1455 49 Street
Brooklyn, NY 11219BBL 3-05636-0052Map
Owner of record: Overlea Equities LLC
1455 49 Street is an elevator apartment building built in 1938 in Brooklyn, 11219. It has 47 residential units across 6 floors. The owner of record is Overlea Equities LLC. HPD has recorded 126 housing violations here, most recently on October 20, 2025. 28 of the 50 most recent violations are still open. City tax records listed 46 rent-stabilized apartments here in 2024.
- HPD violations
- 126
- DOB violations
- 22
- ECB violations
- 8
- HPD complaints
- 84
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 126
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame in the private hallway located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 4b, 4th story, 4th apartment from north at east
Oct 20, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1c, 1st story, 1st apartment from east at south
Oct 14, 2025 · Apt 1C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4b, 4th story, 4th apartment from west at north
Oct 14, 2025 · Apt 4B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5f, 5th story, 4th apartment from east at south
Oct 14, 2025 · Apt 5F
Open — Nov sent out
Show 40 more ↓
- BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5a, 5th story, 3rd apartment from west at north
Oct 14, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6f, 6th story, 4th apartment from east at south
Oct 14, 2025 · Apt 6F
Closed — Violation closed - CImmediately hazardous
Replace with new the missing safety glass pane at window at north wall at public hall, 6th story
Oct 14, 2025
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 2nd story, 4th apartment from west at north
Oct 14, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4e, 4th story, 3rd apartment from east at south
Oct 14, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1a, 1st story, 3rd apartment from west at north
Oct 14, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Oct 14, 2025
Open — Not complied with - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3f, 3rd story, 4th apartment from east at south
Oct 14, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Oct 14, 2025 · Apt 3D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3e, 3rd story, 3rd apartment from east at south
Oct 14, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3h, 3rd story, 2nd apartment from west at north
Oct 14, 2025 · Apt 3H
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2d, 2nd story, 2nd apartment from east at south
Oct 14, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1h, 1st story, 2nd apartment from west at north
Oct 14, 2025 · Apt 1H
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Aug 5, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Aug 5, 2025 · Apt 5G
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 6, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at compactor closet door at public hall, 6th story
Feb 1, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 1st story
Feb 1, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper to compactor at public hall, 6th story
Feb 1, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 6th story
Feb 1, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill front balcony north stack at fire escape, 4th story
Aug 24, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill front balcony south stack at fire escape, 4th story
Aug 24, 2020
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts and balconies front stack of building at fire escape
Aug 24, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east walll at public hall, 5th story
Aug 24, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 5th story
Aug 24, 2020
Open — Nov sent out - CImmediately hazardous
Arrange and make self-closing the doors compactor closet at public hall, 5th story
Aug 24, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
Aug 24, 2020 · Apt 5C
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 5 gallon water bottles at front of building south stack at fire escape, 2nd story
Aug 24, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioners and household items on 4th and 2nd story balconies at east 2nd stack from north (front of building)
Apr 6, 2020
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioners on 6th,5th ,4th, 3rd and 2nd story balconies at east 1st stack from north (front of building)
Apr 6, 2020
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 3h, 3rd story
Jan 8, 2020 · Apt 3H
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment ... in the entire apartment located at apt 1a, 1st story, 3rd apartment from north at east
Jan 8, 2020 · Apt 1A
Open — Nov sent out
DOB building violations · 22
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 31, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2016
Dob violation - resolved
Show 12 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 1994
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Elevator elevatorrequired
Device #3p3232
May 14, 1991
Vp-violation unserved ecb-active - Elevator elevatorrequired
(51)file bn for new controller and provide for tests of same to bee witnesses by an inspector of this dept..(52)repair stairway to motor room
Aug 9, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 20, 1988
Dob violation - resolved
ECB violations · 8
- Class - 2
Missing cab mirror. misaligned car shoes. clean governor rope for proper inspection. brake maintenance tag must have complete date. expired fire extinguisher.
Mar 20, 2024 · Penalty $625
Resolve - Class - 2
Misaligned cab mirror. operator cover missing. misaligned main line cover. unreadable controller fuses. eliminate gap at top of left brake pad. provide brake maintenance tag with full date.
Oct 3, 2023
Resolve - Class - 2
Missing in case of fire signs. clean pit. misaligned mirror. unguarded cab lighting. label hoistway doors where needed. missing mr ventilation.seal hoist mach9ine leaks. excessive noise from hoist machine.expir
Jun 22, 2021 · Penalty $310
Resolve - Class - 2
Misaligned cab mirror. unguarded operator. unreadable main line fuses. unreadable controller fuses. maint log not up to date. seal hoist machine leaks. vibrations in hoist motor. provide keys to basement
Dec 15, 2020 · Penalty $310
Resolve - Class - 1
Door zone restrictor not working tampered with disable taken apart (cu). top of car fan missing.
Oct 15, 2020 · Penalty $1,250
Resolve - Non-hazardous
13m, 14m, 54m, 03i. 54--provide label that states name of elevator service company. 03--cover all damaged vent areas in cab.
Mar 21, 1995 · Penalty $1,000
Resolve - Non-hazardous
15l;21x;25q;37r;50r;53l;74m; 15.h.d. check. 37.installed new controller & selector w/o a permit. 50.improper wiring of motor. 74.capacity plate.
Sep 24, 1991 · Penalty $75
Resolve - Non-hazardous
17i,21i,74i,74 repair step to motor room
May 14, 1991 · Penalty $75
Resolve
Complaints
- Door/window
Window frame
Nov 21, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 29, 2020 · Apt 5C
Close - Heat/hot water
Entire building
Oct 29, 2020 · Apt 1F
Close - Paint/plaster
Wall
Aug 20, 2020 · Apt 5C
Close - Plumbing
Toilet
Aug 20, 2020 · Apt 5C
Close - Safety
Smoke detector
Aug 20, 2020 · Apt 5C
Close - Safety
Carbon monoxide detector
Aug 20, 2020 · Apt 5C
Close - Heat/hot water
Entire building
Oct 29, 2019 · Apt 6H
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 17, 2019 · Apt 2H
Close - Safety
Window guard broken/missing
Aug 29, 2019 · Apt 1G
Close - Heat/hot water
Entire building
Apr 29, 2019 · Apt 6E
Close - Unsanitary condition
Garbage/recycling storage
Aug 31, 2018 · Apt BLDG
Close - Elevator
Maintenance
Aug 31, 2018 · Apt BLDG
Close - Elevator
Maintenance
Aug 31, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
May 12, 2017 · Apt 5C
Close - Plumbing
Water supply
May 12, 2017 · Apt 5C
Close - Heat/hot water
Entire building
Apr 23, 2017 · Apt 4E
Close - Heat/hot water
Entire building
Feb 15, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt 6C
Close - Heat/hot water
Entire building
Jan 6, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2016 · Apt 2G
Close - Heat/hot water
Entire building
Dec 3, 2015 · Apt 6D
Close - Heat/hot water
Entire building
Nov 13, 2015 · Apt 5E
Close - Plumbing
Bathtub/shower
Aug 25, 2015 · Apt 6D
Close - Heat/hot water
Entire building
Oct 24, 2014 · Apt 4G
Close - Heating
Heat related
Jan 7, 2014 · Apt 6A
Close - Heating
Heat related
Feb 18, 2013 · Apt NA
Close - Plumbing
Water-leaks
Nov 19, 2012 · Apt 6B
Close - Paint/plaster
Ceiling
Nov 19, 2012 · Apt 6B
Close - General
Windows
Oct 31, 2011 · Apt 6G
Close - General
Mold
Oct 31, 2011 · Apt 6G
Close - Paint/plaster
Wall
Oct 31, 2011 · Apt 6G
Close - Plumbing
Water-leaks
Oct 31, 2011 · Apt 6G
Close - Heating
Heat related
Oct 30, 2011 · Apt BLDG
Close - Heating
Heat related
Oct 28, 2011 · Apt 3A
Close - Heating
Heat related
Oct 27, 2011 · Apt 3H
Close - Heating
Heat related
Dec 14, 2010 · Apt 1C
Close - Heating
Heat related
Dec 1, 2009 · Apt 1A
Close - Plumbing
Toilet
Dec 1, 2009 · Apt 1A
Close - Heating
Heat related
Nov 10, 2009 · Apt 3H
Close - Heating
Heat related
Oct 14, 2009 · Apt 1A
Close - General
Locks
May 14, 2009 · Apt 6B
Close - Heating
Heat related
Feb 20, 2009 · Apt 1G
Close - Heating
Heat related
Feb 3, 2009 · Apt 1G
Close - Heating
Heat related
Feb 2, 2009 · Apt 1G
Close - Heating
Heat related
Feb 2, 2009 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1938
- Floors
- 6
- Residential units
- 47
- Building area
- 59,528 ft²
- Lot area
- 14,000 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 44
- Block / lot
- 5636 / 52
- Assessed value
- $1,327,500
- Landmark / historic district
- No
HPD registration #357424, last renewed Jul 15, 2026.
Questions about 1455 49 Street
Who owns 1455 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is Overlea Equities LLC.
Does 1455 49 Street have violations?
Yes. NYC HPD has recorded 126 housing violations at this property.
Is 1455 49 Street rent stabilized?
NYC Department of Finance tax bills listed 46 rent-stabilized units here in 2024 (about 98% of its 47 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1455 49 Street built?
City records list 1938 as the year it was built.
How many apartments are in 1455 49 Street?
It has 47 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.