1145 38 Street
Brooklyn, NY 11218BBL 3-05291-0014Map
Owner of record: 1145 38th LLC
1145 38 Street is a walk-up apartment building built in 1931 in Brooklyn, 11218. It has 6 residential units across 3 floors. The owner of record is 1145 38th LLC. HPD has recorded 32 housing violations here, most recently on August 14, 2018. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 32
- DOB violations
- 0
- ECB violations
- 5
- HPD complaints
- 27
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at north, south and east wall at vestibule , 1st story
Aug 14, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors building entrance at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall and ceiling at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at north wall at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at vestibule , 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 14, 2018
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd story balcony at building front
Aug 14, 2018
Closed — Violation dismissed
Show 22 more ↓
- ANon-hazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required (light fixture present) , 1st story
Aug 14, 2018
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective building entrance door lock , 1st story
Aug 14, 2018
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of consisting of carpet and household items at public hall, 1st story
Aug 14, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperative located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall, north wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the 1st room from east at north, the 1st room from east at south, the 2nd room from east at south located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 9, 2018
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 9, 2018
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective locking device at building entrance door
Aug 9, 2018
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of car seats, furniture, shopping carts, shoe rack, rolls of carpets at public hall, 1st story
Aug 9, 2018
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective electrical outlet cover at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Aug 9, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes garbage bags with household effects at fire escape, 2nd story
Aug 9, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Aug 9, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 5
- Class - 3
As per section of law hmc 27-2033 a legible boiler room access sign must be posted conspicuously in lobby. correct violating condition and submit a certificate of correction,
May 2, 2022
Resolve - Hazardous
Occupancy contrary to that allowed by the bldg dept records which indicates bsmt legal use, storage & boiler rm.note:bsmt converted & aranged with 2 lock single rms kitchen gas stove a 3pc bathroom with shower
Jun 11, 2006 · Penalty $2,500
Active - Hazardous
Work w/o a permit.work noted:full height partition walls erected creating 2 rms arange as habitable dwelling space, kitchen with gas stove &3pc bathroom with stall shower created with plumbing work completed
Jun 11, 2006 · Penalty $800
Active - Hazardous
Failure to maintain building noted at time of inspection visible structural defects at cellar level west side 1)defective floor joist approx: 2x8/12ft length spanning north-south need to be replace.
Jun 3, 2006 · Penalty $800
Active - Non-hazardous
Failure to maintain.1)excessive debris at cellar,bags of trash,hot water heaters 3 units, 2 front cellar window missing,4 water dripping.remedy:maintaini bldg.
Jul 21, 2005 · Penalty $180
Resolve
Complaints
- Safety
Smoke detector
Aug 8, 2018 · Apt 1R
Close - Water leak
Slow leak
Aug 8, 2018 · Apt 1R
Close - Flooring/stairs
Floor
Aug 8, 2018 · Apt 1R
Close - Paint/plaster
Wall
Aug 8, 2018 · Apt 1R
Close - Paint/plaster
Wall
Aug 8, 2018 · Apt 1R
Close - Door/window
Door
Aug 8, 2018 · Apt BLDG
Close - Electric
No lighting
Aug 8, 2018 · Apt BLDG
Close - General
Floor
Jun 15, 2011 · Apt 2R
Close - General
Ceramic-tile
Jun 15, 2011 · Apt 2R
Close - General
Floor
Jun 15, 2011 · Apt 2R
Close
Show 17 more ↓
- Nonconst
Vermin
Jun 15, 2011 · Apt 2R
Close - Paint/plaster
Wall
Jun 15, 2011 · Apt 2R
Close - Appliance
Refrigerator
Jun 15, 2011 · Apt 2R
Close - General
Locks
Jun 10, 2010 · Apt NA
Close - General
Doors
Jun 10, 2010 · Apt NA
Close - Nonconst
Smoke detector
Jun 10, 2010 · Apt 2F
Close - Nonconst
Carbon monoxide
Jun 10, 2010 · Apt 2F
Close - Paint/plaster
Ceiling
Jun 10, 2010 · Apt 2F
Close - General
Ceramic-tile
Jun 10, 2010 · Apt 2F
Close - Plumbing
Bathtub/shower
Jun 10, 2010 · Apt 2F
Close - Nonconst
Vermin
Jun 10, 2010 · Apt 2F
Close - Nonconst
Smoke detector
Jun 10, 2010 · Apt 1R
Close - Nonconst
Carbon monoxide
Jun 10, 2010 · Apt 1R
Close - Electric
Wiring
Jun 10, 2010 · Apt 1R
Close - General
Mailbox
Feb 24, 2009 · Apt BLDG
Close - Plumbing
Water-leaks
Jan 11, 2004 · Apt 1R
Close - Heating
Heat related
Jan 11, 2004 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 1,900 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 39
- Block / lot
- 5291 / 14
- Assessed value
- $495,900
- Landmark / historic district
- No
HPD registration #328773, last renewed Nov 13, 2025.
Questions about 1145 38 Street
Who owns 1145 38 Street?
The owner of record in NYC Department of City Planning PLUTO data is 1145 38th LLC.
Does 1145 38 Street have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 1145 38 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1145 38 Street built?
City records list 1931 as the year it was built.
How many apartments are in 1145 38 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.