573 East 22 Street
Brooklyn, NY 11226BBL 3-05222-0108Map
Owner of record: 573 East 22nd Realty LLC
573 East 22 Street is a walk-up apartment building built in 1931 in Brooklyn, 11226. It has 21 residential units across 4 floors. The owner of record is 573 East 22nd Realty LLC. HPD has recorded 361 housing violations here, most recently on January 24, 2026. 1 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.
- HPD violations
- 361
- DOB violations
- 14
- ECB violations
- 2
- HPD complaints
- 252
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 361
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jan 24, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at public hall at boiler room, 1st story
Jan 24, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jan 24, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jan 24, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st stack from north at west at fire escape, 2nd story
Nov 4, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective 4th concrete tread from the bottom at building front leading to fire passageway
May 27, 2025
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats droppings at fire passage way
May 13, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at building rear yard at public hall, 1st story
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt grd, 1st apartment from west at north
May 13, 2025 · Apt GRD
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt grd, 1st apartment from west at north
May 13, 2025 · Apt GRD
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective concrete at building rear yard at public hall, 3rd story
May 13, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of discarded refrigerator with door intact at public hall, 1st story
Mar 29, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 4, 2023
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods fire escape at south court at fire escape
May 25, 2022
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the 1st closet from west at north wall wall in the 1st room from north at west located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at fire escape in east court at fire escape
May 25, 2022
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at the sink in the kitchen located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 sq ft at the 1st closet from south at west wall ceiling in the foyer located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, 1st closet from south at west wall ceiling in the foyer located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling, 1st closet from south at west wall ceiling in the foyer located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at east located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the 1st room from north at east located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall in the 4th room from north located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the 1st closet from west at north wall wall in the 1st room from north at west located at bsmt-apt baseme, 1st bsmt-apt from west at north
May 25, 2022 · Apt BASEME
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycles and household items at public hall, 1st story
Jul 11, 2021
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 11, 2021
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Jul 11, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of bicycle, strollers and buckets under stairs at public hall, 1st story
Jul 2, 2021
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components on all balconies at south stack fire escape (front of building)
Jul 2, 2021
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components on all balconies at north stack fire escape (front of building)
Jul 2, 2021
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items on 2nd story balcony at north stack (front of building)
Jul 2, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 2, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile throughout in the kitchen located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate at heat riser in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser in the bathroom located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser in the 2nd room from north located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at raditor in the 2nd room from north located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at around raditor in the 2nd room from north located at apt 1b, 1st story, 2nd apartment from east at south
Feb 18, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall (approx. 4 sq ft) in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 13, 2021 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Feb 13, 2021 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Feb 13, 2021 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Feb 10, 2021 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east located at apt 4c, 4th story
Mar 1, 2020 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower window sash at south wall in the 4th room from east located at apt 4c, 4th story
Mar 1, 2020 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2b, 2nd story, 1st apartment from south at west
Dec 19, 2019 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective counter balance at lower window sash at south wall in the 1st room from east located at apt 4c, 4th story, 1st apartment from east at south
Nov 29, 2019 · Apt 4C
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 2
Work does not conform to approved construction documenst and/or approved amendments.premises under alt 2#321364750 loc folder noted;at time of inspection with amended (dng's)dateed 08/20/2018 found at cellar ad
Oct 17, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted;at time of inspection for application #321364750 observed at apartment #3e at kitchen ceiling an approximate 1'x1'x3.5" concrete slab over kitchen ref
Oct 17, 2018 · Penalty $625
Resolve
Complaints
- Unsanitary condition
Pests
Sep 11, 2026 · Apt BASEME
Open - Electric
Lighting
Jul 19, 2026 · Apt GARDEN
Open - Heat/hot water
Apartment only
Feb 17, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 14, 2026 · Apt 1C
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 1C
Close - Plumbing
Basin/sink
Nov 29, 2025 · Apt 1C
Close - Unsanitary condition
Pests
Nov 29, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 27, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 2, 2025 · Apt 1C
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 8, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Mar 27, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 18, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Jan 18, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 18, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Nov 2, 2023 · Apt 3A
Close - Plumbing
Radiator
Nov 2, 2023 · Apt 3A
Close - Safety
Smoke detector
Nov 2, 2023 · Apt 3A
Close - Plumbing
Bathtub/shower
Sep 12, 2022 · Apt 3A
Close - Door/window
Door
Sep 12, 2022 · Apt 3A
Close - Water leak
Heavy flow
May 21, 2022 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 21, 2022 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 21, 2022 · Apt B2
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - General
Cooking gas
Jul 10, 2021 · Apt 2A
Close - Electric
Power outage
Jul 10, 2021 · Apt 2A
Close - Unsanitary condition
Mold
Jun 30, 2021 · Apt 2A
Close - Paint/plaster
Ceiling
Jun 30, 2021 · Apt 2A
Close - Water leak
Heavy flow
Jun 30, 2021 · Apt 2A
Close - Heat/hot water
Apartment only
Mar 13, 2021 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 16, 2021 · Apt 1B
Close - Heat/hot water
Entire building
Feb 11, 2021 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 11, 2021 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 9, 2021 · Apt 2B
Close - Appliance
Refrigerator
Aug 11, 2020 · Apt 3A
Close - Appliance
Electric/gas range
Aug 11, 2020 · Apt 3A
Close - Flooring/stairs
Floor
Aug 11, 2020 · Apt 3A
Close - Heat/hot water
Apartment only
Mar 11, 2020 · Apt 4E
Close - Water leak
Heavy flow
Dec 14, 2019 · Apt 2B
Close - Plumbing
Steam pipe/riser
Dec 14, 2019 · Apt 2B
Close - General
Ventilation system
Dec 14, 2019 · Apt 2B
Close - Plumbing
Radiator
Dec 14, 2019 · Apt 2B
Close - Unsanitary condition
Mold
Dec 14, 2019 · Apt 2B
Close - Flooring/stairs
Floor
Nov 25, 2019 · Apt 4C
Close - Electric
Outlet/switch
Nov 25, 2019 · Apt 4C
Close - Water leak
Heavy flow
Mar 7, 2019 · Apt 3B
Close - Paint/plaster
Ceiling
Mar 7, 2019 · Apt 3B
Close - Heat/hot water
Apartment only
Feb 2, 2019 · Apt 2A
Close - Water leak
Heavy flow
Feb 2, 2019 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 21
- Building area
- 16,800 ft²
- Lot area
- 5,983 ft²
- Zoning
- R5B
- Community board
- 314
- Council district
- 45
- Block / lot
- 5222 / 108
- Assessed value
- $518,400
- Landmark / historic district
- No
HPD registration #300348, last renewed Aug 20, 2025.
Questions about 573 East 22 Street
Who owns 573 East 22 Street?
The owner of record in NYC Department of City Planning PLUTO data is 573 East 22nd Realty LLC.
Does 573 East 22 Street have violations?
Yes. NYC HPD has recorded 361 housing violations at this property.
Is 573 East 22 Street rent stabilized?
NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 100% of its 21 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 573 East 22 Street built?
City records list 1931 as the year it was built.
How many apartments are in 573 East 22 Street?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.