roofy

50 Lenox Road

Brooklyn, NY 11226BBL 3-05083-0032Map

Owner of record: Lenbed Realties LLC

50 Lenox Road is an elevator apartment building built in 1937 in Brooklyn, 11226. It has 54 residential units across 6 floors. The owner of record is Lenbed Realties LLC. HPD has recorded 412 housing violations here, most recently on April 5, 2026. 7 of the 50 most recent violations are still open. City tax records listed 54 rent-stabilized apartments here in 2024.

HPD violations
412
DOB violations
47
ECB violations
5
HPD complaints
661

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
54
About 100% of the building's 54 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 412

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the kitchen located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door frame from west at north wall in the kitchen located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Open — Nov certified late
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Apr 5, 2026

    Closed — Violation dismissed
  • B

    Provide stove knob safety covers or permanent stove safety knobs with integrated locking mechanisms for the gas stove top in the kitchen located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective rubber weather strip at bottom of door in the entrance located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from east at south

    Apr 5, 2026 · Apt 1F

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Jan 20, 2026

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items at public hall, 5th story

    Jan 20, 2026

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective lock and latch assembly at vestibule door at public hall, 1st story

    Jan 6, 2026

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective shower door in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Jan 6, 2026 · Apt 1A

    Open — Invalid certification
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 28, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Dec 28, 2025 · Apt 6D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Dec 28, 2025 · Apt 6D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Dec 28, 2025 · Apt 6D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west

    Dec 28, 2025 · Apt 6D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Nov 13, 2025 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Nov 13, 2025 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east

    Nov 7, 2025 · Apt 5B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from east located at apt 5b, 5th story, 1st apartment from north at east

    Nov 7, 2025 · Apt 5B

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key oprated lock at door leading to fire escape in the 1st room from north located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective counter balance at lower sash at fire escape window in the 1st room from north located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 2nd apartment from south at west

    Oct 26, 2025 · Apt 5D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north

    Oct 22, 2025 · Apt 2C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north

    Oct 22, 2025 · Apt 2C

    Open — False certification
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 18, 2025 · Apt 3D

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system elevator is lock at 1st story , leading to boiler rom at celler. . at boiler room

    Oct 18, 2025

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 18, 2025 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 18, 2025 · Apt 3D

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 18, 2025 · Apt 3D

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice at basement

    Jun 3, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south

    May 13, 2025 · Apt 5A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    May 13, 2025 · Apt 5A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    May 13, 2025 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 5a, 5th story, 1st apartment from east at south

    May 13, 2025 · Apt 5A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Apr 9, 2025 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 5a, 5th story, 1st apartment from east at south

    Apr 9, 2025 · Apt 5A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Apr 9, 2025 · Apt 5A

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south original violation 17259672 issued 10-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 10, 2024 · Apt 5A

    Open — First no access to re- inspect violation
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 1st story

    Sep 10, 2024

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 5th story

    Sep 10, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 5th story

    Sep 10, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Sep 10, 2024 · Apt 5A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at south

    Sep 10, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood inside bottom at base sink cabinet in the kitchen located at apt 5a, 5th story, 1st apartment from east at south

    Sep 10, 2024 · Apt 5A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south

    Sep 10, 2024 · Apt 5A

    Closed — Violation closed
  • B

    Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 5a, 5th story, 1st apartment from east at south

    Sep 10, 2024 · Apt 5A

    Closed — Violation dismissed

DOB building violations · 47

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2023

    Jun 23, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Jun 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Oct 10, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - active
Show 37 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2018

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)

    Feb 16, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2017

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 24, 2016

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2016

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)

    Jun 1, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2016

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2015

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years

    Jun 1, 2015

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2014

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 6, 2014

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4

    Dec 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 23, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 4, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 28, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 27, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 13, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 5, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    3p2785

    Mar 15, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    3p2785

    Oct 14, 1999

    Dob violation - resolved
  • Elevator elevatorrequired

    3p2785

    Dec 9, 1998

    Dob violation - resolved

ECB violations · 5

  • Class - 2

    The phone is not working properly (bc 1968 chap 18 article 2 (f))

    May 27, 2026 · Penalty $310

    Resolve
  • Non-hazardous

    Work w/o permit. illegal work noted: in the caton ave side of property(south side) 2 curb cut each approx 10'-6" had been created for accessto both side court yards (east & west sides) for vehicle parking. the

    Jul 10, 2007 · Penalty $250

    Active
  • Non-hazardous

    Exit passageway obstructed. note: in west side court yard area, 2 vehicles observed parked. 1 white lincoln & a nissan sentra. also observed1 large plastic swimming pool approx 10-12 ft diameter by 18" high, as

    Jul 10, 2007 · Penalty $800

    Active
  • Non-hazardous

    69j10,84m07,20m07,16b01.69j-cut buffer misaligned.84m-provide toe guard.20m-6f missing vision panel guard.16b-basement door check-has to be adjust!

    Mar 24, 2004

    Resolve
  • Non-hazardous

    08v,09h,17m,35p.

    Oct 30, 1995

    Resolve

Complaints

  • Water leak

    Slow leak

    Apr 1, 2026 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt 5DNOTE

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2026 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Dec 1, 2025 · Apt 5A

    Close
  • Door/window

    Door

    Nov 7, 2025 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Nov 7, 2025 · Apt 1A

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2025 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2025 · Apt 3D

    Close
  • Appliance

    Refrigerator

    Oct 14, 2025 · Apt 2C

    Close
  • Paint/plaster

    Wall

    Oct 14, 2025 · Apt 2C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 14, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2025 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    Oct 14, 2025 · Apt 2C

    Close
  • Appliance

    Electric/gas range

    Oct 14, 2025 · Apt 2C

    Close
  • Paint/plaster

    Wall

    May 30, 2025 · Apt 5A

    Close
  • Plumbing

    Toilet

    May 30, 2025 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    May 30, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    May 30, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    May 30, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    May 8, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    May 8, 2025 · Apt 5A

    Close
  • Paint/plaster

    Wall

    May 8, 2025 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    May 8, 2025 · Apt 5A

    Close
  • Paint/plaster

    Wall

    May 8, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Apr 11, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Feb 13, 2025 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    Feb 13, 2025 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Feb 13, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 18, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 16, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Sep 3, 2024 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2024 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2024 · Apt 5A

    Close
  • Water leak

    Slow leak

    Sep 3, 2024 · Apt 5A

    Close
  • Plumbing

    Radiator

    Sep 3, 2024 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Sep 3, 2024 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2024 · Apt 5A

    Close
  • Door/window

    Door

    Jun 5, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jun 5, 2024 · Apt 1A

    Close
  • Water leak

    Slow leak

    Feb 29, 2024 · Apt 5A

    Close
  • General

    Cabinet

    Feb 29, 2024 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Oct 9, 2023 · Apt 3D

    Close
  • Water leak

    Slow leak

    Sep 30, 2023 · Apt 6B

    Close
  • Water leak

    Heavy flow

    Sep 30, 2023 · Apt 6B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1937
Floors
6
Residential units
54
Building area
60,300 ft²
Lot area
19,984 ft²
Zoning
R7A
Community board
314
Council district
40
Block / lot
5083 / 32
Assessed value
$738,000
Landmark / historic district
No

HPD registration #338856, last renewed Sep 11, 2025.

Questions about 50 Lenox Road

Who owns 50 Lenox Road?

The owner of record in NYC Department of City Planning PLUTO data is Lenbed Realties LLC.

Does 50 Lenox Road have violations?

Yes. NYC HPD has recorded 412 housing violations at this property.

Is 50 Lenox Road rent stabilized?

NYC Department of Finance tax bills listed 54 rent-stabilized units here in 2024 (about 100% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 50 Lenox Road built?

City records list 1937 as the year it was built.

How many apartments are in 50 Lenox Road?

It has 54 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.