6820 Ridge Boulevard
Brooklyn, NY 11220BBL 3-05861-0053Map
Owner of record: Ardot Realty LLC
6820 Ridge Boulevard is a walk-up apartment building built in 1916 in Brooklyn, 11220. It has 24 residential units across 4 floors. The owner of record is Ardot Realty LLC. HPD has recorded 95 housing violations here, most recently on August 30, 2026. 6 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 95
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 135
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 95
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house hold items at 2nd stack from south at west at building front at fire escape, 4th story
Aug 30, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Jun 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance
May 20, 2025
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, west and south walls in the bathroom located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the bathroom located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at south located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west & south walls in the 3rd room from east at south located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser in the 3rd room from east at south located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from east at north, 4th story
Apr 24, 2025
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1d, 1st story, 2nd apartment from south at west
Apr 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Refit vestibule door at public hall, 1st story
Apr 24, 2025
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 24, 2025
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from east at south, 2nd story
Apr 24, 2025
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from east at north, 3rd story
Apr 24, 2025
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Nov 1, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Nov 1, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 1, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household articles at 4th story balcony at 2nd stack from north at east at building front at fire escape
Nov 1, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd story balcony at 2nd stack from north at east at building front at fire escape
Nov 1, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 4th story balcony at 1st stack from north at east at building front at fire escape
Nov 1, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 1st stack from north at east at building front at fire escape
Nov 1, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 2nd stack from north at east at building front at fire escape
Nov 1, 2022
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all stories balconies stacks at the front of the building at fire escape
Oct 14, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 31, 2022 · Apt 3D
Closed — Violation dismissed - BHazardous
Properly secure the loose base cabinet at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 31, 2022 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall behind base cabinet at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 31, 2022 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 31, 2022 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 31, 2022 · Apt 3D
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes balcony ...flower pots at front of bldg at fire escape, 4th story
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 18, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of baby carriages & bicycles at public hall, 1st story
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Nov 18, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at second balcony building front at fire escape
Jul 21, 2021
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors .... in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 21, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator at north wall in the 4th room from east located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 21, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator at north wall in the 3rd room from east located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 21, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Jul 21, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Jul 21, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 21, 2021 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west
Jul 21, 2021 · Apt 3D
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Jul 15, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at vestibule at public hall, 1st story
Jul 15, 2021
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at vestibule at public hall, 1st story
Jul 15, 2021
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 1st story
Jul 15, 2021
Closed — Violation dismissed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Door
Jul 20, 2026 · Apt 3D
Close - Door/window
Door
Jul 20, 2026 · Apt 3D
Close - Water leak
Slow leak
Apr 22, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Apr 22, 2025 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 22, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Door/window
Door
Dec 28, 2022 · Apt 4F
Close - Door/window
Door frame
Dec 28, 2022 · Apt 4F
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 1A
Close - Heat/hot water
Entire building
Oct 29, 2022 · Apt BLDG
Close - Door/window
Door
Oct 20, 2022 · Apt 3D
Close - Plumbing
Basin/sink
Oct 20, 2022 · Apt 3D
Close - Appliance
Electric/gas range
Oct 20, 2022 · Apt 3D
Close - Paint/plaster
Wall
Oct 20, 2022 · Apt 3D
Close - Paint/plaster
Radiator
Oct 20, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Oct 20, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Oct 8, 2022 · Apt 3D
Close - Unsanitary condition
Sewage
Oct 8, 2022 · Apt 3D
Close - Flooring/stairs
Floor
Oct 8, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Oct 8, 2022 · Apt 3D
Close - Flooring/stairs
Floor
Oct 8, 2022 · Apt 3D
Close - Flooring/stairs
Floor
Aug 2, 2022 · Apt 3D
Close - Plumbing
Basin/sink
Aug 2, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Aug 2, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Aug 2, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Jul 29, 2022 · Apt 3D
Close - Flooring/stairs
Floor
Jun 3, 2022 · Apt D
Close - Electric
Wiring
Jun 3, 2022 · Apt D
Close - Unsanitary condition
Pests
Jun 3, 2022 · Apt D
Close - Door/window
Door
Jun 3, 2022 · Apt D
Close - Flooring/stairs
Floor
Jun 3, 2022 · Apt D
Close - Plumbing
Basin/sink
Jun 3, 2022 · Apt D
Close - Unsanitary condition
Mold
Jun 3, 2022 · Apt D
Close - Paint/plaster
Wall
Apr 7, 2022 · Apt BSMT
Close - Unsanitary condition
Pests
Apr 7, 2022 · Apt BSMT
Close - Door/window
Door frame
Nov 5, 2021 · Apt 3D
Close - Flooring/stairs
Stairs
Oct 10, 2021 · Apt 3D
Close - General
Bell/buzzer/intercom
Aug 23, 2021 · Apt 3D
Close - General
Bell/buzzer/intercom
Aug 23, 2021 · Apt 3D
Close - Unsanitary condition
Pests
Jul 13, 2021 · Apt 3D
Close - Unsanitary condition
Pests
Jul 13, 2021 · Apt 3D
Close - Flooring/stairs
Floor
Jul 13, 2021 · Apt 3D
Close - General
Janitor/super
Jun 30, 2021 · Apt 4F
Close - Door/window
Door
Jun 30, 2021 · Apt 4F
Close - Flooring/stairs
Floor
May 28, 2021 · Apt C1
Close - Paint/plaster
Ceiling
May 28, 2021 · Apt C1
Close - Unsanitary condition
Garbage/recycling storage
Jan 7, 2021 · Apt 4F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1916
- Floors
- 4
- Residential units
- 24
- Building area
- 20,940 ft²
- Lot area
- 7,747 ft²
- Zoning
- R6A
- Community board
- 310
- Council district
- 47
- Block / lot
- 5861 / 53
- Assessed value
- $603,900
- Landmark / historic district
- No
HPD registration #327821, last renewed Sep 13, 2025.
Questions about 6820 Ridge Boulevard
Who owns 6820 Ridge Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Ardot Realty LLC.
Does 6820 Ridge Boulevard have violations?
Yes. NYC HPD has recorded 95 housing violations at this property.
Is 6820 Ridge Boulevard rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 96% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 6820 Ridge Boulevard built?
City records list 1916 as the year it was built.
How many apartments are in 6820 Ridge Boulevard?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.