2132 Beverley Road
Brooklyn, NY 11226BBL 3-05165-0001Map
Owner of record: 2132 Beverly Road LLC
2132 Beverley Road is a mixed residential and retail building built in 1910 in Brooklyn, 11226. It has 6 residential units across 4 floors. The owner of record is 2132 Beverly Road LLC. HPD has recorded 350 housing violations here, most recently on May 4, 2026. 34 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 350
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 437
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 350
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall, 3rd window frame from west at north wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from east at south located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from south at west wall in the foyer located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st closet from south at west wall door, ceiling in the 3rd room from east at south located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 2nd window frame from north at east wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from east at south wall, 1st closet from south at west wall door frame, 1st closet from south at west wall door in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, 1st closet from south at west wall door, ceiling in the 3rd room from east at south located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall, ceiling in the foyer located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 3rd room from east at south located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3r, 3rd story, 1st apartment from north at east
May 4, 2026 · Apt 3R
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical light fixtures at ceiling at public hall
Nov 2, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door
Sep 28, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 28, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 28, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 28, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 28, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at building front at fire escape, 2nd story
May 28, 2025
Closed — Violation closed - BHazardous
Provide metal screen at skylight at public hall, 4th story
Mar 27, 2025
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Mar 27, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at west wall in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall and ceiling in the bathroom located at apt 4r, 4th story, 1st apartment from north at east
Jan 15, 2025 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective cracked wired glass at, skylight above stair leading to , roof bulkhead , at public hall, 4th story
Jan 15, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing glass, at transom , above entrance door to building at public hall, 1st story
Jan 15, 2025
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east at north located at apt 3f, 3rd story, 1st apartment from south at west
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
ECB violations · 2
- Class - 3
Failure to maintain: at left side yard observed 1 white sedan in stateof disrepair and 1 other car stored in side yard at time of inspection. remedy: maintain/or/replace.
Dec 17, 2024 · Penalty $500
Active - Class - 3
Observed a white toyota with california lic plates 6ncs524 illegally parked at the buildings exp 2, no curb cut & osp maintained without dob approval & contrary to zr 25-62 vehicle crossing the sidewalk curb cr
Apr 16, 2021
Resolve
Complaints
- Door/window
Window pane
May 1, 2026 · Apt BLDG
Close - Outside building
Skylight
May 1, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 28, 2026 · Apt 3R
Close - Unsanitary condition
Pests
Apr 28, 2026 · Apt 3R
Close - Unsanitary condition
Mold
Apr 28, 2026 · Apt 3R
Close - Door/window
Door
Apr 28, 2026 · Apt 3R
Close - Door/window
Door
Apr 28, 2026 · Apt 3R
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 4R
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Electric
No lighting
Dec 27, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 18, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 3F
Close - Electric
Power outage
Nov 2, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 3F
Close - Electric
Power outage
Oct 9, 2025 · Apt BLDG
Close - Paint/plaster
Wall
May 7, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Feb 17, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jan 20, 2025 · Apt 3F
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - General
Signage missing
Jan 16, 2025 · Apt BLDG
Close - Door/window
Door
Jan 16, 2025 · Apt 4R
Close - Outside building
Skylight
Jan 16, 2025 · Apt BLDG
Close - Outside building
Roof door/hatch
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 15, 2025 · Apt 4L
Close - Unsanitary condition
Pests
Jan 15, 2025 · Apt 4L
Close - Door/window
Door
Jan 15, 2025 · Apt 4L
Close - Unsanitary condition
Pests
Jan 15, 2025 · Apt 2F
Close - Door/window
Door
Jan 15, 2025 · Apt 2F
Close - Plumbing
Water supply
Jan 15, 2025 · Apt 2F
Close - Unsanitary condition
Mold
Jan 15, 2025 · Apt 4R
Close - Plumbing
Water supply
Jan 15, 2025 · Apt 4R
Close - Plumbing
Water supply
Jan 15, 2025 · Apt 4R
Close - Door/window
Door
Jan 15, 2025 · Apt 4L
Close - Safety
Smoke detector
Jan 15, 2025 · Apt 4L
Close - Safety
Carbon monoxide detector
Jan 15, 2025 · Apt 4L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1910
- Floors
- 4
- Residential units
- 6
- Building area
- 9,612 ft²
- Lot area
- 3,004 ft²
- Zoning
- C4-4A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5165 / 1
- Assessed value
- $615,150
- Landmark / historic district
- No
HPD registration #370611, last renewed Sep 19, 2025.
Questions about 2132 Beverley Road
Who owns 2132 Beverley Road?
The owner of record in NYC Department of City Planning PLUTO data is 2132 Beverly Road LLC.
Does 2132 Beverley Road have violations?
Yes. NYC HPD has recorded 350 housing violations at this property.
Is 2132 Beverley Road rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2132 Beverley Road built?
City records list 1910 as the year it was built.
How many apartments are in 2132 Beverley Road?
It has 6 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.