2744 Bedford Avenue
Brooklyn, NY 11210BBL 3-05245-0045Map
Owner of record: 2744 Bedford Avenue
2744 Bedford Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11210. It has 36 residential units across 4 floors. The owner of record is 2744 Bedford Avenue. HPD has recorded 434 housing violations here, most recently on May 28, 2026. 39 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 434
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 558
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 434
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the private hallway located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door to roof exit , section at south
May 28, 2026
Closed — Violation closed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4c, 4th story, 1st apartment from south at west , section at south
May 28, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3b, 3rd story, 1st apartment from east at south , section at east
May 28, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4d, 4th story, 2nd apartment from south at west , section at south
May 28, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — First no access to re- inspect violation
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, east wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, north wall, south wall, east wall, west wall in the foyer located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the private hallway located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules - missing located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 1a, 1st story, 1st apartment from north at east
May 28, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking device at first door to enter the building from the street at public hall, 1st story
May 28, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 28, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rear yard
Apr 28, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 5, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story, section ''west''
Apr 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at bulkhead , 4th story
Apr 5, 2026
Open — Not complied with - BHazardous
Remove all encumbrances consisting of large blue plastic barrel blocking egress to bulkhead at public hall stairs, 4th story
Apr 5, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock and latch set at building front entrance door , 1st story, section ''west''
Apr 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st door from south at west leading to rear yard at public hall, 1st story, section ''west''
Apr 5, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story, section ''west''
Apr 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 3, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Apr 3, 2026 · Apt 4F
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner at 2nd window from south at west at building front at fire escape, 4th story
Sep 16, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal fence at building front yard
Sep 16, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to central yard. at public hall, 1st story
May 1, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south , section ''west''
May 1, 2024 · Apt 2I
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective. in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south , section ''west''
May 1, 2024 · Apt 2I
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 2i, 2nd story, 1st apartment from east at south , section ''west''
May 1, 2024 · Apt 2I
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor. in the bathroom located at apt 2i, 2nd story, 1st apartment from east at south , section ''west''
May 1, 2024 · Apt 2I
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2i, 2nd story, 1st apartment from south at west , section at north
Apr 28, 2024 · Apt 2I
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door fram at 2nd door from west at at south at public hall, 1st story
Apr 28, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door leading to west yard at 1st door from south at west at public hall, 1st story
Apr 28, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch set in the entrance located at apt 2i, 2nd story, 1st apartment from south at west , section at north
Apr 28, 2024 · Apt 2I
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 2i, 2nd story, 1st apartment from south at west , section at north
Apr 28, 2024 · Apt 2I
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door , 1st story
Apr 28, 2024
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 3
- Class - 2
Work without a permit.during inspection at apt 2d of above premises observation of new electric outlets junction boxes and panel box throughout newly framed sheet rock walls in apt.no permit on file for work ap
Jan 24, 2024 · Penalty $625
Resolve - Class - 2
Hw temperature gauge above burner defective/hw storage tanks have incorrect safety discharge pipes;correct violation and submit the certificate of correction
Nov 26, 2021 · Penalty $655
Active - Hazardous
Failure to maintain hazardous defects are : no fresh air in take for boiler room. missing fire stopping on ceiling thru out entire cellar hanging exposed bx cables and old electrical wiring thro out cellar reme
May 5, 2004 · Penalty $800
Resolve
Complaints
- Safety
Window guard broken/missing
Mar 31, 2026 · Apt 4F
Close - General
Mailbox
Aug 6, 2025 · Apt BASEME
Close - Door/window
Door frame
Apr 24, 2024 · Apt 2I
Close - Paint/plaster
Wall
Apr 24, 2024 · Apt 2I
Close - Flooring/stairs
Floor
Apr 24, 2024 · Apt 2I
Close - Plumbing
Bathtub/shower
Apr 24, 2024 · Apt 2I
Close - Door/window
Window frame
Apr 24, 2024 · Apt 2I
Close - Appliance
Refrigerator
Apr 24, 2024 · Apt 2I
Close - Paint/plaster
Wall
Apr 24, 2024 · Apt 2I
Close - Flooring/stairs
Floor
Apr 24, 2024 · Apt 2I
Close
Show 40 more ↓
- Appliance
Electric/gas range
Apr 24, 2024 · Apt 2I
Close - Unsanitary condition
Mold
Apr 24, 2024 · Apt 2I
Close - Heat/hot water
Entire building
Dec 14, 2023 · Apt 2I
Close - Door/window
Window frame
Aug 25, 2023 · Apt 2I
Close - Heat/hot water
Entire building
Feb 22, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 13, 2023 · Apt 3H
Close - Appliance
Refrigerator
Jan 10, 2023 · Apt 1A
Close - Unsanitary condition
Mold
Jan 10, 2023 · Apt 1A
Close - Flooring/stairs
Floor
Jan 10, 2023 · Apt 1A
Close - Water leak
Heavy flow
Jul 29, 2022 · Apt 1A
Close - Water leak
Heavy flow
Jul 25, 2022 · Apt 1A
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 3, 2022 · Apt 2D
Close - Heat/hot water
Apartment only
Feb 2, 2022 · Apt 1A
Close - Heat/hot water
Entire building
Jan 9, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Dec 21, 2021 · Apt 1A
Close - Heat/hot water
Entire building
Dec 20, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2021 · Apt BLDG
Close - Plumbing
Water supply
Dec 12, 2021 · Apt 1A
Close - Heat/hot water
Entire building
Dec 12, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2021 · Apt BLDG
Close - Plumbing
Water supply
Dec 5, 2021 · Apt 1A
Close - Appliance
Refrigerator
Nov 29, 2021 · Apt 1A
Close - Unsanitary condition
Mold
Nov 29, 2021 · Apt 1A
Close - Plumbing
Radiator
Nov 29, 2021 · Apt 1AON1F
Close - Water leak
Heavy flow
Nov 29, 2021 · Apt 1AON1F
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2021 · Apt BLDG
Close - Door/window
Door
Sep 22, 2021 · Apt BLDG
Close - Water leak
Heavy flow
Sep 1, 2021 · Apt 2D
Close - Door/window
Window frame
Jul 26, 2021 · Apt 1
Close - Unsanitary condition
Mold
May 25, 2021 · Apt 1A
Close - Water leak
Slow leak
May 25, 2021 · Apt 1A
Close - Unsanitary condition
Mold
May 12, 2021 · Apt 1A
Close - Water leak
Damp spot
May 12, 2021 · Apt 1A
Close - Heat/hot water
Apartment only
May 1, 2021 · Apt 1H
Close - Door/window
Door
Mar 24, 2021 · Apt 2I
Close - Door/window
Door
Mar 24, 2021 · Apt 2I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 36
- Building area
- 32,000 ft²
- Lot area
- 10,000 ft²
- Zoning
- R4A
- Community board
- 314
- Council district
- 45
- Block / lot
- 5245 / 45
- Assessed value
- $671,850
- Landmark / historic district
- No
HPD registration #336764, last renewed Aug 27, 2025.
Questions about 2744 Bedford Avenue
Who owns 2744 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2744 Bedford Avenue.
Does 2744 Bedford Avenue have violations?
Yes. NYC HPD has recorded 434 housing violations at this property.
Is 2744 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 100% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2744 Bedford Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 2744 Bedford Avenue?
It has 36 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.