385 Argyle Road
Brooklyn, NY 11218BBL 3-05156-0058Map
Owner of record: 385 Argyle Road Owners Corp
385 Argyle Road is an elevator apartment building built in 1941 in Brooklyn, 11218. It has 60 residential units across 6 floors. The owner of record is 385 Argyle Road Owners Corp. HPD has recorded 80 housing violations here, most recently on October 7, 2026. 48 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 80
- DOB violations
- 16
- ECB violations
- 1
- HPD complaints
- 136
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 80
- BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling at public hall, 5th story
Oct 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at east located at apt 4g, 4th story, 4th apartment from south at west
Oct 7, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at east located at apt 4g, 4th story, 4th apartment from south at west
Oct 7, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4j, 4th story, 2nd apartment from north at east
Jan 28, 2026 · Apt 4J
Open — Nov sent out - BHazardous
Refit upper and lower window sash at west in the 1st room from east at north located at apt 6h, 6th story, 1st apartment from north at east
Dec 22, 2025 · Apt 6H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around window at north in the foyer located at apt 6h, 6th story, 1st apartment from north at east
Dec 22, 2025 · Apt 6H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent plaster at bulkhead ceiling at public hall
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at bulkhead ceiling at public hall
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6h, 6th story, 1st apartment from north at east
Nov 15, 2023 · Apt 6H
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Nov 15, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 3g, 3rd story, 5th apartment from south at west
Nov 13, 2023 · Apt 3G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel surface by method of reglazzing in the bathroom located at apt 1f, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1f, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west
Jun 22, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglazing of bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from south at west
Jan 10, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Replace with new the broken or defective rubber gasket at refrigerator doors in the kitchen located at apt 1f, 1st story, 1st apartment from south at west
Jan 10, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1f, 1st story, 1st apartment from south at west
Jan 10, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective base cabinet counter tub in the kitchen located at apt 1f, 1st story, 1st apartment from south at west
Jan 10, 2022 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective door handles in the entrance located at apt 1f, 1st story, 1st apartment from south at west
Jan 10, 2022 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair the broken or defective (inoperative) light switch on the east wall. in the foyer located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair the broken or defective ( inoperative ) light switch on the east wall in the 2nd room from east at south located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective door latch of the closet at south. in the 2nd room from east at south located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - BHazardous
Replace with new the missing cover at the electrical outlet on the south wall in the 2nd room from east at south located at apt 4d, 4th story, 2nd apartment from south at west
Jul 21, 2021 · Apt 4D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east at north located at apt 4f, 4th story, 2nd apartment from south at west , section ''e-j'', at north
Mar 18, 2021 · Apt 4F
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Mar 18, 2021
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section ''e-j'', at north
Mar 18, 2021 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile at shower stall in the bathroom located at apt 3g, 3rd story, 5th apartment from south at west
Feb 11, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wastline bathtub in the bathroom located at apt 3g, 3rd story, 5th apartment from south at west
Feb 11, 2020 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
May 3, 2019
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
May 3, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story
May 3, 2019
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood cabinet at north wall and wood base cabinet at east wall in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - ANon-hazardous
Replace with new the missing five wood knobs at drawers and doors at wood base cabinet at east wall in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash counter balances at window in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash counter balances at 1st window from south at west wall in the 1st room from east at north located at apt 4d, 4th story, 1st apartment from south at west
Jun 7, 2015 · Apt 4D
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balances at lower and upper sashes all windows in the entire apartment located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering vinyl tiles in the kitchen located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline for washbasin in the bathroom located at apt 4h, 4th story, 1st apartment from north at east
Sep 22, 2012 · Apt 4H
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4h, 4th story, 1st apartment from north at east
Sep 19, 2012 · Apt 4H
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 4h, 4th story, 1st apartment from north at east
Sep 19, 2012 · Apt 4H
Open — Nov sent out
DOB building violations · 16
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2007
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatorrequired
3p3257
Dec 11, 1998
Dob violation - resolved
ECB violations · 1
- Class - 1
Work without permit; observed apt 4f electrical work without permit. new service panel installed,with new bx cable and receptacles installed throughout apartment work approx 50% complete. no permits on file as
Oct 16, 2023 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Heat/hot water
Apartment only
Oct 18, 2026 · Apt 6H
Close - Water leak
Heavy flow
Sep 29, 2026 · Apt 4G
Close - Plumbing
Toilet
Aug 18, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 6H
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 6H
Close - Door/window
Window frame
Jan 16, 2026 · Apt 6H
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 5, 2026 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 31, 2025 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt 6H
Close - Heat/hot water
Apartment only
Nov 21, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 8, 2025 · Apt 6H
Close - Heat/hot water
Apartment only
Dec 11, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Dec 7, 2024 · Apt 3G
Close - Heat/hot water
Apartment only
Nov 27, 2024 · Apt 6H
Close - Heat/hot water
Apartment only
Nov 25, 2024 · Apt 3G
Close - Heat/hot water
Apartment only
Nov 12, 2024 · Apt 6H
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 27, 2024 · Apt 4K
Close - Heat/hot water
Entire building
Dec 16, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 15, 2023 · Apt 6H
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 6H
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 6H
Close - Heat/hot water
Apartment only
Nov 11, 2023 · Apt 3G
Close - Heat/hot water
Apartment only
Oct 19, 2023 · Apt 3G
Close - Heat/hot water
Entire building
Dec 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 1, 2022 · Apt 6F
Close - Unsanitary condition
Mold
Jun 15, 2022 · Apt 1S
Close - Plumbing
Toilet
Jun 15, 2022 · Apt 1S
Close - Heat/hot water
Entire building
Jan 26, 2022 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 25, 2022 · Apt 1F
Close - Appliance
Refrigerator
Dec 9, 2021 · Apt 1F
Close - Paint/plaster
Wall
Dec 9, 2021 · Apt 1F
Close - General
Cabinet
Dec 9, 2021 · Apt 1F
Close - Flooring/stairs
Floor
Dec 9, 2021 · Apt 1F
Close - Plumbing
Bathtub/shower
Dec 9, 2021 · Apt 1F
Close - General
Cooking gas
Nov 22, 2021 · Apt 4D
Close - Paint/plaster
Wall
Nov 10, 2021 · Apt 4D
Close - Electric
Outlet/switch
Nov 10, 2021 · Apt 4D
Close - Paint/plaster
Ceiling
Nov 10, 2021 · Apt 4D
Close - Door/window
Window frame
Nov 10, 2021 · Apt 4D
Close - Appliance
Electric/gas range
Nov 10, 2021 · Apt 4D
Close - Paint/plaster
Ceiling
Jul 17, 2021 · Apt 4D
Close - Electric
No lighting
Jul 17, 2021 · Apt 4D
Close - Appliance
Electric/gas range
Jul 17, 2021 · Apt 4D
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 16, 2026 | $571,489 | Coops - elevator apartments | — |
| Aug 19, 2026 | $585,000 | Coops - elevator apartments | — |
| Jul 13, 2026 | $1,070,000 | Coops - elevator apartments | — |
| Apr 16, 2026 | $430,000 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Jan 22, 2026 | $2,421,358 | Coops - elevator apartments | — |
| Dec 10, 2025 | $630,000 | Coops - elevator apartments | — |
| Oct 1, 2025 | $615,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1941
- Floors
- 6
- Residential units
- 60
- Building area
- 59,640 ft²
- Lot area
- 16,000 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5156 / 58
- Assessed value
- $1,816,200
- Landmark / historic district
- No
HPD registration #334194, last renewed Oct 1, 2025.
Questions about 385 Argyle Road
Who owns 385 Argyle Road?
The owner of record in NYC Department of City Planning PLUTO data is 385 Argyle Road Owners Corp.
Does 385 Argyle Road have violations?
Yes. NYC HPD has recorded 80 housing violations at this property.
Is 385 Argyle Road rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 20% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 385 Argyle Road built?
City records list 1941 as the year it was built.
How many apartments are in 385 Argyle Road?
It has 60 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.