9224 3 Avenue
Brooklyn, NY 11209BBL 3-06102-0047Map
Owner of record: Coco Realty LLC
9224 3 Avenue is a walk-up apartment building built in 1927 in Brooklyn, 11209. It has 14 residential units across 4 floors. The owner of record is Coco Realty LLC. HPD has recorded 121 housing violations here, most recently on April 30, 2026. 49 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 121
- DOB violations
- 18
- ECB violations
- 9
- HPD complaints
- 226
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 121
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash glass pane at west in the kitchen located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Nov sent out - BHazardous
Refit upper and lower window sash at south in the 2nd room from north located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash broken glass pane in the 2nd room from north located at apt a2, 1st story, 2nd apartment from south at west
Apr 18, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the foyer located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Dec 25, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at waste line at bathtub in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at waste line at washbasin in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at north in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer from building entrance to apartment at west in the private hallway located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from north located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Dec 25, 2025
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Dec 25, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at all walls and ceiling in the bathroom located at apt d3, 4th story, 2nd apartment from south at west
Dec 25, 2025 · Apt D3
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Open — Info nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt d1, 4th story, 1st apartment from north at east original violation 18168217 issued 18-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 18, 2025 · Apt D1
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt d1, 4th story, 1st apartment from north at east
Aug 18, 2025 · Apt D1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the kitchen located at apt d1, 4th story, 1st apartment from north at east
Aug 18, 2025 · Apt D1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d1, 4th story, 1st apartment from north at east
Aug 18, 2025 · Apt D1
Open — Notice of issuance sent to tenant - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt d1, 4th story, 1st apartment from north at east
Aug 18, 2025 · Apt D1
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 6, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at west yard
Aug 6, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at west yard
Aug 5, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 5, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard
Aug 4, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 4, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Aug 4, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt b3, 2nd story, 2nd apartment from south at west
Aug 4, 2025 · Apt B3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room was locked. at cellar at boiler room
Aug 4, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Aug 4, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt b3, 2nd story, 2nd apartment from south at west
Aug 4, 2025 · Apt B3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b3, 2nd story, 2nd apartment from south at west
Aug 4, 2025 · Apt B3
Open — Notice of issuance sent to tenant - BHazardous
Remove all encumbrances consisting of household item at public hall, 4th story
Jun 28, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt d1, 4th story, 2nd apartment from north at east
Jun 28, 2025 · Apt D1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt d1, 4th story, 2nd apartment from north at east
Jun 28, 2025 · Apt D1
Open — Nov sent out
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Construction other optional
Failure to maintain blg in code complaint manner/repair and or replace
Mar 5, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Construction other optional
C-construction other optional
Nov 1, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
Work without permits. replacing steel lintels at 4th floor windows at front of building along with new brick work remedy: stop all work! obtain approvals & permits before continuing any further work
Feb 9, 1999
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Construction other optional
C-construction other optional
Jan 9, 1990
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000071214y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025 · Penalty $655
Active - Non-hazardous
Work w/o a permit. concrete parking pad & curb cur has been created o n left side yard. no parking sign posted on the front wall. remedy: obtain a permit or restore to prior legal condition.
Apr 2, 2007
Resolve - Non-hazardous
Failure to maintain adequate housekeeping note. at side of building adjacent to 269 93rd street huge pile of combustible and noncombustible construction debris such as pieces of pipes, plaster. sheetrock, wood
Mar 29, 2006
Resolve - Non-hazardous
Work w/o a permit. note at side of bldg adjacent to 269 93rd st. an illegal curb cut approx. 10' wide and parking pad approx. 8' wide x 20' long created. also observed curb cut is paint in yellow. remedy: obtai
Mar 29, 2006
Resolve - Hazardous
Failure to have approved pa plans available for inspection. remedy: provide approved pa plans. no certificate of fireproof for drapes and curtains. remedy: provide certificate.
Mar 2, 2003 · Penalty $50
Active - Non-hazardous
Work without a permit. replacing steel lintels at fourth floor windowsat front of buildingg along with new brick work. stop all work. obtainapprovals and permits before containing any further work.
Feb 9, 1999 · Penalty $250
Active - Non-hazardous
Failure to maintain exterior building walls cracked, loose open mentarof brick joints at fourth floor roof area south and east side along with vertical cracks above fourth fl. to roof area east side, remedy:
Dec 8, 1998 · Penalty $350
Active - Non-hazardous
Work without permit electrical work done without permit. more than 30 recessed lighting fixtures installed in suspended ceiling. remedy:stopall work obtain permit.
Aug 30, 1993
Resolve - Non-hazardous
Work without permit-suspended ceiling installed 1st floor 25'x50'. remedy:stop all work obtain permit.
Aug 30, 1993
Resolve
Complaints
- Heat/hot water
Entire building
Apr 16, 2026 · Apt B4
Close - Heat/hot water
Apartment only
Apr 15, 2026 · Apt D3
Close - Heat/hot water
Apartment only
Apr 15, 2026 · Apt D3
Close - Door/window
Window frame
Apr 15, 2026 · Apt A2
Close - Door/window
Window frame
Apr 15, 2026 · Apt A2
Close - Door/window
Window pane
Apr 15, 2026 · Apt A2
Close - Heat/hot water
Entire building
Apr 15, 2026 · Apt BLDG
Close - Door/window
Door
Feb 6, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Feb 6, 2026 · Apt BLDG
Close - Safety
Fire escape
Feb 6, 2026 · Apt BLDG
Close
Show 40 more ↓
- Outside building
Roof door/hatch
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 23, 2025 · Apt D3
Close - Unsanitary condition
Garbage/recycling storage
Dec 19, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt D3
Close - Water leak
Damp spot
Aug 15, 2025 · Apt D1
Close - Unsanitary condition
Mold
Aug 15, 2025 · Apt D1
Close - Unsanitary condition
Pests
Aug 15, 2025 · Apt D1
Close - Paint/plaster
Ceiling
Aug 15, 2025 · Apt D1
Close - Unsanitary condition
Pests
Aug 15, 2025 · Apt D1
Close - Heat/hot water
Entire building
Aug 4, 2025 · Apt B3
Close - Unsanitary condition
Mold
Aug 4, 2025 · Apt D1
Close - Unsanitary condition
Pests
Aug 4, 2025 · Apt D1
Close - Unsanitary condition
Pests
Aug 4, 2025 · Apt D1
Close - Heat/hot water
Entire building
Aug 4, 2025 · Apt D1
Close - Paint/plaster
Ceiling
Aug 4, 2025 · Apt D1
Close - Unsanitary condition
Pests
Jun 28, 2025 · Apt D1
Close - Paint/plaster
Ceiling
Jun 28, 2025 · Apt D1
Close - Water leak
Damp spot
Jun 28, 2025 · Apt D1
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Door/window
Window frame
Aug 21, 2024 · Apt A2
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt A2
Close - Appliance
Electric/gas range
Aug 21, 2024 · Apt A2
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt A2
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt A2
Close - Electric
Outlet/switch
Aug 21, 2024 · Apt A2
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt A2
Close - Unsanitary condition
Pests
Aug 21, 2024 · Apt A2
Close - Heat/hot water
Entire building
Jun 29, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 3, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Jan 3, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Jan 3, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 22, 2023 · Apt A2
Close - Door/window
Door
Sep 1, 2023 · Apt B3
Close - Unsanitary condition
Garbage/recycling storage
Sep 1, 2023 · Apt B3
Close - Plumbing
Bathtub/shower
Jul 3, 2023 · Apt C3
Close - Electric
Lighting
Jul 3, 2023 · Apt C3
Close - Water leak
Heavy flow
Jun 14, 2023 · Apt 3C
Close - Electric
No lighting
Jun 14, 2023 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 4
- Residential units
- 14
- Building area
- 8,100 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 47
- Block / lot
- 6102 / 47
- Assessed value
- $693,900
- Landmark / historic district
- No
HPD registration #341174, last renewed Mar 31, 2020.
Questions about 9224 3 Avenue
Who owns 9224 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Coco Realty LLC.
Does 9224 3 Avenue have violations?
Yes. NYC HPD has recorded 121 housing violations at this property.
Is 9224 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 50% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 9224 3 Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 9224 3 Avenue?
It has 14 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.