1458 49 Street
Brooklyn, NY 11219BBL 3-05643-0031Map
Owner of record: Atereth Equities LLC
1458 49 Street is an elevator apartment building built in 1939 in Brooklyn, 11219. It has 41 residential units across 6 floors. The owner of record is Atereth Equities LLC. HPD has recorded 90 housing violations here, most recently on August 14, 2026. 41 of the 50 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 90
- DOB violations
- 19
- ECB violations
- 6
- HPD complaints
- 84
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 90
- BHazardous
Remove all encumbrances consisting of bicycle chained at balustrade beyond stair treads and obstructed egress part at public hall, 1st story
Aug 14, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 5th story
Jun 10, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at building entrance door
Jun 10, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 1, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq/ft at the east wall in the bathroom located at apt 5e, 5th story, 1st apartment from north at east original violation 18713001 issued 15-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 15, 2026 · Apt 5E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the private hallway located at apt 5e, 5th story, 1st apartment from north at east
Mar 15, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen , the 1st room from north at east, the 1st room from north at west, the 3rd room from north located at apt 5e, 5th story, 1st apartment from north at east
Mar 15, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east
Mar 15, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, west wall in the private hallway located at apt 5e, 5th story, 1st apartment from north at east
Mar 15, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq/ft at the east wall in the bathroom located at apt 5e, 5th story, 1st apartment from north at east
Mar 15, 2026 · Apt 5E
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at entrance to compactor closet at public hall, 6th story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at entrance to compactor closet-, at public hall, 5th story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs at the entrance .to compactor closet, at public hall, 4th story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at entrance to compactor closet , at public hall, 3rd story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs at the .entrance to compactor closet, at public hall, 2nd story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at entrance to compactor closet, at public hall, 1st story, section ''east''
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing , the brick setted and obstructed entrance door to compactor room, in the east sections, at cellar
Apr 9, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at cellar
Apr 9, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 9, 2025
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3f, 3rd story, 2nd apartment from north at east
Mar 4, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5c, 5th story, 1st apartment from west at north
Mar 4, 2025 · Apt 5C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4b, 4th story, 1st apartment from south at west
Mar 4, 2025 · Apt 4B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3g, 3rd story, 1st apartment from east at south
Mar 4, 2025 · Apt 3G
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2a, 2nd story, 2nd apartment from east at south
Mar 4, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2c, 2nd story, 1st apartment from west at north
Mar 4, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2g, 2nd story, 1st apartment from east at south
Mar 4, 2025 · Apt 2G
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1f, 1st story, 2nd apartment from north at east
Mar 4, 2025 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st room from east located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, west wall in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 2nd closet from west at north wall door in the foyer located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from east at south located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st window frame from south at west wall, 1st radiator from south at west wall in the 3rd room from east at south located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 6 in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from east at south located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the foyer located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, chair rails at east wall, 1st window frame from south at west wall in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Jan 7, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Dec 19, 2024 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Dec 19, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of discarded baby carriages stored at public hall, 3rd story, section ''north''
Dec 17, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bagged trash, loose debris, discarded baby carriages, and household items stored at public hall, 5th story, section ''north''
Dec 17, 2024
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north
Sep 17, 2024 · Apt 6C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north located at apt 6c, 6th story, 1st apartment from west at north
Sep 17, 2024 · Apt 6C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north
Sep 17, 2024 · Apt 6C
Closed — Violation closed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 31, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 8, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2008
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2004
Dob violation - resolved - Elevator elevatorrequired
3p3114
Feb 4, 2003
Dob violation - resolved - Elevator elevatorrequired
3p3114
Mar 24, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 1990
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 1988
Dob violation - resolved
ECB violations · 6
- Class - 2
8.v.10,100.m.7,68.b.7,71.o.2=(8-v-10)car floor to lanfry sill not level,repair/(100-m-7)no prints for controller in motor room provide /(68-b-7)log book insufficient last entry (5-11-18,provide monthly service
Dec 12, 2018
Resolve - Class - 2
02.x.10,14.o.02,42.g.11,20.i.11,42.v.01,70.o.02:(02-x-10)repair phone.(14-o-02)clean the mirror insie th car.(42-g-11)(42-g-11)replace the fuse 6 amp to 3 amp.(20-i-11)replace vision panel on 4th and 5th floor.
Oct 11, 2018
Resolve - Class - 2
8v1,5e1,10h11,16e10,67l10,68m7,57bb7,56y2,56y13-8v1)car floor to lading sill not level, adjust. 5e1)car door rubbing, adjust. 10h11)car door gibs worn, replace. 16e10)hoistway door rubbing, repair. 67l10)commun
Dec 11, 2017
Resolve - Class - 1
05n10,67x10. 05n-repair bypassed door zone lock and render operative;67x-repair phone line.
Dec 10, 2016 · Penalty $5,000
Active - Class - 2
67x10,70o02,81m07,16b01,60l10: 67x;car emer communication inoperative 16b;1st flr door slamming shut 60l;light out in mach room.
Aug 28, 2012
Resolve - Class - 2
B254,18a,25a,30a,32a,50,50a,b,c. 50- waste oil and debris in oil tank room, also tank sign missing. 50a- anti-syphon valve missing on suction line. 50b- both low water cut offs or one water connection to boiler
May 22, 2012
Resolve
Complaints
- Plumbing
Water supply
Aug 13, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 13, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 22, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 21, 2026 · Apt 6E
Close - Heat/hot water
Entire building
Jun 21, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jun 21, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 4, 2026 · Apt 5G
Close - Paint/plaster
Wall
Mar 12, 2026 · Apt 5E
Close - Paint/plaster
Door/frame
Mar 12, 2026 · Apt 5E
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 13, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 6, 2025 · Apt BLDG
Close - Safety
Window guard broken/missing
Dec 8, 2024 · Apt 5A
Close - Heat/hot water
Entire building
Sep 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 13, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Feb 8, 2024 · Apt 1D
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 11, 2022 · Apt BLDG
Close - Safety
Window guard broken/missing
Aug 17, 2022 · Apt 4B
Close - Paint/plaster
Wall
Jun 18, 2020 · Apt 6C
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 6, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2019 · Apt 5E
Close - Door/window
Door
Nov 27, 2018 · Apt 6E
Close - Heat/hot water
Entire building
Nov 11, 2018 · Apt 6A
Close - Electric
Power outage
Sep 21, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 23, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 10, 2018 · Apt BLDG
Close - Water leak
Slow leak
Dec 19, 2016 · Apt 3G
Close - Heat/hot water
Entire building
Jun 10, 2016 · Apt 6B
Close - Heat/hot water
Apartment only
Jan 12, 2016 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2015 · Apt 2F
Close - General
Window guards
Aug 28, 2013 · Apt 3B
Close - General
Window guards
Aug 22, 2013 · Apt 4E
Close - Heating
Heat related
Feb 19, 2013 · Apt 6A
Close - Heating
Heat related
Feb 9, 2013 · Apt 6A
Close - Heating
Heat related
Feb 6, 2013 · Apt 6FL
Close - Heating
Heat related
Jan 23, 2013 · Apt 6A
Close - Heating
Heat related
Jan 23, 2013 · Apt 4F
Close - Heating
Heat related
Mar 29, 2012 · Apt 4F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1939
- Floors
- 6
- Residential units
- 41
- Building area
- 48,664 ft²
- Lot area
- 12,000 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 44
- Block / lot
- 5643 / 31
- Assessed value
- $1,606,950
- Landmark / historic district
- No
HPD registration #357425, last renewed Jul 15, 2026.
Questions about 1458 49 Street
Who owns 1458 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is Atereth Equities LLC.
Does 1458 49 Street have violations?
Yes. NYC HPD has recorded 90 housing violations at this property.
Is 1458 49 Street rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 100% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1458 49 Street built?
City records list 1939 as the year it was built.
How many apartments are in 1458 49 Street?
It has 41 residential units and 42 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.