Foster Avenue
Brooklyn, NY 11210BBL 3-05227-0017Map
Owner of record: 1341-1351 Flatbush LLC
Foster Avenue is an elevator apartment building built in 2023 in Brooklyn, 11210. It has 55 residential units across 7 floors. The owner of record is 1341-1351 Flatbush LLC. HPD has recorded 24 housing violations here, most recently on October 14, 2026. 5 of the 24 most recent violations are still open. City tax records listed 55 rent-stabilized apartments here in 2024.
- HPD violations
- 24
- DOB violations
- 0
- ECB violations
- 15
- HPD complaints
- 173
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Properly repair or replace the broken or defective electrical light fixture at north wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from south at west
Oct 14, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Oct 14, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grouth at between tiles at north wall in the 1st bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Oct 14, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Oct 14, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
May 20, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets showerhead in the bathroom located at apt 5f, 5th story, 3rd apartment from south at west
Feb 11, 2026 · Apt 5F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7i, 7th story, 2nd apartment from north at east
Oct 20, 2025 · Apt 7I
Closed — Violation dismissed - BHazardous
Properly secure the loose door handle leading to the east 2 room in the 2nd room from east located at apt 7i, 7th story, 2nd apartment from north at east
Oct 20, 2025 · Apt 7I
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings throughout in the entire apartment located at apt 6f, 6th story, 2nd apartment from south at west
Feb 6, 2025 · Apt 6F
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions from water closet ... in the bathroom located at apt 6f, 6th story, 2nd apartment from south at west
Oct 14, 2024 · Apt 6F
Closed — Violation closed
Show 14 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at rear entrance on foster ave yard
May 11, 2015
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening - double cylinder key operated lock installed on iron door at rear yard entrance on foster ave
Mar 5, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the missing handrail at top of stair , 1st story
Mar 5, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin - 2nd sty apartment #1.
Aug 20, 2005
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of - double cylinder lock entrance door to building.
Jul 7, 2004
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom 2nd story apt. 1.
Jul 7, 2004
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of double cylinder key operated lock entrance door street to 1 sty public hall.
Feb 13, 1988
Closed — Violation closed - CImmediately hazardous
D26-17.07 adm code provide hot water at all hot water fixtures 2 sty apt 2 kitchen & bathroom. located at apt 2
Jan 2, 1987 · Apt 2
Closed — Violation closed - CImmediately hazardous
D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on boiler room door.
Jan 2, 1987
Closed — Violation dismissed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system cellar door locked.
Jan 2, 1987
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 15
- Class - 2
Adjust cab mirror (3001.6). inoperative phone (2.27.1.1.3). machine space keys missing (2.7.3.1.1). missing controller prints (appendix k3).
May 26, 2026 · Penalty $3,125
Active - Class - 1
Avoid inferference- obstruction of street traffic signs: at time of inspection observed side walk shed install at exp # 1 and the street traffic sign for the meter/street cleaning is obstructed by the side wal
Sep 13, 2022 · Penalty $625
Resolve - Class - 1
. i observed construction site at demolition phase combustible material had pile up approximately 6 to 7 feet high this creates an unsafe fire hazard for public and property. stop all work provide safety measur
Jul 6, 2022 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection of a demolition site, observed the adjacent building 1353 flatbush avenue the insulation exposed at the buildings exposure # 2 due to the demolition of 1351 flatbush avenue. must pr
Jul 1, 2022 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection, observed a demolition of 1349a flatbush avenue , large accumulations of construction debris and large accumulations of combustibles creates a hazard for 1st responders and fdny in
Jul 1, 2022
Resolve - Class - 1
At the time of my inspection, observed large accumulation of construction debris and combustible at 1351 flatbush avenue, created more debris than can be handled and removed within the working day, which create
Jul 1, 2022 · Penalty $2,500
Resolve - Class - 1
I observed construction site at demolition phase combustible material had pile up approximately 6 to 7 feet high this creates an unsafe fire hazard for public and property.stop all work provide safety measures
Jul 1, 2022
Resolve - Class - 1
I observed construction site at demolition phase combustible material had pile up approximately 6 to 7 feet high this creates an unsafe fire hazard for public and property.stop all work provide safety measures
Jul 1, 2022
Resolve - Class - 1
I observed construction site at demolition phase combustible material had pile up approximately 6 to 7 feet high this creates an unsafe fire hazard for public and property.stop all work provide safety measures
Jul 1, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping , piles of mix debris on site consisting of paper , wood , cardboard which creates a serious / hazardous fire condition. violation issued. remove all hazardous fire
Jun 30, 2022 · Penalty $625
Resolve
Show 5 more ↓
- Class - 2
Designated c.s fails to be present at jo site on this day of operations and / or have a designated c.p. on this job site as required 1343 flatbush avenue stop all work , provide c.s / cp.provide c.s / cp as r
Jun 30, 2022
Resolve - Class - 2
Failure to maintain bldg in code compliant manner defect noted:allow missing pc of ceiling a narrow location.rem:repair &/or replace.
Aug 23, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner:observation made in the center of ground fl. glamourous beauty hair salon water leaking through ceiling, causing ceiling to open & fall to flr.rmdy:modify syste
Jan 2, 2013 · Penalty $250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. at cellar location main house drain clogged & backed up causing sewage to overflow onto cellar floor.rmdy: modify system to conform to rs16.
Jan 2, 2013 · Penalty $250
Resolve - Hazardous
Fialure to maintain building hazardous note due to leak from above a portion of ceiling of first floor office came loose and fell office is located at 1347a flathbus ave.remedy: maintain building repair all def
Feb 14, 2003 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Pests
Oct 16, 2026 · Apt 4G
Open - Appliance
Refrigerator
Oct 14, 2026 · Apt 5B
Open - Door/window
Door
Oct 7, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Oct 7, 2026 · Apt 2C
Close - Electric
Lighting
Oct 7, 2026 · Apt 2C
Close - Plumbing
Toilet
Oct 7, 2026 · Apt 2C
Close - Water leak
Heavy flow
Oct 7, 2026 · Apt 2C
Close - Door/window
Door
Oct 7, 2026 · Apt BUILDI
Close - Unsanitary condition
Pests
Oct 7, 2026 · Apt BUILDI
Close - Door/window
Door
May 1, 2026 · Apt 3C
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 9, 2026 · Apt 5F
Open - Water leak
Heavy flow
Feb 9, 2026 · Apt 5F
Open - Paint/plaster
Wall
Feb 9, 2026 · Apt 5F
Open - Electric
Lighting
Feb 9, 2026 · Apt 5F
Open - Paint/plaster
Wall
Feb 9, 2026 · Apt 5F
Open - Plumbing
Toilet
Jan 31, 2026 · Apt 5B
Close - Water leak
Heavy flow
Jan 5, 2026 · Apt 2C
Close - Water leak
Heavy flow
Jan 5, 2026 · Apt 2C
Close - Water leak
Heavy flow
Nov 28, 2025 · Apt 7I
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 7I
Close - Electric
Power outage
Oct 20, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt 7I
Close - Door/window
Door
Oct 15, 2025 · Apt 7I
Close - Safety
Smoke detector
Oct 15, 2025 · Apt 7I
Close - Electric
Power outage
Sep 22, 2025 · Apt 4E
Close - Plumbing
Toilet
Sep 8, 2025 · Apt 5B
Close - Plumbing
Toilet
Sep 5, 2025 · Apt 5B
Close - Appliance
Electric/gas range
May 16, 2025 · Apt 4H
Close - Heat/hot water
Apartment only
May 16, 2025 · Apt 4H
Close - Heat/hot water
Apartment only
May 16, 2025 · Apt 4H
Close - Door/window
Door
Apr 4, 2025 · Apt 5A
Close - Door/window
Door
Apr 2, 2025 · Apt 5A
Close - Electric
Power outage
Feb 5, 2025 · Apt 6F
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 4F
Close - General
Cooking gas
Jan 24, 2025 · Apt 4F
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 2C
Close - Appliance
Electric/gas range
Jan 23, 2025 · Apt 2C
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Jan 22, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Nov 14, 2023 · Apt 3RR
Close - Unsanitary condition
Mold
Aug 31, 2023 · Apt 1G
Close - General
Mailbox
Apr 23, 2021 · Apt 2NDFL
Close - Electric
No lighting
Apr 23, 2021 · Apt 2NDFLO
Close - Electric
Wiring
Jan 26, 2021 · Apt 2NDFLO
Close - Electric
No lighting
Jan 26, 2021 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jan 26, 2021 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Dec 16, 2020 · Apt 1
Close - Heat/hot water
Apartment only
Nov 21, 2020 · Apt 2
Close - Heat/hot water
Apartment only
Jan 12, 2020 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2023
- Floors
- 7
- Residential units
- 55
- Building area
- 54,278 ft²
- Lot area
- 9,998 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 45
- Block / lot
- 5227 / 17
- Assessed value
- $4,594,050
- Landmark / historic district
- No
HPD registration #391065, last renewed Aug 27, 2025.
Questions about Foster Avenue
Who owns Foster Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1341-1351 Flatbush LLC.
Does Foster Avenue have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is Foster Avenue rent stabilized?
NYC Department of Finance tax bills listed 55 rent-stabilized units here in 2024 (about 100% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was Foster Avenue built?
City records list 2023 as the year it was built.
How many apartments are in Foster Avenue?
It has 55 residential units and 56 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.