10 Westminster Road
Brooklyn, NY 11218BBL 3-05072-0006Map
Owner of record: 10 Westminster Rd Pps LLC
10 Westminster Road is a walk-up apartment building built in 1920 in Brooklyn, 11218. It has 29 residential units across 5 floors. The owner of record is 10 Westminster Rd Pps LLC. HPD has recorded 1,226 housing violations here, most recently on September 20, 2026. 23 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 1,226
- DOB violations
- 15
- ECB violations
- 36
- HPD complaints
- 1,403
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,226
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1c, 1st story, 2nd apartment from west at north
Sep 20, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 2nd apartment from west at north
Sep 20, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jul 24, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jul 24, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the boiler room at cellar
Jul 14, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east
Jul 14, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the entrance in the 1st room from east at north located at apt 4b, 4th story, 2nd apartment from north at east
Jul 14, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Jul 14, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated locking device at vestibule entrance door , 1st story
Mar 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule entrance , 1st story
Mar 16, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective broken glass pane at lower sash wiindow in the bathroom located at apt 3b, 3rd story, 2nd apartment from north at east
Mar 9, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective broken glass at lower sash window in the 1st room from north at east located at apt 2c, 2nd story, 1st apartment from north at east
Mar 9, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls at closet in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Mar 9, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Mar 9, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective wood door frame casing at west wall in the 1st room from east at north located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 4b, 4th story, 2nd apartment from north at east
Jan 9, 2026 · Apt 4B
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling ceiling in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, ceiling in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the west wall in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the south wall in the 4th room from east at south located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, ceiling in the 4th room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at electrical light switch at north wall in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood door frame at 1st door from north at east in the 4th room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective unhinged door at the 1st door from west at north in the 2nd room from east located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 2nd room from east, the bathroom located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the private hallway located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Open — Violation will be reinspected - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the 4th room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling ceiling, ceiling in the 1st room from east at north located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective approx 3 sqft of ceramic wall tiles at west wall in the kitchen located at apt 5a, 5th story, 1st apartment from east at south
Jan 8, 2026 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Dec 17, 2025 · Apt 3C
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the 2nd bathroom from east located at apt 3c, 3rd story, 1st apartment from north at east
Dec 17, 2025 · Apt 3C
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at showerbody, at bathtub in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Dec 14, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Dec 14, 2025 · Apt 3A
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Dec 14, 2025 · Apt 3A
Open — False certification
DOB building violations · 15
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under permit # 340369764 on 12/05/17 because applicant withdrawal from project. stop all work immediately and make site safe remedy:stop all work immediately and make site safe. contact the borough commissioner's office at 718-802-3677
Dec 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 23, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 7, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 6, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2012
Dob violation - dismissed
Show 5 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2012
Dob violation - dismissed - Emergency none
Egncy-emergency none
Dec 22, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 7, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 29, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 36
- Class - 1
After hours work without an after hours variance. per 28-105.12.5. noted: observed five active construction workers on saturday with electric, tile and sheetrock work., obtain after hours variance; stop all aft
Feb 10, 2024 · Penalty $1,250
Resolve - Class - 1
The submitted tpp lacks specific means and methods on health requirements section. dose not state anything about containing dust, cleaning of dust, removal of construction debris job b00807618-l1-gc; 28-201.1,
Feb 6, 2024 · Penalty $625
Resolve - Class - 2
Failure to comply with tenant protection requirements atoi observed excessive construction dust/ debris and construction material being stored on 3rd floor stairwell and 5th floor landing leading to roof. exces
Jan 22, 2024
Resolve - Class - 2
For new stair case installed @ first floor leading to basement level requesting engineeing /structural report ., conform work to approved construction documents/amendments
Jan 11, 2024
Resolve - Class - 2
Debris+storage in boiler+oil tank rooms-lights are defective-draincock leaking-oilburner highlow fire is defective-both front washouts are leaking-cold water pipe sweating onto boiler+incorrectly supported-mxin
Nov 23, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner. noted: cellar level has waste water standing on ground due to damaged waste water lines,causing slip hazard,a concrete cover is broken & loose at an i-beam
Jun 27, 2017 · Penalty $250
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use.defective electrical wiring in hooamp service switch in basement service entrance conductor burn out in
Apr 26, 2017 · Penalty $800
Resolve - Class - 2
Fail to maintain bldg in code compliant manner. re: installation/maintence of plumbing materials/equipment per bc 102.3;27-902. i observed in cellar boiler area pvc pipe installed for sanitary line w/fittings &
Apr 26, 2017 · Penalty $500
Resolve - Class - 2
Failure to provide cover face plate lampholder luminair canopy for electric outlet.circuit breaker panel covers missing throughout basement.remedy:comply with ec code.
Apr 26, 2017 · Penalty $500
Resolve - Class - 2
Electrical work without a permit.observed at 130pm branch circuit wiring installed in apartment 2d for panel outlets and fixtures.no app on file for work in apt2d appliances b425551 and b418863 b411093 does not
Apr 26, 2017 · Penalty $800
Resolve
Show 26 more ↓
- Class - 1
Electrical work without a permit.installation of light fixture out side in front of building without a permit.remedy:obtain permit
Aug 18, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain.noted:loose & unsupported brickwork,approx 3x11 section missing above 4fl front windows.rem:provide sidewalk shed & rep air & maintain facade forthwith!
Apr 18, 2014 · Penalty $10,000
Resolve - Class - 2
Work w/o permit.note:sidewalk shed erected @exp #1 extending to entrance walkway @front of bldg w/o obtaining permit.emergency declaration #8348 issued to provide protection due to approx 1'x3'brick section fac
Mar 25, 2014 · Penalty $2,000
Resolve - Class - 1
Failure to maintain exterior bldg wall in that at front facade an approx 3' x 1' section of brick has come loose from above 4th flr window &fell onto public sidewalk. there are several areas of bldg bricks
Feb 5, 2014 · Penalty $5,000
Resolve - Class - 2
Fail to maintain bldg in code compliant manner.1-exp#2-lefthand side plastic bags seat (bench) tv stored under fire-escape drop ladder.remedy: remove all items - main bldg as per code.
Aug 2, 2012
Resolve - Class - 2
Failure to maintain bldg in code compliant manner - roof, storage of rusted steel loose on roof - bulkhead, no interior or exterior protection for skylight. - bulkhead, stairs landing has several cracks and 2
Jul 13, 2012 · Penalty $500
Resolve - Class - 2
Sec. 1001.3. failure to maintain egress clear & unobstructed exp 2 on lift side (of) fire escape has planting loose (material). fire escape must be unobstructed and clear from any drop hazards. remedy: remove
Jul 13, 2012 · Penalty $800
Resolve - Class - 1
51,44c,50,50a,21a. 51- oil leaking from the oil burner. 50- no lights at the oil burner. 50a- missing discharge pipe in the backflow preventor.
Jul 5, 2012 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's. note: prior vio #34907907p issued for ffailure to maintain building wallsor appurtenances note: 4th fl brick walls or appurtenances note: 4th
Jul 3, 2012 · Penalty $8,000
Resolve - Class - 2
Failure to maintain building in code complaint manner. note: 1 metal staircase riser & stringer rotten & broken & bulling away from frame work between 5th fl & (roof) bulk head stair at rear section of building
Jul 3, 2012 · Penalty $2,500
Resolve - Class - 2
Failed to obtain a temp construction permit prior to installation/use of sidewalk shed.noted:installed approx 85 linear feet of heavy duty sidewalk shed along westminster rd.no permit has been issued.shed is c
Jun 9, 2012 · Penalty $1,250
Resolve - Class - 2
Roof interior side of parapets blistered tar partially revealing verticle horizontal cracks defective brick some thru parapet cracks front facade bldg brick roof chimney missing bricks verticle cracks window li
May 2, 2012 · Penalty $500
Resolve - Class - 2
Work w/o a permit-work noted exterior 1- erected sidewalk shed - approx 75'-0 l.f w/electrical. this violation is inliew of 34949957z. remedy: make safe immediately-obtain permits.
May 2, 2012 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code compliant manner-cellar cellar doors frames and hardware removed defective missing no lables listed on doors rem: install all doors frames and hardware according to code structu
May 2, 2012 · Penalty $500
Resolve - Class - 2
Failure to maintain adequate housekeeping all mechanical rooms are to be free of storage remove paints boxes paper scraps clothing scraps plastic bags of plastic bottles bikes cookers clothing corridors and ope
May 2, 2012
Resolve - Class - 2
Fail to maintain bldg in code compliant manner-cellar.1-cellar doors,frames & hardware removed,defective and/or missing-no labels listed on doors.rem:install all doors,frames,hardware according to code-structur
May 2, 2012
Resolve - Class - 2
At exposure #2 left hardside plastic bags seat bench tv stored under fire escape drop ladder rem: all items maintain bldg as per code
May 2, 2012
Resolve - Class - 2
Fail to maintain bldg in code compliant manner.roof-interior side of parapet-blistered tar partially revealing vertical/horizontal cracks.defective bricks some thru parapet cracks.front facade-bulging brick.roo
May 2, 2012
Resolve - Class - 2
Fail to maintain adequate housekeeping. *all* mechanical rooms are to be free of storage.remove paints,boxes,paper scraps,clothing scraps,plastic bags full of bottles,bikes,cookers,clothing corridors&open areas
May 2, 2012 · Penalty $500
Resolve - Class - 1
Failure to maintain building wall(s) or appurtences. at time of inspection observed at front of premises loose, displaced and spilling bricks above 4th floor level windows with steal linted defective and piviti
Dec 19, 2011 · Penalty $25,000
Resolve - Class - 2
Failure to maintain bldg walls. at exp wall/over 4th flr windows the brick is unkeyed, bulging and dislodged. evidence of water damage is observed on interior ceiling of apt 4b in same area of defective brick
Sep 20, 2011 · Penalty $500
Resolve - Class - 1
Failure to comply w/comm's order to correct condition cited in nov#34907907p.rem:comply w/order
Jun 17, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to maintain bldg. 4th flr front bulging and displaced bricks above window lintels. prior ecb #34907907p. remedy: maintain bldg, provide repairs.
Jun 17, 2011 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances.noted:@ 4th flr front,bulging & displaced brick masonry above window lintels @ all four windows.rem:provide public protection immediately-make repairs provide a s
Apr 9, 2011 · Penalty $5,000
Resolve - Class - 3
B654 34a.b 50.15.50 debris in boiler rm & storage
May 1, 2009
Resolve - Hazardous
Work w/o a permit. hazardous. work noted: plaster & lath removed on all partitions & walls,ceilings, also removed bx cables and plumbing pipe installed thruout entire 2b apt. heavy dust & debris throuout entire
Aug 25, 2005 · Penalty $2,500
Resolve
Complaints
- Paint/plaster
Ceiling
Sep 15, 2026 · Apt 1C
Close - Water leak
Heavy flow
Sep 15, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Jul 27, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jul 14, 2026 · Apt 3C
Close - Flooring/stairs
Floor
Jul 12, 2026 · Apt 4B
Open - Plumbing
Bathtub/shower
Jul 12, 2026 · Apt 4B
Open - Door/window
Door
Jul 12, 2026 · Apt 4B
Open - Heat/hot water
Entire building
Jul 12, 2026 · Apt 4B
Open
Show 40 more ↓
- Water leak
Heavy flow
Jul 1, 2026 · Apt 2B
Close - Unsanitary condition
Pests
May 14, 2026 · Apt 3D
Close - Electric
Power outage
May 8, 2026 · Apt BASEME
Close - Water leak
Heavy flow
Feb 7, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Jan 20, 2026 · Apt 4B
Close - Water leak
Heavy flow
Jan 20, 2026 · Apt 4B
Close - Door/window
Door
Dec 16, 2025 · Apt 4B
Close - Safety
Window guard broken/missing
Dec 16, 2025 · Apt 5A
Close - Electric
Lighting
Dec 16, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 1B
Close - General
Bell/buzzer/intercom
Dec 16, 2025 · Apt 1B
Close - Safety
Window guard broken/missing
Dec 16, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Dec 16, 2025 · Apt 1B
Close - Water leak
Heavy flow
Dec 16, 2025 · Apt 1B
Close - Water leak
Damp spot
Dec 16, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Dec 16, 2025 · Apt 1B
Close - General
Cabinet
Dec 16, 2025 · Apt 1B
Close - Paint/plaster
Radiator
Dec 16, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 4B
Close - Paint/plaster
Door/frame
Dec 16, 2025 · Apt 4B
Close - Door/window
Door
Dec 16, 2025 · Apt 4B
Close - Safety
Smoke detector
Dec 16, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Dec 16, 2025 · Apt 4B
Close - Paint/plaster
Wall
Dec 16, 2025 · Apt 4B
Close - Paint/plaster
Ceiling
Dec 16, 2025 · Apt 4B
Close - Paint/plaster
Ceiling
Dec 16, 2025 · Apt 4B
Close - Paint/plaster
Wall
Dec 16, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Dec 16, 2025 · Apt 1B
Close - Water leak
Damp spot
Dec 16, 2025 · Apt 5A
Close - Appliance
Refrigerator
Dec 16, 2025 · Apt 5A
Close - Plumbing
Basin/sink
Dec 16, 2025 · Apt 5A
Close - Electric
Outlet/switch
Dec 16, 2025 · Apt 5A
Close - Paint/plaster
Ceiling
Dec 16, 2025 · Apt 4B
Close - Door/window
Door
Dec 16, 2025 · Apt 5A
Close - General
Cabinet
Dec 16, 2025 · Apt 5A
Close - Plumbing
Basin/sink
Dec 16, 2025 · Apt 5A
Close - Water leak
Damp spot
Dec 16, 2025 · Apt 5A
Close - Flooring/stairs
Floor
Dec 16, 2025 · Apt 5A
Close - Door/window
Door
Dec 16, 2025 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 29
- Building area
- 30,702 ft²
- Lot area
- 9,050 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5072 / 6
- Assessed value
- $1,344,150
- Landmark / historic district
- No
HPD registration #301026, last renewed Dec 3, 2025.
Questions about 10 Westminster Road
Who owns 10 Westminster Road?
The owner of record in NYC Department of City Planning PLUTO data is 10 Westminster Rd Pps LLC.
Does 10 Westminster Road have violations?
Yes. NYC HPD has recorded 1,226 housing violations at this property.
Is 10 Westminster Road rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 41% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 10 Westminster Road built?
City records list 1920 as the year it was built.
How many apartments are in 10 Westminster Road?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.