roofy

220 East 18 Street

Brooklyn, NY 11226BBL 3-05121-0018Map

Owner of record: Drenis Enterprises, LLC

220 East 18 Street is an elevator apartment building built in 1926 in Brooklyn, 11226. It has 100 residential units across 6 floors. The owner of record is Drenis Enterprises, LLC. HPD has recorded 242 housing violations here, most recently on December 15, 2025. City tax records listed 100 rent-stabilized apartments here in 2024.

HPD violations
242
DOB violations
58
ECB violations
18
HPD complaints
425

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Dec 15, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
100
About 100% of the building's 100 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 242

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood base under sink at cabinet in the kitchen located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • C

    Repair the broken or defective connection at wasteline at sink in the kitchen located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet continously running water in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective reglaze surface at bathtub in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the visible mold condition... (greater than 30 sq ft) on ceiling in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective marble saddle at door frame in the bathroom located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Replace with new the missing light fixture at ceiling in the 1st room from east at south located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the 1st room from east at south located at apt l3, 3rd story, 5th apartment from south at west

    Dec 15, 2025 · Apt L3

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, ceiling in the foyer located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at south wall in the foyer located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 1st room from east located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the foyer located at apt 4l, 4th story, 2nd apartment from south at west

    Mar 22, 2025 · Apt 4L

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at apt 1d, 1st story, 3rd apartment from south at west

    Mar 12, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 1d, 1st story, 3rd apartment from south at west

    Mar 12, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) at west wall, 1st window frame from south at west wall in the bathroom located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom , the foyer located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Feb 7, 2025 · Apt 2B

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3q, 3rd story, 4th apartment from north at east

    Feb 7, 2025 · Apt 3Q

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4p, 4th story, 3rd apartment from north at east

    Feb 7, 2025 · Apt 4P

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4o, 4th story, 2nd apartment from north at east

    Feb 7, 2025 · Apt 4O

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4j, 4th story, 2nd apartment from east at south

    Feb 7, 2025 · Apt 4J

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4c, 4th story, 2nd apartment from south at west

    Feb 7, 2025 · Apt 4C

    Closed — Violation closed
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5d, 5th story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 5D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the kitchen located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective outer glass pane at upper sash at window at north wall in the 3rd room from north at east located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the kitchen located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, north wall in the kitchen located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt 1d, 1st story, 3rd apartment from south at west

    Feb 7, 2025 · Apt 1D

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... (less than 10 sq ft) at west wall, window frame from south at west wall in the bathroom located at apt 1d, 1st story, 3rd apartment from south at west original violation 17685442 issued 07-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Feb 7, 2025 · Apt 1D

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items attached to shoe, 3rd stack from south, building front. at fire escape

    Oct 30, 2024

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door to boiler room at boiler room, 1st story

    Oct 8, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6d, 6th story, 3rd apartment from south at west

    Oct 8, 2024 · Apt 6D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 3rd apartment from south at west

    Oct 8, 2024 · Apt 6D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 6n, 6th story, 1st apartment from north at east

    Jul 23, 2024 · Apt 6N

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 6n, 6th story, 1st apartment from north at east

    Jul 23, 2024 · Apt 6N

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor tiles in the 2nd room from north located at apt 6n, 6th story, 1st apartment from north at east

    Jul 23, 2024 · Apt 6N

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 6n, 6th story, 1st apartment from north at east

    Jul 23, 2024 · Apt 6N

    Closed — Violation closed

DOB building violations · 58

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2022

    Apr 22, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2019

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2014

    Dob violation - resolved
Show 40 more ↓
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 20, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    .......................n

    Mar 20, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 20, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    3p1037

    Mar 15, 2001

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p1037

    Feb 3, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    3p1038

    Feb 3, 2000

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p1037

    Dec 9, 1998

    Dob violation - resolved
  • Elevator elevatorrequired

    3p1038

    Dec 9, 1998

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 1994

    Vp*-violation unserved ecb- dismissed

ECB violations · 18

  • Class - 1

    Cease use 620.61 'a' by pass over current device fr1 fuse on contriller wire jump out critical safety circuit fuse..

    May 20, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Release carrier untagged, provide explicitly datailed info on how/where to obtain immediate, 24/7 entry to machine room and overhead

    Oct 3, 2018

    Resolve
  • Class - 1

    1-i-10;16-b-10;16-b-1;16-t-7;41-b-10;67-b-10;68-b-7;70-m-7;71-x-10;71-m-7:1-i-10-in car stop switch damaged unable to pulled in case of an emergency.16-b-10-repair hoistway door 3rd fl bottom strike wall & prop

    Aug 11, 2017 · Penalty $1,000

    Resolve
  • Non-hazardous

    8v1/12q3/10i11/25d6/28q3/34q3/21l10/8v1/6 fl. stop.10i10/panel gib.34q/top of car.21l-pulling on5th fl door stops cra.

    Jul 17, 2003

    Resolve
  • Non-hazardous

    08v1,12q03,10i11,25d06,28q03,34q03,21l10. 08-v,6 6th flr stop. 10i-1,panel gib. 34-q top of car. 21-l-pulling on 5th fl door stops car

    Jul 17, 2003

    Resolve
  • Non-hazardous

    32q03 32-q-counterweight guard in pit

    Jun 17, 2003

    Resolve
  • Non-hazardous

    08v01,12q03,10i11,25d06,28q03,34q03,21l10. 08-v-6th flr. 10-i-panel gib. 34-q-top of car.21-l-pulling on 5th flr door stops car

    Jun 17, 2003

    Resolve
  • Non-hazardous

    15m07/12q03/08v01/67m07/18m07. 67m toe guard missing. 18m glass 6th fl.

    Feb 14, 2003

    Resolve
  • Non-hazardous

    Failure to provide elevator landing sign for elevator bank two on fl 2to 6.failure to provide 3-inch high alphabetic letter for elevator bank(two)for open staircase(two)on fl 1 to 6.failure to provide 3-inch

    Jun 8, 2000

    Resolve
  • Non-hazardous

    26x11,27x11,11q3,35z09,28b01,73u07, cease use until item 27x are completed with . for inspection call 212-312-8731

    Mar 1, 2000 · Penalty $500

    Resolve
Show 8 more ↓
  • Non-hazardous

    22d50y35o35ad57o47b 35a -elec-pipes m.room. 47-shorten gov. rope.

    Mar 7, 1998

    Resolve
  • Non-hazardous

    35o2,39r5,52r5. 35-remove animals from motor room. installed new traction sheave & brake without permit. file for & obtain permit-havetest by this dept.

    Nov 21, 1997

    Resolve
  • Non-hazardous

    50c17, 9h12, 18i12, 75u17. provide means to room 9-sapple worm 18-basement interlocks damaged. 75-5 yr test.

    Sep 6, 1997

    Resolve
  • Non-hazardous

    73r5. file application and obtain permit for removal of elevator illegally.

    Sep 6, 1997

    Resolve
  • Non-hazardous

    54h,01b,02b,13m,09i. 54 bearings on a.c motor. 01 + 02 inaudible.

    Nov 30, 1996

    Resolve
  • Non-hazardous

    02b,11q,14m,15l,17i,22d,35p. 35-unable to gain access to motor room tocomplete inspection.

    May 2, 1995

    Resolve
  • Non-hazardous

    73x, (73)restore elevator service for complete inspection.

    Mar 5, 1993 · Penalty $5,000

    Resolve
  • Non-hazardous

    73#, return to elevator to sevice so elev. can be inspected by this ept. or file for removal dismantle.

    Aug 21, 1992 · Penalty $100

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 50

    Close
  • Heat/hot water

    Entire building

    Dec 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2025 · Apt L3

    Close
  • Paint/plaster

    Door/frame

    Mar 20, 2025 · Apt 4L

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2024 · Apt 6D

    Close
  • Unsanitary condition

    Pests

    Dec 3, 2024 · Apt 1C

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Oct 29, 2024 · Apt 6D

    Close
  • Plumbing

    Water supply

    Oct 29, 2024 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Oct 8, 2024 · Apt 6D

    Close
  • Plumbing

    Radiator

    Jul 18, 2024 · Apt 6N

    Close
  • General

    Cabinet

    Jul 18, 2024 · Apt 6N

    Close
  • Plumbing

    Basin/sink

    Jul 18, 2024 · Apt 6N

    Close
  • Water leak

    Slow leak

    Jul 18, 2024 · Apt 6N

    Close
  • Flooring/stairs

    Floor

    Jul 18, 2024 · Apt 6N

    Close
  • Paint/plaster

    Wall

    Jul 18, 2024 · Apt 6N

    Close
  • Appliance

    Electric/gas range

    Apr 30, 2024 · Apt QQ

    Close
  • General

    Cooking gas

    Mar 29, 2024 · Apt 4R

    Open
  • General

    Cooking gas

    Mar 27, 2024 · Apt 6D

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2024 · Apt 5O

    Close
  • General

    Cooking gas

    Mar 1, 2024 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Feb 27, 2024 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2024 · Apt 6D

    Close
  • Appliance

    Electric/gas range

    Feb 22, 2024 · Apt 6D

    Close
  • General

    Cooking gas

    Feb 18, 2024 · Apt 6D

    Close
  • General

    Cooking gas

    Feb 8, 2024 · Apt 6D

    Close
  • General

    Cooking gas

    Jan 28, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jan 26, 2024 · Apt 6D

    Close
  • General

    Cooking gas

    Jan 26, 2024 · Apt 6D

    Close
  • General

    Cooking gas

    Jan 24, 2024 · Apt 6H

    Close
  • Appliance

    Electric/gas range

    Jan 23, 2024 · Apt 6H

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 27, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 4, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 7, 2022 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Dec 7, 2022 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2022 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 11, 2022 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2022 · Apt 1D

    Close
  • Paint/plaster

    Wall

    Dec 1, 2021 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Dec 1, 2021 · Apt 2C

    Close
  • Electric

    Power outage

    Dec 1, 2021 · Apt 2C

    Close
  • Door/window

    Door

    Jul 19, 2021 · Apt 6J

    Close
  • Plumbing

    Basin/sink

    Jul 19, 2021 · Apt 6J

    Close
  • Appliance

    Electric/gas range

    Jul 19, 2021 · Apt 6J

    Close
  • Appliance

    Refrigerator

    Jul 19, 2021 · Apt 6J

    Close
  • Plumbing

    Water supply

    Jun 3, 2021 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1926
Floors
6
Residential units
100
Building area
63,000 ft²
Lot area
15,000 ft²
Zoning
R7A
Community board
314
Council district
40
Block / lot
5121 / 18
Assessed value
$2,978,100
Landmark / historic district
No

HPD registration #300618, last renewed Aug 11, 2025.

Questions about 220 East 18 Street

Who owns 220 East 18 Street?

The owner of record in NYC Department of City Planning PLUTO data is Drenis Enterprises, LLC.

Does 220 East 18 Street have violations?

Yes. NYC HPD has recorded 242 housing violations at this property.

Is 220 East 18 Street rent stabilized?

NYC Department of Finance tax bills listed 100 rent-stabilized units here in 2024 (about 100% of its 100 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 220 East 18 Street built?

City records list 1926 as the year it was built.

How many apartments are in 220 East 18 Street?

It has 100 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.