123 Linden Boulevard
Brooklyn, NY 11226BBL 3-05084-0084Map
Owner of record: 123 Linden LLC
123 Linden Boulevard is an elevator apartment building built in 2017 in Brooklyn, 11226. It has 467 residential units across 20 floors. The owner of record is 123 Linden LLC. HPD has recorded 345 housing violations here, most recently on October 7, 2026. 50 of the 50 most recent violations are still open. City tax records listed 141 rent-stabilized apartments here in 2024.
- HPD violations
- 345
- DOB violations
- 124
- ECB violations
- 93
- HPD complaints
- 584
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 345
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door. at compactor closet, 11th story
Oct 7, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 11e, 11th story, 4th apartment from east at south
Oct 5, 2026 · Apt 11E
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet observed at floor panel at south wall in the 1st room from north located at apt 11e, 11th story, 4th apartment from east at south
Oct 5, 2026 · Apt 11E
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square ft observed at floor at west wall in the 1st room from east at north located at apt 11c, 11th story, 2nd apartment from west at north
Sep 26, 2026 · Apt 11C
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square ft observed at floor at east wall in the 2nd room from east at north located at apt 11c, 11th story, 2nd apartment from west at north
Sep 26, 2026 · Apt 11C
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 11e, 11th story, 3rd apartment from west at north
Sep 19, 2026 · Apt 11E
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall at northeast , 11th story
Sep 19, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall at northeast , 11th story
Sep 19, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall at northeast , 11th story
Sep 19, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at floor in the kitchen located at apt 5k, 5th story, 3rd apartment from east at south
Sep 16, 2026 · Apt 5K
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5r, 5th story, 1st apartment from east at south
Sep 16, 2026 · Apt 5R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 5r, 5th story, 1st apartment from east at south
Sep 16, 2026 · Apt 5R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft wall at north in the 1st room from north located at apt 5j, 5th story, 2nd apartment from east at south
Sep 16, 2026 · Apt 5J
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in at waste under bathtub in the 2nd bathroom from east located at apt 16w, 16th story, 1st apartment from west at north
Sep 14, 2026 · Apt 16W
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking at the bottom of shower stall door in the 1st bathroom from east located at apt 16w, 16th story, 1st apartment from west at north
Sep 14, 2026 · Apt 16W
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 16w, 16th story, 1st apartment from west at north
Sep 14, 2026 · Apt 16W
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective lock at casement window at west wall in the 3rd room from east located at apt 16w, 16th story, 1st apartment from west at north
Sep 14, 2026 · Apt 16W
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5j, 5th story, 2nd apartment from east at south
Sep 5, 2026 · Apt 5J
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5j, 5th story, 2nd apartment from east at south
Sep 5, 2026 · Apt 5J
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 16t, 16th story, 4th apartment from east at south
Sep 5, 2026 · Apt 16T
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wall walls and ceiling in the 3rd room from north at west located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... i observed visable mold less than 10.sq ft at ceiling in the bathroom located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from north at west located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective broken window lock (guard ) in the 3rd room from north at east located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north at west located at apt 16t, 16th story, 4th apartment from east at south
Sep 5, 2026 · Apt 16T
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from north at east located at apt 16t, 16th story, 4th apartment from east at south
Sep 5, 2026 · Apt 16T
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... i observed visable mold less 2 sq ft at north wall in the bathroom located at apt 16t, 16th story, 4th apartment from east at south
Sep 5, 2026 · Apt 16T
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective lock at window in the 2nd room from north at east located at apt 16t, 16th story, 4th apartment from east at south
Sep 5, 2026 · Apt 16T
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from north at west located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 24p, 24th story, 1st apartment from south at west
Sep 5, 2026 · Apt 24P
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of water leak at hvac unit at west wall in the 1st room from east located at apt 11c, 11th story, 2nd apartment from west at north
Sep 3, 2026 · Apt 11C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at south window in the 3rd room from east at north located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling in the bathroom located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceiling all walls throughout in the entire apartment located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock at south wall window in the 3rd room from north at west located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the 3rd room from east at north located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective culking / grout around at standup shower in the bathroom located at apt 24p, 24th story, 1st apartment from south at west
Aug 27, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 13th story
Jul 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 13th story
Jul 30, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical vent at ceiling in the bathroom located at apt 18u, 18th story, 5th apartment from north at east
Jul 30, 2026 · Apt 18U
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 24p, 24th story, 1st apartment from south at west
Jul 26, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective casement window handle in the 2nd room from east at south located at apt 24p, 24th story, 1st apartment from south at west
Jul 26, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet doors in the kitchen located at apt 24p, 24th story, 1st apartment from south at west
Jul 26, 2026 · Apt 24P
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 24p, 24th story, 1st apartment from south at west
Jul 26, 2026 · Apt 24P
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective casement window safety hinges in the 1st room from east at south located at apt 24p, 24th story, 1st apartment from south at west
Jul 26, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 20j, 20th story, 2nd apartment from east at south
Jul 20, 2026 · Apt 20J
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 24p, 24th story, 1st apartment from south at west
Jul 19, 2026 · Apt 24P
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 24p, 24th story, 1st apartment from south at west
Jul 19, 2026 · Apt 24P
Open — Nov sent out
DOB building violations · 124
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 3, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2013
Dob violation - resolved
ECB violations · 93
- Class - 2
Restore service to device (8.6.5.8.). top landing qualifies as an illegal vestibule (2.11.6.5.).
Aug 17, 2026 · Penalty $625
Active - Class - 1
Failure to maintain building code compliant manner. at time of inspection observed at lobby level where staircase's b/d discharge into exit passageway, area obstructed by building material, appliances. area use
Sep 11, 2025 · Penalty $2,500
Resolve - Class - 2
Upon my inspectoin elevator was found to be out of service. restore to service.
Aug 8, 2025 · Penalty $312
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection observed at rear building concrete work in progress leaving a 9 feet hole open 33 feet by 6 feet wide unsafe condition for pedestrian, safeguard public and property
Nov 13, 2023
Resolve - Class - 2
At time of inspection observed concrete work been done at rear building without d.o.b approval or permit posted., obtain all permits
Nov 13, 2023
Resolve - Class - 1
16:p:17; cab door and hoistway doors open on the 3rd floor, but the 3rd floor door buck is closed off completely by sheetrock not allowing access to third floor. this work has been done without a permit and not
Sep 27, 2023 · Penalty $2,500
Active - Class - 1
16:p:17; cab door and hoistway doors open on the 3rd floor, but the 3rd floor door buck is closed off completely by sheetrock not allowing access to third floor. this work has been done without a permit and not
Sep 27, 2023 · Penalty $2,500
Active - Class - 1
16:p:17; cab door and hoistway doors open on the 3rd floor, but the 3rd floor door buck is closed off completely by sheetrock not allowing access to third floor. this work has been done without a permit and not
Sep 27, 2023 · Penalty $2,500
Active - Class - 1
16:p:17; cab door and hoistway doors open on the 3rd floor, but the 3rd floor door buck is closed off completely by sheetrock not allowing access to third floor. this work has been done without a permit and not
Sep 27, 2023 · Penalty $2,500
Active
Show 40 more ↓
- Class - 2
Found state water heater s/n1848112733832 inside unit 6r defective. pressure relief valve defective leaking causing corrsion at base of water heater., maintain boiler; correct all violating conditions and submi
Apr 18, 2023 · Penalty $625
Active - Class - 2
At time of inspection observed ceiling at apartment 6r have water damage paint piling and hanging, window on living room no properly closing. hair cracks on wall at multiple locations., repair and/or replace
Mar 27, 2023 · Penalty $3,125
Active - Class - 2
Failure to maintain building exterior walls or appurtenances.note:at time of inspection observed exp #1 south elevation spalled balcony slab concrete at 7th fl(south west corner) ex- #4 east elevation spalling
Jan 4, 2023 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#917762. remedy:submit acceptable requir
Dec 9, 2022 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg exterior wall facade&appurtenances.observed@exp1s elevation damaged balcony slab@12fl line w/parking garage&spalledconcrete@exp4 setback.maintain bldg exterior walls/facade&appurtenance
Oct 31, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building exterior walls facade & appurtenances.observed at exp #1 south elevation damaged balcony slab at 12th fl line with parking garage.remedy:maintaing builsing exerior walls/facade & ap
Oct 31, 2022
Resolve - Class - 1
Sec. 3303.4.7 storage near sidewalk pathway. note: at time of my inspection of a 26 sty bldg topped off completed & occupied. no work in progress,i observed a dumpster container filled to the top w/construction
Nov 16, 2020 · Penalty $625
Resolve - Class - 1
28-104.8.4-tenant protection plan not filed note at time of inspection observed work being performed under the aforementioned job number this building is currently being occupied by other tenants during this wo
Jul 15, 2020 · Penalty $2,500
Resolve - Class - 1
Filed form containing false statements note at time of inspection observed work being performed under the aforementioned job number the (pw1) for this job stats the building is not occupied while work is being
Jul 15, 2020
Resolve - Class - 2
Sec. 3310.8.4 inadequate site safety logs. noted: at the time of my inspection of an active new bldg permitted job i noticed some site work was need on exp#4 & their was no overhead protection in place to prote
Jun 30, 2020 · Penalty $625
Resolve - Class - 1
Removed ohp contrary to approved ssp. noted: at the time of my inspection on an active job site i observe overhead protection removed on exp#4 which is a driveway/walkway for a nursing home behind said proopert
Jun 30, 2020 · Penalty $625
Resolve - Class - 1
Sec. title 28 illegal engaging in any business ot occupation w/o a required license or other authorization. at the time of my inspection,i observed a outrigger suspended scaffold installed at the roof level at
May 8, 2020 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approve construction documents &/or approved amendments. at the time of my inspection,i observed outrigger beams installed at the roof level at exp#3. upon my review of the cd5 it was
May 8, 2020 · Penalty $2,530
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. atthe tine of my inspection i observed the housekeeping @ the(gl -4fl)level was not being adequately maintained per section requirements,i obs
May 8, 2020
Resolve - Class - 2
Posting of unlawful signs,information,pictorial rep,business or advertising messages on protection structure. at the time of my inspection,iobserved signs noted in the violating details posted on the sidewalk
May 8, 2020
Resolve - Class - 1
Bc3303.7.2.fire extinguishers(not maintained)at time of inspection i observed on roof, fire extinguishers was placed behind selfclosing dooralso on 5th,9th,and ground floor.fire ext can be seen placed on ground
Feb 20, 2020 · Penalty $250
Resolve - Class - 1
97b17: (97-b-17) elevator must be on permanent power. must do a complete retest of elevator when building is on permanent power from con-edison.
Feb 5, 2020 · Penalty $1,250
Resolve - Class - 1
97b17: (97-b-17) elevators must be on permanent power. must do a complete re-test of elevator when building is on permanent power from con-edison.
Feb 5, 2020 · Penalty $1,250
Resolve - Class - 1
97b17: (97-b-17) elevator must be on permanent power. must do a complete re-test of elevator when building is on permanent power from con-edison.
Feb 5, 2020 · Penalty $1,250
Resolve - Class - 1
97x10:failure to maintain building in code compliant manner. service equipment elevator bc 3001.2&27-297 dob records show device 3p0987926 as active. upon inspection the device is found to be out of service. re
Feb 3, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to maintain adequate housekeeping.note:at time of my inspection of a 26 story bldgs topped off at roof construction work to progressi observed large amount of construction debris and materials scattered
Jan 7, 2020
Resolve - Class - 2
Failure to provide approved/accepted documents at time of inspection.at time of inspection of a 26 story building under construction,i observed a suspended scaffold at exp.3 on the 27th fl/roof.upon request for
Jan 3, 2020 · Penalty $312
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection of a 26 story new building under construction,i observed multiple areas with stacked debris or material and scraps in pat
Jan 3, 2020
Resolve - Class - 1
Work does not conform to approved construction documents and/or aproved amendments.at time of inspection of a 26 story new building under construction,i observed a supported scaffold at the 27th fl.with the fol
Jan 3, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to provide/maintain adequate/safe controlled access zone at the construction site.at time of inspection of a 26 story new building under construction,i observed areas at exp.2,3,at multiple floors,inclu
Jan 3, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-guard rails,perimeter projection.at time of inspection of a 26 story new building under construction,i observed multiple areas w
Jan 3, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to post or distribute safe construction bill of rights.at timeof inspection of a 26 story new building under construction,i observedthat the safe construction bill of rights was not posted at each occup
Jan 3, 2020
Resolve - Class - 1
Work does not conform to approved construciton documents and/or approved amendements.-tpp.at time of inspection of a 26 story new building under construction,i observed that floors that have a valid tco and flo
Jan 3, 2020
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at tiem of inspection of a 26 story new building under construction,i observed a sidewalk shed with the following conditions:g
Jan 3, 2020 · Penalty $2,500
Resolve - Class - 1
Bc330345-failure to obtain/provide fdny permit for generator and fuel tank.at time of inspection of a 26 story new building under construction,i observed a generator and a 5000 gallon fuel tank stored in the st
Jan 3, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and /or approved amendments.note:at the time of inspection of a 26 story building nprogress up inspetion i observed the building was occupied from the 5f
Dec 3, 2019
Resolve - Class - 2
Failure to institute and maintain safety equipment measures and temporary construction.note:at the time of inspection of a 26 story new building in progress i observed 1-inadaquete netting in the hoist run dama
Dec 3, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to maintain adequate housekeeping as per section requirements.note:at the time of inspection oa a 26 story new building in progress i observed inadequte housekeeping from the 26th floor to 22 floor bloc
Dec 3, 2019 · Penalty $2,500
Resolve - Class - 1
Elavator and hoist during construction or demolition.note:at the time of my inspection responding to a complaint that the hoist is not working and workers are working above 75ft,i observed no hoist running and
Dec 3, 2019
Resolve - Class - 1
Sec. 3307.6.5.11 the permit holder failed to notify the dept more than2 bussiness day following the removal of sidewalk shed. at time of inspection at an active job site,i observed a sidewalk shed at the main
Nov 15, 2019
Resolve - Class - 1
Failure to institute safaty measures at jobsite. at time of inspectionat an active job site,i observed worker standing at the top of a 6ft aframe ladder taping around windows on the 1st fl. also,noted on the 22
Nov 15, 2019
Resolve - Class - 1
Failure to maintain/display on site documents required by chapter 33-concrete safety strap(d-rings)letter of transferal. at time of inspection at an active job site,i observed concrete safety straps on several
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 1
Housekeeping inadequate. nb at time of my inspection of 26 sty new bldg topped off at roof. at time job site i observed construction debris & materials cluttered throughout jobsite from 15th to 25th fl. this
Aug 12, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. atthe time of inspection i observed proposed 26 sty new bldg w/work activity present. i also observed inadequate housekeeping at various locat
Jun 5, 2019
Resolve - Class - 1
Failure to produce daily log for inspection. atoi, holder of nb permit #321228603 failed to produce the daily log that is required by bc 3321.2, item 3., produce the daily log for inspection
May 24, 2019
Resolve
Complaints
- Appliance
Refrigerator
Oct 9, 2026 · Apt 12K
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 12K
Open - Plumbing
Water supply
Oct 4, 2026 · Apt 11W
Open - Unsanitary condition
Pests
Oct 1, 2026 · Apt APT11E
Close - Unsanitary condition
Pests
Sep 28, 2026 · Apt 11E
Close - Unsanitary condition
Mold
Sep 24, 2026 · Apt 11C
Close - Paint/plaster
Ceiling
Sep 16, 2026 · Apt 5R
Close - Unsanitary condition
Pests
Sep 16, 2026 · Apt 11E
Close - Unsanitary condition
Pests
Sep 16, 2026 · Apt 11E
Close - Unsanitary condition
Mold
Sep 14, 2026 · Apt 5K
Close
Show 40 more ↓
- Unsanitary condition
Mold
Sep 13, 2026 · Apt 5J
Close - Paint/plaster
Wall
Sep 10, 2026 · Apt 12J
Close - Flooring/stairs
Floor
Sep 10, 2026 · Apt 12J
Close - Door/window
Window frame
Sep 8, 2026 · Apt 16W
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 16W
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 16W
Close - Safety
Window guard broken/missing
Sep 8, 2026 · Apt 16W
Close - Door/window
Window frame
Sep 8, 2026 · Apt 16W
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 5J
Close - General
Ventilation system
Sep 4, 2026 · Apt 24P
Close - Appliance
Electric/gas range
Sep 4, 2026 · Apt 24P
Close - Paint/plaster
Cabinet
Sep 4, 2026 · Apt 24P
Close - Door/window
Window frame
Sep 4, 2026 · Apt 24P
Close - Safety
Window guard broken/missing
Sep 4, 2026 · Apt 24P
Close - Door/window
Door
Sep 4, 2026 · Apt 24P
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 24P
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 24P
Close - Door/window
Window frame
Sep 4, 2026 · Apt 24P
Close - Water leak
Slow leak
Aug 27, 2026 · Apt 11C
Close - Door/window
Window frame
Aug 27, 2026 · Apt 16T
Close - General
Ventilation system
Aug 27, 2026 · Apt 16T
Close - Unsanitary condition
Mold
Aug 27, 2026 · Apt 16T
Close - General
Bell/buzzer/intercom
Aug 27, 2026 · Apt 16T
Close - Paint/plaster
Wall
Aug 27, 2026 · Apt 16T
Close - Unsanitary condition
Pests
Aug 27, 2026 · Apt 16T
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 11C
Close - Water leak
Slow leak
Aug 26, 2026 · Apt 11C
Close - Appliance
Electric/gas range
Aug 25, 2026 · Apt 24P
Close - Door/window
Window frame
Aug 25, 2026 · Apt 24P
Close - Safety
Window guard broken/missing
Aug 25, 2026 · Apt 24P
Close - Flooring/stairs
Floor
Aug 25, 2026 · Apt 24P
Close - Door/window
Window frame
Aug 25, 2026 · Apt 24P
Close - Water leak
Damp spot
Aug 25, 2026 · Apt 24P
Close - Paint/plaster
Wall
Aug 25, 2026 · Apt 24P
Close - General
Cabinet
Aug 25, 2026 · Apt 24P
Close - Door/window
Door
Aug 25, 2026 · Apt 24P
Close - Unsanitary condition
Mold
Aug 25, 2026 · Apt 24P
Close - Unsanitary condition
Pests
Aug 14, 2026 · Apt 8F
Close - Water leak
Heavy flow
Aug 13, 2026 · Apt 14G
Close - Plumbing
Water supply
Aug 13, 2026 · Apt 14G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2017
- Floors
- 20
- Residential units
- 467
- Building area
- 366,757 ft²
- Lot area
- 32,125 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5084 / 84
- Assessed value
- $45,159,750
- Landmark / historic district
- No
HPD registration #388927, last renewed Apr 23, 2026.
Questions about 123 Linden Boulevard
Who owns 123 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 123 Linden LLC.
Does 123 Linden Boulevard have violations?
Yes. NYC HPD has recorded 345 housing violations at this property.
Is 123 Linden Boulevard rent stabilized?
NYC Department of Finance tax bills listed 141 rent-stabilized units here in 2024 (about 30% of its 467 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 123 Linden Boulevard built?
City records list 2017 as the year it was built.
How many apartments are in 123 Linden Boulevard?
It has 467 residential units and 469 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.