct 18, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, north wall, east wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective cracked and settled marble tread , indtermediate landing 1st from top at public hall stairs, 1st story
Oct 18, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light switch at north wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st door frame from east at south wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Replace the broken or defective cracked wash basin, at east wall, in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at west wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked masonry sills at window openings , 2nd and 3rd story , building front
Oct 18, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective all steel lintels wiith missing and deteriorated mortar at joints to windows' openings, 3rd story, building front
Oct 18, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective ceramic floor tiles at building's vestibule, at public hall, 1st story
Oct 18, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, west wall, 1st door frame from east at south wall, 1st closet from north at east wall door frame, baseboard at north wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, south wall, east wall, west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at west wall, 1st door frame from south at west wall, 1st door frame from east at south wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Oct 18, 2023 · Apt 2R
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jul 18, 2023 · Apt 2R
Closed — Violation closed
DOB building violations · 1
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to maintain bldg. & all parts thereof in a code-compliant manner. observed exp #1&4 curb cut approx. 5' wide illegal created to access an illegal parking pad, cc maintained w/out dob approval contrary t
Mar 31, 2026 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Mar 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 1R
Close - Door/window
Door
Nov 10, 2025 · Apt 1R
Close - Heat/hot water
Apartment only
Oct 19, 2025 · Apt 1R
Close - Door/window
Door
Dec 24, 2024 · Apt 2R
Close - Door/window
Door
Dec 23, 2024 · Apt 2R
Close - Water leak
Heavy flow
Dec 20, 2024 · Apt 2R
Close - Plumbing
Water supply
Nov 28, 2024 · Apt BLDG
Close - Appliance
Refrigerator
Nov 23, 2024 · Apt 1R
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 4, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Apr 10, 2024 · Apt 2R
Close - Door/window
Door frame
Apr 10, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Apr 10, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 4, 2024 · Apt 2R
Close - Door/window
Window frame
Apr 4, 2024 · Apt 2R
Close - Paint/plaster
Wall
Apr 4, 2024 · Apt 2R
Close - Unsanitary condition
Mold
Apr 4, 2024 · Apt 2R
Close - Heat/hot water
Apartment only
Feb 28, 2024 · Apt APT2R
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt APT2R
Close - Unsanitary condition
Mold
Feb 28, 2024 · Apt APT2R
Close - Door/window
Door
Feb 28, 2024 · Apt APT2R
Close - Plumbing
Basin/sink
Feb 28, 2024 · Apt APT2R
Close - Electric
No lighting
Feb 28, 2024 · Apt APT2R
Close - Paint/plaster
Wall
Feb 28, 2024 · Apt APT2R
Close - Paint/plaster
Radiator
Feb 28, 2024 · Apt APT2R
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt APT2R
Close - Paint/plaster
Wall
Oct 10, 2023 · Apt 2R
Close - Paint/plaster
Wall
Oct 10, 2023 · Apt 2R
Close - Electric
Lighting
Oct 10, 2023 · Apt 2R
Close - Unsanitary condition
Mold
Oct 10, 2023 · Apt 2R
Close - Electric
Lighting
Aug 21, 2023 · Apt 1R
Close - Water leak
Heavy flow
Aug 11, 2023 · Apt 1R
Close - Water leak
Heavy flow
Aug 3, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Jun 11, 2023 · Apt 2R
Close - Electric
Lighting
Jun 11, 2023 · Apt 2R
Close - Electric
Lighting
Apr 10, 2023 · Apt 2R
Close - Electric
No lighting
Apr 10, 2023 · Apt 2R
Close - Plumbing
Toilet
Feb 23, 2023 · Apt 2R
Close - Plumbing
Toilet
Feb 23, 2023 · Apt 2R
Close - Plumbing
Toilet
Jan 27, 2023 · Apt 2R
Close - Door/window
Door
Jan 27, 2023 · Apt 2R
Close - Paint/plaster
Wall
Jan 27, 2023 · Apt 2R
Close - Plumbing
Bathtub/shower
Jan 27, 2023 · Apt 2R
Close - Electric
Lighting
Jan 27, 2023 · Apt 2R
Close - Electric
Outlet/switch
Jan 27, 2023 · Apt 2R
Close - Door/window
Window frame
Jan 27, 2023 · Apt 2R
Close - Plumbing
Bathtub/shower
Jan 27, 2023 · Apt 2R
Close - Paint/plaster
Wall
Jan 19, 2023 · Apt 2R
Close - Plumbing
Bathtub/shower
Jan 19, 2023 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1925
- Floors
- 3
- Residential units
- 6
- Building area
- 5,000 ft²
- Lot area
- 2,680 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 45
- Block / lot
- 6497 / 58
- Assessed value
- $435,150
- Landmark / historic district
- No
HPD registration #328540, last renewed Jul 9, 2026.
Questions about 773 East 9 Street
Who owns 773 East 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is 773 East 9th LLC.
Does 773 East 9 Street have violations?
Yes. NYC HPD has recorded 81 housing violations at this property.
Is 773 East 9 Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 33% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 773 East 9 Street built?
City records list 1925 as the year it was built.
How many apartments are in 773 East 9 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.