490 Ocean Parkway
Brooklyn, NY 11218BBL 3-05389-0046Map
Owner of record: Unavailable Owner
490 Ocean Parkway is an elevator apartment building built in 1931 in Brooklyn, 11218. It has 51 residential units across 7 floors. The owner of record is Unavailable Owner. HPD has recorded 137 housing violations here, most recently on June 3, 2026. 3 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 137
- DOB violations
- 17
- ECB violations
- 18
- HPD complaints
- 138
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 137
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 12a, 4th story, 1st apartment from north at east
Jun 3, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor chute inside the compactor closet at east wall at public hall, 4th story
Jun 3, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than six inches out of the window at first stack from east at north wall at building front at fire escape, 2nd story
Jun 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 12a, 4th story, 1st apartment from north at east
Jun 3, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective window balance at lower sash leading to fire escape at east wall in the 2nd room from east at north located at apt 12a, 4th story, 1st apartment from north at east
Jun 3, 2026 · Apt 12A
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection ... in the bathroom located at apt 23, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 12a, 4th story, 1st apartment from north at east
Apr 22, 2026 · Apt 12A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor under the base cabinet at sink in the kitchen located at apt 12a, 4th story, 1st apartment from north at east
Apr 22, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 12a, 4th story, 1st apartment from north at east
Apr 22, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and at ceiling in the 2nd room from east at north located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, west wall and at ceiling in the 1st room from east at north located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, at east wall, at west wall and at north wall in the 1st room from east at center located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet floor at west wall in the kitchen located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and at ceiling in the kitchen located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and at north wall in the foyer located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin at south wall in the bathroom located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at wasteline at washbasin in the bathroom located at apt 12a, 4th story, 1st apartment from north at east
Feb 17, 2026 · Apt 12A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the bathroom located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 2nd room from east at center located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from north at east wall in the private hallway located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st wall cabinet from north at east wall in the private hallway located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 2nd closet from north at east wall door frame, north wall, 1st window frame from south at west wall in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall in the 2nd room from east at center located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st riser from east at south wall, 2nd riser from east at south wall, north wall, south wall, 1st window frame from south at west wall in the kitchen located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, 2nd closet from north at east wall wall in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 2nd closet from north at east wall wall in the 2nd room from east at south located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 23, 2nd story, 1st apartment from west at north , section at south
Aug 14, 2025 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building entrance door
Dec 18, 2024
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 4th story balcony at north stack at building front at fire escape
Jul 25, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 76, 7th story, 1st apartment from west at north
Feb 13, 2024 · Apt 76
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 76, 7th story, 1st apartment from west at north
Feb 13, 2024 · Apt 76
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 76, 7th story, 1st apartment from west at north
Feb 13, 2024 · Apt 76
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 76, 7th story, 1st apartment from west at north
Feb 13, 2024 · Apt 76
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the 1st room from east at south, the 2nd room from east at north located at apt 61, 6th story, 1st apartment from north at east
May 24, 2022 · Apt 61
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 61, 6th story, 1st apartment from north at east
May 24, 2022 · Apt 61
Closed — Violation closed
DOB building violations · 17
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed
Show 7 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 7, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Construction other optional
Approvals and permits revoked as per letter dated 2-24-14 the departme nts of buildings has hereby revoked all approvals and permits assoc with appl.#310088794, you are hereby ordered to stop all work immed and make site safe/remedy: stop all ork make site safe contact comm offie at (718) 802-4098
Apr 9, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 16, 2012
Dob violation - dismissed
ECB violations · 18
- Class - 3
Fence exceeds permitted height. noted: at a 4-story multi dwelling observed a fence with a gate and brick archway above the gate. barbed wire was installed to the top of brick archway increasi ng overall height
Sep 2, 2026 · Penalty $200
Active - Class - 2
Misaligned cab mirror. repair lobby hall button station. repair car phone. unguarded cab lighting. missing keys for governor access door. unlocked controller room doors. several landings are illegal vestibule c
May 3, 2023
Resolve - Class - 1
Cease use item: bottom landing door does not open when car reaches bottom landing.
May 3, 2023 · Penalty $1,250
Resolve - Class - 2
Bottom landing door stops platform when pulled. damaged and misaligned top landing door.
May 3, 2023
Resolve - Class - 2
Failure to maintain exterior of bldg facade&appurtenances note:observed@exp1,2 vert&step cracks (joists only)@multiple locations underneath windows@level2,4,step crack brickwork in multiple locations around sam
Nov 15, 2022 · Penalty $1,250
Resolve - Class - 1
Emergency in car stop switch damaged (cu). device not tag with the city id number . device run 1 inch with the hoistway open (cu).
Aug 6, 2020 · Penalty $1,250
Resolve - Class - 2
Device not tag with the city id nunber in the cab. emergency stop switch no buzzer.
Aug 6, 2020
Resolve - Class - 2
Provide in case of fire signs where missing. inoperative cab lighting. misaligned cab mirror. replace worn hoistway door gibs where needed. main line can be opened when power on. pit stop switch shuts down car.
Jul 7, 2020 · Penalty $625
Resolve - Class - 1
Repair and restore to service.
Feb 11, 2020 · Penalty $1,250
Resolve - Class - 1
97x17 out of service. upon inspection the device is found to be out of service. rmdy: restore device into service immediately. contact nyc dob at 212-393-2435 and email eir at buildings.nyc.gov that device has
Jul 1, 2019 · Penalty $1,250
Resolve
Show 8 more ↓
- Class - 1
97x17 the only elevator in building out of service. upon inspection the device is found to be out of service creating a hazardous conditionas per 14cny 110-02. restore to service immediately and notify nycdob
Jun 13, 2018
Resolve - Class - 1
*42x10,*05m07,16t07,12q03,12x10,27m07,53e01,61r11,39q03,26m07,18b11,17h11,40i10,40b07,34q03,45r09,45t07,72b10,69b11,13b10 *cease use items 42x-inoperative door positioning monitor as required by code; 05m-zone
Jun 4, 2018
Resolve - Class - 1
Failure to institute/install guardrails/ fall protection. noted: pipe scaffold installed under permit #320499162 w/no guard rails installed observed stucco work at left side of bldg completed. remedy: stop all
May 3, 2013 · Penalty $1,200
Resolve - Class - 2
Failure to file a tr-1.noted:found 12"light gauge steel joists installed @ site under application no#310088794 & tr-1 has not been filed.stop all work as per a/c 28-207.2 & swo posted on front fence.rem:stop al
Apr 16, 2012
Resolve - Class - 1
Sec. 3314.9. failure to provide required bracing (tie backs) for supported scaffold. at time of inspection observed commenced, not active work at premises to repair facade/replace parapit permitted under posted
Feb 4, 2012 · Penalty $800
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection observed commenced work at premises to repair facade/replace parapit, etc... permitted under job #320336926. work is
Feb 4, 2012
Resolve - Class - 1
Failure to institute/install guadrails/fall protection. noted: at construction site under appl 320336926-ot, repair work on facade & parapetwalls & observed no guardrails or fall protection installed at roof
Dec 15, 2011 · Penalty $1,200
Resolve - Class - 2
Work w/o a permit. noted: at construction site under appl #320336926-ot, found garbage chute approx 45'h & pipe scaffold set-ups approx 48'h & 54'h installed w/o a permit.stop all work as per a/c 28-207.2 & swo
Dec 15, 2011
Resolve
Complaints
- Plumbing
Basin/sink
Feb 9, 2026 · Apt 12A
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 12A
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 12A
Close - Plumbing
Basin/sink
Feb 9, 2026 · Apt 12A
Close - Unsanitary condition
Pests
Aug 7, 2025 · Apt 23
Close - Flooring/stairs
Floor
Aug 7, 2025 · Apt 23
Close - Plumbing
Basin/sink
Aug 7, 2025 · Apt 23
Close - Heat/hot water
Entire building
Jul 26, 2025 · Apt 51
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jul 23, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 13, 2024 · Apt 76
Close - Safety
Smoke detector
Feb 13, 2024 · Apt 76
Close - Safety
Carbon monoxide detector
Feb 13, 2024 · Apt 76
Close - Unsanitary condition
Pests
Feb 13, 2024 · Apt 76
Close - Heat/hot water
Entire building
Jan 31, 2024 · Apt BLDG
Close - Water leak
Slow leak
Dec 4, 2023 · Apt 16
Close - Heat/hot water
Apartment only
Jul 7, 2023 · Apt 62
Close - Plumbing
Water supply
Mar 1, 2023 · Apt 71
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
May 20, 2022 · Apt 61
Close - Water leak
Slow leak
May 20, 2022 · Apt 61
Close - Door/window
Door
Mar 8, 2022 · Apt 23
Close - Paint/plaster
Wall
Mar 8, 2022 · Apt 23
Close - Paint/plaster
Ceiling
Mar 8, 2022 · Apt 23
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Oct 29, 2021 · Apt 61
Close - General
Bell/buzzer/intercom
Oct 24, 2021 · Apt 16
Close - Plumbing
Steam pipe/riser
Oct 11, 2021 · Apt 19
Close - Paint/plaster
Ceiling
Oct 11, 2021 · Apt 19
Close - Safety
Smoke detector
Oct 11, 2021 · Apt 19
Close - Water leak
Slow leak
Oct 11, 2021 · Apt 19
Close - Heat/hot water
Entire building
Sep 4, 2021 · Apt BLDG
Close - Water leak
Heavy flow
Sep 1, 2021 · Apt 61
Close - Plumbing
Basin/sink
Oct 17, 2019 · Apt 8
Close - Flooring/stairs
Floor
Jun 11, 2019 · Apt 20
Close - Paint/plaster
Radiator
Jun 11, 2019 · Apt 20
Close - Paint/plaster
Window/frame
Jun 11, 2019 · Apt 20
Close - General
Bell/buzzer/intercom
May 20, 2019 · Apt 65
Close - Electric
Wiring
May 20, 2019 · Apt 65
Close - Safety
Smoke detector
Jul 28, 2018 · Apt 53
Close - Electric
Power outage
Jul 28, 2018 · Apt 53
Close - Water leak
Heavy flow
Jul 28, 2018 · Apt 53
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2018 · Apt 24
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2018 · Apt 24
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2018 · Apt 24
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 31
Close - Unsanitary condition
Pests
Oct 5, 2017 · Apt 8
Close - Unsanitary condition
Pests
Jun 28, 2017 · Apt 8
Close - Heat/hot water
Entire building
Dec 27, 2016 · Apt 4
Close - Heat/hot water
Entire building
Oct 3, 2016 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1931
- Floors
- 7
- Residential units
- 51
- Building area
- 58,704 ft²
- Lot area
- 14,000 ft²
- Zoning
- R7A
- Community board
- 312
- Council district
- 39
- Block / lot
- 5389 / 46
- Assessed value
- $1,832,400
- Landmark / historic district
- No
HPD registration #327831, last renewed Jul 27, 2026.
Questions about 490 Ocean Parkway
Who owns 490 Ocean Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 490 Ocean Parkway have violations?
Yes. NYC HPD has recorded 137 housing violations at this property.
Is 490 Ocean Parkway rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 14% of its 51 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 490 Ocean Parkway built?
City records list 1931 as the year it was built.
How many apartments are in 490 Ocean Parkway?
It has 51 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.