2160 Caton Avenue
Brooklyn, NY 11226BBL 3-05083-0108Map
Owner of record: Caton 6064 LLC
2160 Caton Avenue is an elevator apartment building built in 1934 in Brooklyn, 11226. It has 48 residential units across 6 floors. The owner of record is Caton 6064 LLC. HPD has recorded 152 housing violations here, most recently on September 28, 2026. 25 of the 50 most recent violations are still open. City tax records listed 48 rent-stabilized apartments here in 2024.
- HPD violations
- 152
- DOB violations
- 24
- ECB violations
- 6
- HPD complaints
- 397
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 152
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 6th story
Sep 28, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less than 10sq ft at west wall in the bathroom located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5d, 5th story, 3rd apartment from north at east
Sep 28, 2026 · Apt 5D
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 6g, 6th story, 2nd apartment from west at north
Feb 14, 2026 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 6th story
Feb 14, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the 1st room from east located at apt 6g, 6th story, 2nd apartment from west at north original violation 18645577 issued 14-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 14, 2026 · Apt 6G
Open — Notice of issuance sent to tenant
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Feb 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 6th story
Feb 14, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the 1st room from east located at apt 6g, 6th story, 2nd apartment from west at north
Feb 14, 2026 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4g, 4th story, 2nd apartment from west at north
Feb 14, 2026 · Apt 4G
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of glazing at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective hinge in the entrance located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 3rd room from east located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4d, 4th story, 3rd apartment from east at south
Sep 13, 2025 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4d, 4th story, 3rd apartment from east at south
Sep 13, 2025 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4d, 4th story, 3rd apartment from east at south
Sep 13, 2025 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the north side of door in the entrance located at apt 6d, 6th story, 3rd apartment from east at south
Feb 1, 2024 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the north and east wall in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Feb 1, 2024 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at cold water knob in the kitchen located at apt 6d, 6th story, 3rd apartment from east at south
Feb 1, 2024 · Apt 6D
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Feb 1, 2024 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective compactor closet at public hall, 4th story
Sep 29, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 1st room from north at west located at apt 5d, 5th story, 4th apartment from east at south
Apr 26, 2023 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective floor tile in the kitchen located at apt 5d, 5th story, 4th apartment from east at south
Apr 26, 2023 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 4th apartment from east at south
Apr 26, 2023 · Apt 5D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5d, 5th story, 4th apartment from east at south
Apr 26, 2023 · Apt 5D
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the 1st room from east at south, the kitchen located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the foyer located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6d, 6th story, 3rd apartment from east at south
Jan 18, 2023 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 5d, 5th story, 3rd apartment from east at south
May 20, 2022 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5d, 5th story, 3rd apartment from east at south
May 20, 2022 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5d, 5th story, 3rd apartment from east at south
May 20, 2022 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 3rd apartment from east at south
May 20, 2022 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 24, 2022 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 24, 2022 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Jan 24, 2022 · Apt 3B
Closed — Violation closed
DOB building violations · 24
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Construction other optional
Ftm 5 stry+cell masonry walls+wood joists flrs m.d.bldg.ext walls in state of disrepair.crack bricks found throughout at all walls at windows.brick cracks also found at connection of fire escape to ext walls¶pets.remedy:own engage lic pe&cont'r eval bldg&perform all rprs.file perm for rpr wrk no later 6/15/18.start wrk no later 7/1/18
May 3, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 5, 2012
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 29, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2003
Dob violation - resolved - Elevator elevatorrequired
3p2553
Oct 24, 2000
Dob violation - resolved - Elevator elevatorrequired
3p2553
Oct 14, 1999
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 1994
Vpw*-violation unserved ecb-work without permit-dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 1989
Dob violation - resolved
ECB violations · 6
- Class - 1
Failure to maintain walls or appurtenances. at time of inspection exp#3/4 corner observed continues a vartical cracks from 1st fl(central) 6th fl w/various vertical cracks at multiple location-fire escape passa
Feb 21, 2018 · Penalty $1,000
Resolve - Class - 2
52b07 53h14 68m07 40d06 52b proper anti spin outs 40d grating under gov
Mar 17, 2009
Resolve - Class - 2
100m07. 100m07 failure to post elevator work permit as required
Oct 8, 2008
Resolve - Non-hazardous
85m07,86m07,83v01. 83-v-01 elevator doesnt stop level w/ some flrs.
Aug 14, 2007
Resolve - Non-hazardous
08v01,05m07,09m07,20i11,31q06,74m07,62m07,35p17.05-guard missing car door.09-provide with fire tab.20-1fl call botton.31-electrical covers top of car.74-limits switch covers missing.62-toe guard missing.35-prov
Mar 9, 2001
Resolve - Non-hazardous
13m, 75#. 75) perform 5yr test, property tag device and file form elv3
Apr 3, 1995
Resolve
Complaints
- Unsanitary condition
Pests
Sep 24, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Sep 24, 2026 · Apt 5D
Close - Paint/plaster
Wall
Sep 24, 2026 · Apt 5D
Close - Flooring/stairs
Floor
Sep 24, 2026 · Apt 5D
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 5D
Close - General
Cabinet
Sep 24, 2026 · Apt 5D
Close - Flooring/stairs
Floor
Sep 24, 2026 · Apt 5D
Close - Door/window
Window frame
Feb 11, 2026 · Apt 6G
Close - Door/window
Window pane
Feb 11, 2026 · Apt 6G
Close - Unsanitary condition
Mold
Feb 11, 2026 · Apt 6G
Close
Show 40 more ↓
- Door/window
Window frame
Feb 11, 2026 · Apt 6G
Close - Water leak
Heavy flow
Feb 11, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
Feb 11, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt 4G
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Sep 15, 2025 · Apt 1B
Close - Paint/plaster
Wall
Sep 15, 2025 · Apt 1B
Close - Unsanitary condition
Mold
Sep 10, 2025 · Apt 4D
Close - Water leak
Heavy flow
Sep 9, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Sep 9, 2025 · Apt 1B
Close - Water leak
Slow leak
Sep 9, 2025 · Apt 1B
Close - Paint/plaster
Wall
Sep 9, 2025 · Apt 1B
Close - Door/window
Door
Sep 9, 2025 · Apt 1B
Close - Water leak
Slow leak
Mar 12, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Mar 12, 2025 · Apt 1B
Close - Door/window
Window frame
Mar 12, 2025 · Apt 1B
Close - Plumbing
Water supply
Dec 28, 2024 · Apt 4G
Close - Unsanitary condition
Garbage/recycling storage
Apr 13, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Apr 4, 2024 · Apt 4E
Close - Plumbing
Toilet
Jan 30, 2024 · Apt 6D
Close - Paint/plaster
Door/frame
Jan 30, 2024 · Apt 6D
Close - Flooring/stairs
Floor
Jan 30, 2024 · Apt 6D
Close - Plumbing
Toilet
Jan 26, 2024 · Apt 6D
Close - Paint/plaster
Door/frame
Jan 26, 2024 · Apt 6D
Close - Flooring/stairs
Floor
Jan 26, 2024 · Apt 6D
Close - Unsanitary condition
Mold
Dec 14, 2023 · Apt 1G
Close - Water leak
Heavy flow
Dec 14, 2023 · Apt 1G
Close - Door/window
Door
Sep 26, 2023 · Apt 3A
Close - Paint/plaster
Door/frame
Jun 28, 2023 · Apt 4E
Close - Appliance
Electric/gas range
Jun 28, 2023 · Apt 4E
Close - Door/window
Door
Apr 14, 2023 · Apt 6D
Close - Paint/plaster
Wall
Apr 14, 2023 · Apt 6D
Close - Appliance
Electric/gas range
Mar 29, 2023 · Apt 4E
Close - Door/window
Door
Mar 29, 2023 · Apt 4E
Close - Appliance
Electric/gas range
Mar 29, 2023 · Apt 4E
Close - Flooring/stairs
Floor
Mar 27, 2023 · Apt 5D
Close - Flooring/stairs
Floor
Mar 27, 2023 · Apt 5D
Close - Door/window
Window frame
Mar 27, 2023 · Apt 5D
Close - Paint/plaster
Ceiling
Mar 27, 2023 · Apt 5D
Close - Unsanitary condition
Pests
Mar 27, 2023 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1934
- Floors
- 6
- Residential units
- 48
- Building area
- 35,736 ft²
- Lot area
- 10,662 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5083 / 108
- Assessed value
- $1,627,650
- Landmark / historic district
- No
HPD registration #300994, last renewed Aug 20, 2025.
Questions about 2160 Caton Avenue
Who owns 2160 Caton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Caton 6064 LLC.
Does 2160 Caton Avenue have violations?
Yes. NYC HPD has recorded 152 housing violations at this property.
Is 2160 Caton Avenue rent stabilized?
NYC Department of Finance tax bills listed 48 rent-stabilized units here in 2024 (about 100% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2160 Caton Avenue built?
City records list 1934 as the year it was built.
How many apartments are in 2160 Caton Avenue?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.