540 East 22 Street
Brooklyn, NY 11226BBL 3-05207-0030Map
Owner of record: Mansfield Realty Associates
540 East 22 Street is a walk-up apartment building built in 1935 in Brooklyn, 11226. It has 38 residential units across 4 floors. The owner of record is Mansfield Realty Associates. HPD has recorded 246 housing violations here, most recently on July 16, 2026. 15 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.
- HPD violations
- 246
- DOB violations
- 14
- ECB violations
- 0
- HPD complaints
- 333
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 246
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes solar panel at south exterior wall at fire escape
Jul 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at, bathtub waste line in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall , at sink base cabinet in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at, ceiling, west closet , in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective cracked ceramic,tiles at west wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at north located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft east wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door , east wall, in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked light fixture globe cover at ceiling in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperative in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective cracked wood at entrance door north wall in the 2nd room from east at south located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink west wall in the kitchen located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the hinges at laundry room , south section, west wall at public hall, 1st story
Feb 9, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retradant materials sheetrock ceiling and walls at ,compactor closet , south wall , south section, at public hall, 1st story
Feb 9, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials plaster at ceiling at, building ' s lobby , at public hall, 1st story
Feb 9, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at, upper sash window 1st from east at, south wall, at public hall at north , 2nd story
Feb 9, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of furniture at south wall ,north section, at public hall, 3rd story
Feb 9, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the bathroom , the 2nd room from east at south, the 1st room from east at north, the kitchen , the private hallway located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at upper sash window , 1st from east at south wall, south section, at public hall, 1st story
Feb 9, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperative in the entire apartment located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in at, bathtub , waste line in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective the locking devices at entrance door , east wall, in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - ANon-hazardous
Refit windows lower and upper sashes, at east wall, to make them airtight in the 1st room from east at south located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at, bathtub, north wall, in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at less 5han 10 sqft window frame from west at north wall in the 2nd room from east at north located at apt 1d, 1st story, 1st apartment from south at west , section ''north'' original violation 18632808 issued 09-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 9, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at , ceiling , building ' s lobby , at public hall, 1st story
Feb 9, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft east wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north'' original violation 18632807 issued 09-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 9, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sft ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north'' original violation 18632806 issued 09-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 9, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at eless than 10 sqft south wall in the bathroom located at apt 1d, 1st story, 1st apartment from south at west , section ''north'' original violation 18632803 issued 09-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 9, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at, less than 10,sqft , north window frame, in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east , section ''north'' original violation 18632795 issued 09-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 9, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the foyer located at apt 1d, 1st story, 1st apartment from south at west , section ''north''
Feb 9, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective cracked marble door saddle at, entrance door , west wall, in the foyer located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked plaster at ceilig at west closet in the private hallway located at apt 3b, 3rd story, 1st apartment from north at east , section ''north''
Feb 9, 2026 · Apt 3B
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 4 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Oct 13, 2026 · Apt 2H
Open - Unsanitary condition
Pests
Oct 11, 2026 · Apt A4
Open - Safety
Fire escape
Jul 15, 2026 · Apt BLDG
Close - Safety
Fire escape
Jul 14, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Feb 10, 2026 · Apt 4E
Close - Plumbing
Water supply
Feb 8, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1D
Close - Paint/plaster
Wall
Feb 3, 2026 · Apt 3B
Close - Paint/plaster
Wall
Feb 3, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Feb 3, 2026 · Apt 3B
Close
Show 40 more ↓
- Plumbing
Toilet
Feb 3, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Feb 3, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jan 30, 2026 · Apt 3B
Close - Plumbing
Toilet
Jan 30, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Jan 30, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
Jan 30, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt E7
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 3H
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 1D
Close - Door/window
Door
Nov 15, 2025 · Apt 4F
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 1D
Close - Heat/hot water
Entire building
Nov 8, 2025 · Apt 1G
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt 3E
Close - General
Cabinet
Oct 1, 2025 · Apt 2H
Close - Flooring/stairs
Floor
Oct 1, 2025 · Apt 2H
Close - Unsanitary condition
Mold
Oct 1, 2025 · Apt 2H
Close - Water leak
Heavy flow
Oct 1, 2025 · Apt 2H
Close - Flooring/stairs
Floor
Sep 19, 2025 · Apt 2H
Close - General
Cabinet
Sep 19, 2025 · Apt 2H
Close - Unsanitary condition
Mold
Sep 19, 2025 · Apt 2H
Close - Water leak
Heavy flow
Sep 19, 2025 · Apt 2H
Close - Flooring/stairs
Floor
Aug 5, 2025 · Apt 2H
Close - Water leak
Heavy flow
Aug 5, 2025 · Apt 2H
Close - General
Cabinet
Aug 5, 2025 · Apt 2H
Close - Plumbing
Bathtub/shower
Jul 25, 2025 · Apt 3B
Close - Flooring/stairs
Floor
Jul 25, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 12, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Jan 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 3A
Close - Plumbing
Water supply
Jan 2, 2025 · Apt 3A
Close - General
Cabinet
Jan 2, 2025 · Apt 3A
Close - Plumbing
Water supply
Dec 19, 2024 · Apt 3A
Close - General
Cabinet
Dec 19, 2024 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1935
- Floors
- 4
- Residential units
- 38
- Building area
- 38,800 ft²
- Lot area
- 14,412 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5207 / 30
- Assessed value
- $855,900
- Landmark / historic district
- No
HPD registration #314908, last renewed Nov 19, 2025.
Questions about 540 East 22 Street
Who owns 540 East 22 Street?
The owner of record in NYC Department of City Planning PLUTO data is Mansfield Realty Associates.
Does 540 East 22 Street have violations?
Yes. NYC HPD has recorded 246 housing violations at this property.
Is 540 East 22 Street rent stabilized?
NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 100% of its 38 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 540 East 22 Street built?
City records list 1935 as the year it was built.
How many apartments are in 540 East 22 Street?
It has 38 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.