2217 Caton Avenue
Brooklyn, NY 11226BBL 3-05083-7502Map
Owner of record: 2217 Caton Avenue Condominum
2217 Caton Avenue is a condominium built in 2009 in Brooklyn, 11226. It has 29 residential units across 9 floors. The owner of record is 2217 Caton Avenue Condominum. HPD has recorded 86 housing violations here, most recently on September 22, 2026. 15 of the 50 most recent violations are still open. City tax records listed 29 rent-stabilized apartments here in 2024.
- HPD violations
- 86
- DOB violations
- 7
- ECB violations
- 38
- HPD complaints
- 60
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 86
- CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar at boiler room
Sep 22, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9a, 9th story, 1st apartment from west at north
Sep 22, 2026 · Apt 9A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of referigerator with doors attached at public hall stairs, 6th story, section ''east''
Sep 20, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at hopper door at south wall , 6th story
Sep 3, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6b, 6th story, 1st apartment from north at east
Sep 3, 2026 · Apt 6B
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the cieling in the bathroom located at apt 6b, 6th story, 1st apartment from north at east
Sep 3, 2026 · Apt 6B
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 1st apartment from north at east
Sep 3, 2026 · Apt 6B
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4d, 4th story, 1st apartment from north at east
Sep 2, 2026 · Apt 4D
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 2, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Sep 2, 2026 · Apt 4D
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Sep 2, 2026 · Apt 4D
Open — Civ14 mailed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4d, 4th story, 1st apartment from north at east
Sep 2, 2026 · Apt 4D
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - BHazardous
Provide an acceptable heavy duty lock and lach set installed at building entrance door
Jan 13, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at building entrance door
Jan 13, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Oct 28, 2025 · Apt 6D
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Oct 28, 2025 · Apt 6D
Closed — Violation dismissed - BHazardous
Replace with new the missing heavy duty lockset at building entrance door
Apr 11, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening electromagnetic locking mechanism
Apr 11, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx square feet at east wall in the 2nd room from east located at apt 9c, 9th story, 1st apartment from north at east
Oct 27, 2023 · Apt 9C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess in the 2nd room from east located at apt 9c, 9th story, 1st apartment from north at east
Oct 27, 2023 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east located at apt 9c, 9th story, 1st apartment from north at east
Oct 27, 2023 · Apt 9C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at window recess in the 1st room from north located at apt 9c, 9th story, 1st apartment from north at east
Oct 27, 2023 · Apt 9C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at window recsss in the 1st room from north located at apt 9c, 9th story, 1st apartment from north at east
Oct 27, 2023 · Apt 9C
Closed — Violation dismissed - BHazardous
Provide bars at windows at public hall
Oct 27, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx square feet at east wall in the 2nd room from east located at apt 9c, 9th story, 1st apartment from north at east original violation 16342406 issued 27-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 27, 2023 · Apt 9C
Open — Nov certified late - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 21, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 9th story
Oct 21, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling and east wall at public hall, 9th story
Oct 21, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 9th story
Oct 21, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall at interior of closet at west wall in the 2nd room from east at south located at apt 8b, 8th story, 2nd apartment from north at east
Feb 2, 2022 · Apt 8B
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box : missing at public hall, 1st story
Jan 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 3, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor : missing at public hall, 1st story
Jan 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system : door to cellar and/or boiler room locked. at boiler room
Jan 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9c, 9th story, 1st apartment from north at east
Jan 3, 2022 · Apt 9C
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 3, 2022
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device install at the front door at public hall, 1st story
Sep 10, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 10, 2021
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of constructions items at public hall, 8th story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 10, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 10, 2021
Closed — Violation dismissed
DOB building violations · 7
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
May 31, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2012
Dob violation - resolved
ECB violations · 38
- Class - 2
1) expired brake maintenance tag. 2) expired cat5 tag. 3) secure bolts on shackles that is on the counter weight frame (loosened). 4) equalize cables. 5) excessive metal shavings seen around hoist machine.
May 15, 2026 · Penalty $1,562
Resolve - Class - 2
Repair 3rd floor door lock. change car door hanger rollers. change car roller guide.
Aug 6, 2021 · Penalty $1,562
Resolve - Class - 2
Repair door lock monitor to work with fireman's service phase 1( should not recall )., repair phone., provide counter weight runby sign.
Aug 26, 2020 · Penalty $625
Resolve - Class - 2
Failure to submit a required cycle 8c report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#814962. remedy: submit acceptable required technica
Feb 13, 2020
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. *at time of inspection manlift in use. workers are 10 stysin air w/no safety harness.
Sep 20, 2010 · Penalty $2,400
Resolve - Class - 2
3303.1.3 contractors shed not fire retardant treated at time of insp observed contractor shed located or 1st fl & bsmt not fire retardant treated rem: remove or make fire retardant as per dob code call best for
Jun 30, 2010 · Penalty $800
Resolve - Class - 1
3309.10 failure to provide roof protection at time of insp observed noroof protection for adjacent properties @ 2201 caton 2233 caton & 2108 bedford site bldg at 9stories which is above all adjacent bldg rem: s
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection not time of insp observed jobsite fence gate opens out toward public walking & not into jobsite as per dob this fence is located on bedford ave rem: connect
Jun 30, 2010 · Penalty $800
Resolve - Class - 3
Use and maintenance of site walk shed at time of insp observed sidewalk shed lights not 200 watt on 3400 lumen as per code rem: install 200 watt a 3400 lumer under sidewalk shed
Jun 30, 2010 · Penalty $300
Resolve - Class - 3
3303.4.2 containers or street not covered at time of insp observed 2 containers debris fully loaded w/ debris & not covered rem: cover containers at end of each day
Jun 30, 2010 · Penalty $300
Resolve
Show 28 more ↓
- Class - 2
Failure to post dot permits at time of insp observed no dot permit posted for jobsite rem; post dot permits call best for ri
Jun 30, 2010 · Penalty $250
Resolve - Class - 1
Sec. bc 3314.4.4 material & debris susceptible to dislodgment shall not be stored on scaffolds while work is not being performed. noted: excessive debris left on planks at all exposures on scaffold bricks compo
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. bc 3314.8 except for scaffolds platforms 6 feet or less above the ground,the open side & ends of every scaffold platform shall be provided with a guardrail system & toe board. noted: at 8th fl observed wor
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate. noted: workers on supported scaffold at 8th fl did not have the scaffold user certificste. remedy: discontinue activity or obtain a supported scaffold
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. bc 3314.4.5 erected,dismantled repaired,maintained,modified or removed supported scaffold w/o a scaffold certificate of completion. noted: supported scaffold erected at 8th fl set back to 9th fl w/o a 32hr
Jun 30, 2010 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents. noted: supported scaffold erected under permit #320123941 contrary to approved plans at 8th fl set back at exposure #1,#4 not shown on approved plans.
Jun 30, 2010 · Penalty $500
Resolve - Class - 1
Sec. bc 3314.4.3 all scaffolds,except for suspended scaffolds,shall beinspected daily before each use toy a competent person. noted: no daily inspection record for sidewalk shed & supported scaffold for 6/30/10
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 2
Use & maintenance of sidewalk sheds: the use of sidewalk sheds shall be in accordance with the following material & debris shall not be stored on sidewalk sheds unless the shed has been so designed. noted: shed
Jun 30, 2010 · Penalty $2,400
Resolve - Class - 1
3307.6.2 failure to provide overhead protection at time of insp observed no overhead protection for adjacent properties driveway @ 2233 caton 2108 bedford rem: provide overhead protection for driveway & ajdacen
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 2
3303.4.4 excessive debris at time of insp observed excessive amounts of debris throughout site or all floors the site is considered a fire hazard debris scattered inside & outside of site combustible debris at
Jun 30, 2010 · Penalty $800
Resolve - Class - 1
Failure to provide handrails at time of insp observed no handrails on all stairways from bsmt to 9th fl rem: provide handrails on all floors call best for ri
Jun 30, 2010 · Penalty $1,000
Resolve - Class - 1
Failure to provide guardrail at time of insp observed no guardrail system on roof openings & inadequate guard systems on 2nd fl and 8th fl exp4 also no guardrails system on balconies rem; provide guardrails sys
Jun 30, 2010 · Penalty $2,400
Resolve - Class - 2
No elevator is readiness at time of insp observed bldg to 9th fl over 75' in height w/ no elevator in readiness rem: provide elevator in readiness call best for ri
Jun 30, 2010 · Penalty $800
Resolve - Class - 1
Sec. bc 3314.9 supported scaffold does not meet code specifications. noted: scaffold erected under permit #320123941,is missing cross bracing,locking pins,loose netting,planks not tied down - at 8th fl set back
Jun 30, 2010 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperation note ongoing construction of 9sty bldg under permit #302248558 some concrete been spilled out of the pump & cause some spots of ce
Mar 10, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to institute/maintain safety equipment measures, no handrails.located noted: stairs from 1st to 2nd floors. pictures dated. rem: provide handrails.
Jan 27, 2010 · Penalty $1,000
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection. noted: gates swing outside. pictures taken & dated. rem: repair/replace gates to swin g inside.
Jan 27, 2010 · Penalty $800
Resolve - Class - 1
Failure to institute safety equipment measures: no guardrails. noted: no guardrails @ exposure # 1, perimeter wall @ all levels stop all work except to provide safety. call to best low rise for re-inspection. r
Jan 27, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements note at the north west and south east side of site an area approx 10'x20'directly below an adjacent bldg windows on the north west side is fill
Aug 17, 2009 · Penalty $800
Resolve - Class - 2
Failure tp provide approved accepted plans at job site at time of inspection at time of inspection observed active work in progress on new bldg permitted under job 302248556 has failed to provide approved
Aug 14, 2009 · Penalty $800
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperation no smoking signs w/in construction site not observed in violation of nyc fire code 1404.1 and fc 310 rem: safeguard public and pro
Dec 6, 2008 · Penalty $800
Resolve - Class - 1
Sec bc3301.2 & 27-1009a failure to safeguard all persons and property affected by construction operations noted at time of insp a construction site under a partial stop work order foundation walls in place w/ a
Dec 6, 2008 · Penalty $1,600
Resolve - Hazardous
Stop all work. failure to safeguard public and property affected by construction operation. noted at time of inspection an active site and underpinning completed along #2110 bedford ave (exp3) piles driven
Apr 17, 2008 · Penalty $1,000
Resolve - Hazardous
Stop all work. no guard rails. noted at time of inspection an active site underpinning completed along #2110 bedford ave (exp 3) piles in place along rear yard (exp 3) foundation walls in place along bedford
Apr 17, 2008 · Penalty $1,000
Resolve - Hazardous
Stop all work. failure to adequately support adjoining grounds and structures affected by excavation. noted: at time of inspection an activesite underpinning completed along #2110 bedford ave and foundation
Apr 17, 2008 · Penalty $1,000
Resolve - Hazardous
Stop all work. failure to adequately protect the sides of an excavation carried to a depth greater than 5 feet. noted: at time of inspectionan active site underpinning completed along #2110 bedford ave (exp 3)
Apr 17, 2008 · Penalty $1,000
Resolve - Hazardous
Stop all work. failure to maintain adequate housekeeping. noted: at time of inspection an active site underpinning completed along #2110 bedford ave (rear yard exp 3) piles in place along rear yard. (exp 3)
Apr 17, 2008 · Penalty $500
Resolve - Hazardous
Failure to provide 24hr notice.upon insp noted:bldg was demolished to grade,site graded & dob records shows.start date was called for 2/5/07 & last inspection on 5-25-07 state no start demolition.dob records sh
Jun 26, 2007 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 21, 2026 · Apt BLDG
Close - General
Cooking gas
Sep 1, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Aug 31, 2026 · Apt 6B
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Aug 31, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Aug 17, 2026 · Apt 4D
Close - Water leak
Slow leak
Dec 8, 2025 · Apt 8C
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 2B
Close - General
Ventilation system
Nov 13, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 6D
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Oct 26, 2025 · Apt 6D
Close - Heat/hot water
Apartment only
Apr 12, 2025 · Apt 6D
Close - Heat/hot water
Apartment only
Apr 9, 2025 · Apt 6D
Close - Heat/hot water
Apartment only
Dec 27, 2023 · Apt 2A
Close - Unsanitary condition
Mold
Oct 12, 2023 · Apt 9C
Close - Heat/hot water
Apartment only
Jan 2, 2023 · Apt 7A
Close - Heat/hot water
Apartment only
Dec 27, 2022 · Apt 7A
Close - Heat/hot water
Apartment only
Nov 29, 2022 · Apt 6D
Close - Heat/hot water
Entire building
Jan 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 2, 2022 · Apt 5C
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt 8B
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt 8B
Close - Unsanitary condition
Mold
Jan 2, 2022 · Apt 8B
Close - Heat/hot water
Entire building
Jan 1, 2022 · Apt BLDG
Close - Plumbing
Toilet
Aug 23, 2021 · Apt 8B
Close - Door/window
Window pane
Aug 5, 2021 · Apt 8B
Close - Water leak
Slow leak
Jan 12, 2021 · Apt 7B
Close - Water leak
Slow leak
Nov 10, 2020 · Apt 7B
Close - Unsanitary condition
Mold
Jun 19, 2020 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 7, 2018 · Apt 7C
Close - Heat/hot water
Apartment only
Dec 6, 2018 · Apt 7C
Close - Heat/hot water
Apartment only
Dec 5, 2018 · Apt 7C
Close - Heat/hot water
Entire building
Dec 5, 2018 · Apt 6A
Close - Water leak
Damp spot
Mar 2, 2018 · Apt 6B
Close - Electric
Power outage
Mar 2, 2018 · Apt 6B
Close - Heat/hot water
Apartment only
Mar 2, 2018 · Apt 6B
Close - Water leak
Heavy flow
Mar 2, 2018 · Apt 7B
Close - Water leak
Heavy flow
Mar 2, 2018 · Apt 7C
Close - Heat/hot water
Entire building
Nov 19, 2014 · Apt 9A
Close - Paint/plaster
Ceiling
Mar 20, 2014 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RR)
- Year built
- 2009
- Floors
- 9
- Residential units
- 29
- Building area
- 30,248 ft²
- Lot area
- 6,200 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5083 / 7502
- Assessed value
- $2,695,050
- Landmark / historic district
- No
HPD registration #383521, last renewed Sep 26, 2025.
Questions about 2217 Caton Avenue
Who owns 2217 Caton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2217 Caton Avenue Condominum.
Does 2217 Caton Avenue have violations?
Yes. NYC HPD has recorded 86 housing violations at this property.
Is 2217 Caton Avenue rent stabilized?
NYC Department of Finance tax bills listed 29 rent-stabilized units here in 2024 (about 100% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2217 Caton Avenue built?
City records list 2009 as the year it was built.
How many apartments are in 2217 Caton Avenue?
It has 29 residential units and 45 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.