roofy

2112 Regent Place

Brooklyn, NY 11226BBL 3-05125-0048Map

Owner of record: Brooklyn Park Terrace LLC

2112 Regent Place is a walk-up apartment building built in 1906 in Brooklyn, 11226. It has 6 residential units across 3 floors. The owner of record is Brooklyn Park Terrace LLC. HPD has recorded 166 housing violations here, most recently on September 18, 2025. 5 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.

HPD violations
166
DOB violations
7
ECB violations
2
HPD complaints
213

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 18, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
8
About 100% of the building's 6 apartments
Up from 6 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 166

  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 1e, 1st story, 1st apartment from south at west

    Sep 18, 2025 · Apt 1E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 6th room from north located at apt 1e, 1st story, 1st apartment from south at west

    Sep 18, 2025 · Apt 1E

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 1st bathroom from north located at apt 1b, 1st story, 1st apartment from west at north

    Jul 9, 2024 · Apt 1B

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 1st bathroom from north located at apt 1b, 1st story, 1st apartment from west at north original violation 17120282 issued 09-jul-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jul 9, 2024 · Apt 1B

    Open — Defect letter issued
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st bathroom from north located at apt 1b, 1st story, 1st apartment from west at north

    Jul 9, 2024 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1b, 1st story, 1st apartment from west at north

    Jul 9, 2024 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair the broken or defective bell buzzer intercom system at public hall, 1st story

    Sep 23, 2021

    Closed — Violation closed
  • B

    Properly repair the broken or defective sash lock at fire escape window in the 5th room from north located at apt 1a, 1st story, 1st apartment from north at east

    Oct 27, 2020 · Apt 1A

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 1a, 1st story, 1st apartment from north at east

    Apr 3, 2019 · Apt 1A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from north at east

    Apr 3, 2019 · Apt 1A

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1a, 1st story, 1st apartment from north at east

    Apr 3, 2019 · Apt 1A

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors at front entrance located at apt 3b, 3rd story, 1st apartment from south at west

    Jan 30, 2019 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 3b, 3rd story, 1st apartment from south at west

    Jan 30, 2019 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3b, 3rd story, 1st apartment from south at west

    Jan 30, 2019 · Apt 3B

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling . approx 3sq ft in the 4th room from north located at apt 1b, 1st story, 1st apartment from south at west

    Aug 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Aug 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Aug 13, 2018 · Apt 1B

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceilings and all walls in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Aug 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ..flower pots at 2nd story balcony at 1st fire escape from east at north

    Jul 25, 2018

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 3a, 3rd story, 1st apartment from east at south

    Apr 24, 2018 · Apt 3A

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 3a, 3rd story, 1st apartment from east at south

    Apr 24, 2018 · Apt 3A

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 1b, 1st story, 1st apartment from south at west

    Apr 24, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance at lower sash window at south wall in the 1st living room from north at east located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 18, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south

    Apr 18, 2018 · Apt 2A

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items on 3rd story balcony, building front at fire escape

    Apr 12, 2018

    Closed — Violation closed
  • A

    Refit door at building entrance

    Apr 12, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at vestibule , 1st story, section at west

    Apr 12, 2018

    Closed — Violation closed
  • B

    Properly repair the broken or defective inoperable upper and lower sash at window in the 3rd room from north at east located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north at east located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at south and east walls in the bathroom located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • B

    Replace with new the broken or defective sink base cabinet in the kitchen located at apt 2a, 2nd story, 1st apartment from east at south

    Feb 2, 2018 · Apt 2A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system lock on door at boiler room, 1st story

    Jan 5, 2018

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Jan 5, 2018 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • B

    Remove the illegal fastening consisting of key operated lock at door of room leading to fire escape in the 5th room from north located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the stairs and landing of entrance at building front at cellar

    Sep 18, 2017

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood flooring in the private hallway located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the nuisance consisting of mold ... at east wall. approx. 1 square feet in the bathroom located at apt 1a, 1st story, 1st apartment from north at east

    Sep 18, 2017 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counterbalance at lower window sash in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from west at north

    Jul 24, 2017 · Apt 2B

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 1b, 1st story, 1st apartment from south at west

    May 2, 2017 · Apt 1B

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    May 2, 2017 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Apr 29, 2017 · Apt 1B

    Closed — Violation closed

DOB building violations · 7

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 2

  • Hazardous

    Failure to maintain. excessive erosion of mortar on rear walls of bldg. remedy: make all necessary repairs to the satisfaction of this dept.

    Jan 30, 1990

    Resolve
  • Hazardous

    Failure to maintain broken, loose missing coping on parapet walls of bldg. remedy: make necessary repairs to the satisfaction of this dept.

    Jan 30, 1990

    Resolve

Complaints

  • Door/window

    Window frame

    Sep 15, 2025 · Apt 1E

    Close
  • Safety

    Window guard broken/missing

    Sep 15, 2025 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2025 · Apt 1E

    Close
  • Door/window

    Door

    Sep 15, 2025 · Apt 1E

    Close
  • Electric

    Outlet/switch

    Jan 1, 2024 · Apt 1E

    Close
  • Door/window

    Window frame

    Jan 1, 2024 · Apt 1E

    Close
  • Unsanitary condition

    Mold

    Jan 1, 2024 · Apt 1E

    Close
  • General

    Bell/buzzer/intercom

    Sep 17, 2021 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2021 · Apt 1A

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Jan 21, 2021 · Apt 1A

    Close
  • Door/window

    Door

    Jan 21, 2021 · Apt 1A

    Close
  • Water leak

    Slow leak

    Jan 21, 2021 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2021 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jan 2, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jan 2, 2021 · Apt 1A

    Close
  • Water leak

    Slow leak

    Jan 2, 2021 · Apt 1A

    Close
  • Door/window

    Door

    Dec 21, 2020 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Dec 21, 2020 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Dec 21, 2020 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Oct 23, 2020 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2020 · Apt 1A

    Close
  • Door/window

    Window frame

    Oct 23, 2020 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 12, 2020 · Apt 1A

    Close
  • Door/window

    Door

    Feb 12, 2020 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Dec 18, 2019 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Oct 23, 2019 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Oct 15, 2019 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Oct 15, 2019 · Apt 1A

    Close
  • Appliance

    Electric/gas range

    Jul 30, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 24, 2019 · Apt 1A

    Close
  • Water leak

    Slow leak

    Mar 26, 2019 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Mar 26, 2019 · Apt 1A

    Close
  • Door/window

    Window frame

    Mar 26, 2019 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Mar 26, 2019 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2018 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2018 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Aug 4, 2018 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Aug 4, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2018 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jul 11, 2018 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 11, 2018 · Apt 1A

    Close
  • Appliance

    Refrigerator

    Jul 11, 2018 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Jul 11, 2018 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    Jul 11, 2018 · Apt 1A

    Close
  • Water leak

    Slow leak

    May 21, 2018 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    May 21, 2018 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    May 21, 2018 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1906
Floors
3
Residential units
6
Building area
6,318 ft²
Lot area
2,700 ft²
Zoning
R6A
Community board
314
Council district
40
Block / lot
5125 / 48
Assessed value
$417,600
Landmark / historic district
No

HPD registration #347164, last renewed Aug 25, 2025.

Questions about 2112 Regent Place

Who owns 2112 Regent Place?

The owner of record in NYC Department of City Planning PLUTO data is Brooklyn Park Terrace LLC.

Does 2112 Regent Place have violations?

Yes. NYC HPD has recorded 166 housing violations at this property.

Is 2112 Regent Place rent stabilized?

NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2112 Regent Place built?

City records list 1906 as the year it was built.

How many apartments are in 2112 Regent Place?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.