933 Rogers Avenue
Brooklyn, NY 11226BBL 3-05129-0041Map
Owner of record: Rogers Em LLC
933 Rogers Avenue is an elevator apartment building built in 2019 in Brooklyn, 11226. It has 32 residential units across 7 floors. The owner of record is Rogers Em LLC. HPD has recorded 29 housing violations here, most recently on August 1, 2026. 4 of the 29 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 29
- DOB violations
- 6
- ECB violations
- 16
- HPD complaints
- 46
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Aug 1, 2026 · Apt 2D
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling in the 1st room from north located at apt 2d, 2nd story, 1st apartment from north at east
Aug 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Aug 1, 2026 · Apt 2D
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Jul 5, 2026 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Jul 5, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
May 5, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
May 5, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
May 5, 2026 · Apt 2C
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 2nd apartment from south at west
Jun 17, 2025 · Apt 6B
Closed — Violation dismissed
Show 19 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
Properly secure the loose wood skirting at base cabinet at sink in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 4, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 4, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Nov 4, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Nov 4, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 4, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2019
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2015
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall behind water closet in the bathroom located at apt 1, 1st story, apartment at north
Apr 14, 2014 · Apt 1
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 1, 1st story, apartment at north
Apr 14, 2014 · Apt 1
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 1, 1st story, apartment at north
Apr 14, 2014 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, apartment at north
Apr 14, 2014 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story, apartment at north
Apr 14, 2014 · Apt 1
Closed — Violation closed
DOB building violations · 6
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner stop work order/boro. comm. has ordered all work stopped under permit#321849489 due to construction superintendent withdrawal/stop all work except to make site safe
Jul 27, 2020
Dob violation - dismissed - Construction other optional
Borough comm. swo/borough comm. has oredered all work stoped under per mit#321849489 due to construction superintendent withdrawal/ stop all work/except to make site safe
Jul 27, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 23, 2020
Dob violation - dismissed - Construction other optional
Emergency work order observed plastic yodock barriers occupying roadwa y not properly connected or secured and not filled witrh sand/water to weight them down as per man.spec
Apr 13, 2020
Dob violation - dismissed
ECB violations · 16
- Class - 2
Misalinged cab mirror. inopertive pphone. replace worn gibs where needed. maintenance log not up to date.. provide code compliant sign indicating location of machine room.
Mar 23, 2026 · Penalty $625
Active - Class - 2
Repair in-car emergency phone., remove noise from hoist machine., service and tag motor room fire extinguisher., adjust hoistway door release assemblys in the basement & roof (after using emergency door key the
Mar 13, 2024 · Penalty $655
Resolve - Class - 1
28-401.4 illegally engaging in any biz or occupation w/o required license or other authorization note:@time of my insp i observed active const [email protected] researching bis it appeared gc registration l
Feb 8, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to file evidence of compliance w/ workers comp law &/or disability law.note:@time of my [email protected] const site(approx20workers onsite) upon researching bis i observed gc617339 disability ins
Feb 8, 2021 · Penalty $5,000
Resolve - Class - 1
Working contrary to stop work order. at the time of my inspection of an active jobsite i observed workers on boom truck w/paint bucket & workers inside the jobsite. swo was issued on 7/21/20 by badge #2874 & vi
Jul 22, 2020 · Penalty $5,000
Resolve - Class - 1
3307.6.4.2.2-storage on sidewlak shed noted no item shall be stored or place upon a sidewalk shed designatedas light duty sidewlak shed and or section 3307.6.4.2. at time of my inspection observed as the si
Jul 21, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3301.13.12-competent person note: at time of my inspection i observed four workers about to clean themself after trying to gain access for more than 10 minutes on (asking) who is in charge i was informed
Jul 21, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping as per section requirements. at time of inspection observed at exposure's 1,2,3,4 facade work where workers are shaving styrofoam where particulates have gone airborne
Jun 2, 2020 · Penalty $3,125
Resolve - Class - 1
Pswo for supported scaffold & needle beams work does not conform to approved construction documents. noted: at time of inspection plans for needle beams. do not show spacing of beams but show 5 doubles there
Apr 22, 2020 · Penalty $2,500
Resolve - Class - 1
Sec. 3314.1 pswo supported scaffold/needle beams. scaffold does not meet code specifications. noted: at time of inspection worker on scaffold no pre-shift inspection scaffold missing guardrail system,pins,not
Apr 22, 2020 · Penalty $2,500
Resolve
Show 6 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirements. observed in courtyard of the new constructed bldg collected pile of construction debris material & garbage. all garbage mixed & thrown down
Feb 11, 2020 · Penalty $625
Resolve - Class - 1
Bc 3309.1 failure to protect private property at exposure#4. at the time of inspection of 7 story new building currently at roof level active job site. observed exterior work incompleted and work men on the 7th
Jan 30, 2020 · Penalty $625
Resolve - Class - 2
Missing fence. at the time of inspection of 7 story new building active job site. observed some workers in job site. i also observed missingfence at exposure#4 between the adjacent property. the site safety pla
Jan 30, 2020
Resolve - Class - 2
3301.13.12-competent person teh construction superintendent must deigsnate a competent persosn for each jobsite for which the construction superintendnet is responsible and ensure each competent person is prese
Dec 30, 2019 · Penalty $625
Resolve - Class - 2
Work w/o a permit(construction plywood fence permit expired)as noted:at time of inspection,construction site was closed.observed const.plywood fence permit has expired on 5/15/19 permit#b00047121-11-fn.rem:comp
Jun 5, 2019
Resolve - Class - 2
3309.9 failure to protect adjoining property. demo operation exposed adjoining wall at exposure#2 no waterproofing in place-entire length ofexisting building at 931 rogers ave. stop all work except to provide p
May 21, 2019 · Penalty $625
Resolve
Complaints
- Door/window
Window frame
Oct 18, 2026 · Apt 5C
Open - Unsanitary condition
Mold
Jul 29, 2026 · Apt 2D
Close - Plumbing
Water supply
Jul 4, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 30, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Apr 30, 2026 · Apt 2C
Close - Paint/plaster
Wall
Apr 30, 2026 · Apt 2C
Close - Appliance
Electric/gas range
Apr 22, 2026 · Apt 2C
Close - Appliance
Electric/gas range
Apr 22, 2026 · Apt 2C
Close - Appliance
Electric/gas range
Dec 2, 2025 · Apt 6B
Close - General
Bell/buzzer/intercom
Sep 21, 2025 · Apt 2A
Close
Show 36 more ↓
- Appliance
Electric/gas range
Jun 20, 2025 · Apt 6B
Close - Unsanitary condition
Pests
Jun 13, 2025 · Apt 6B
Close - Unsanitary condition
Pests
Jun 13, 2025 · Apt 6B
Close - Plumbing
Basin/sink
Jun 13, 2025 · Apt 6B
Close - Appliance
Refrigerator
Apr 29, 2025 · Apt 2C
Close - Appliance
Electric/gas range
Apr 29, 2025 · Apt 2C
Close - Appliance
Electric/gas range
Dec 16, 2024 · Apt 5C
Close - Paint/plaster
Window/frame
Dec 8, 2024 · Apt 6B
Close - Door/window
Window frame
Dec 8, 2024 · Apt 6B
Close - Unsanitary condition
Garbage/recycling storage
Dec 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Nov 24, 2024 · Apt 5C
Close - Unsanitary condition
Mold
Oct 19, 2024 · Apt 2D
Close - Plumbing
Bathtub/shower
Oct 19, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Aug 25, 2024 · Apt 5A
Close - Unsanitary condition
Pests
Apr 3, 2024 · Apt 7B
Close - General
Cooking gas
Apr 3, 2024 · Apt 7B
Close - Flooring/stairs
Floor
Apr 3, 2024 · Apt 7B
Close - Door/window
Window frame
Nov 13, 2023 · Apt 5C
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Plumbing
Water supply
Feb 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 12, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2017 · Apt 1
Close - Unsanitary condition
Pests
May 13, 2015 · Apt 1
Close - Heat/hot water
Apartment only
Apr 10, 2014 · Apt 1
Close - Plumbing
Steam pipe/riser
Apr 10, 2014 · Apt 1
Close - General
Ventilation system
Apr 10, 2014 · Apt 1
Close - Paint/plaster
Wall
Apr 10, 2014 · Apt 1
Close - Plumbing
Basin/sink
Apr 10, 2014 · Apt 1
Close - Plumbing
Water-leaks
Aug 27, 2008 · Apt 1FL
Close - Electric
Lighting
Aug 27, 2008 · Apt 1FL
Close - Electric
Wiring
Aug 27, 2008 · Apt 1FL
Close - Appliance
Electric/gas range
May 18, 2005 · Apt 1L
Close - Appliance
Electric/gas range
May 18, 2005 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2019
- Floors
- 7
- Residential units
- 32
- Building area
- 25,120 ft²
- Lot area
- 6,361 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 40
- Block / lot
- 5129 / 41
- Assessed value
- $2,416,950
- Landmark / historic district
- No
HPD registration #389689, last renewed Sep 16, 2025.
Questions about 933 Rogers Avenue
Who owns 933 Rogers Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Rogers Em LLC.
Does 933 Rogers Avenue have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 933 Rogers Avenue rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 34% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 933 Rogers Avenue built?
City records list 2019 as the year it was built.
How many apartments are in 933 Rogers Avenue?
It has 32 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.