271 Lenox Road
Brooklyn, NY 11226BBL 3-05066-0068Map
Owner of record: 271 Lenox Property LLC
271 Lenox Road is an elevator apartment building built in 2016 in Brooklyn, 11226. It has 55 residential units across 17 floors. The owner of record is 271 Lenox Property LLC. HPD has recorded 96 housing violations here, most recently on August 31, 2026. 1 of the 50 most recent violations are still open. City tax records listed 55 rent-stabilized apartments here in 2024.
- HPD violations
- 96
- DOB violations
- 6
- ECB violations
- 28
- HPD complaints
- 164
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 96
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15b, 15th story, 1st apartment from north at east
Aug 31, 2026 · Apt 15B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at celler at boiler room
Jul 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15bc, 15th story, 1st apartment from south at west
Jul 22, 2026 · Apt 15BC
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 15b, 15th story, 1st apartment from north at east , section at west
Jul 20, 2026 · Apt 15B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 15b, 15th story, 3rd apartment from north at east
Aug 28, 2024 · Apt 15B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 28, 2024
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures in kitchen in the entire apartment located at apt 15c, 15th story, 2nd apartment from north at east
Aug 28, 2024 · Apt 15C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15c, 15th story, 2nd apartment from north at east
Aug 28, 2024 · Apt 15C
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 15b, 15th story, 1st apartment from north at east
May 27, 2024 · Apt 15B
Closed — Violation closed
Show 40 more ↓
- BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 15b, 15th story, 1st apartment from north at east
May 27, 2024 · Apt 15B
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at bathub in the bathroom located at apt 15b, 15th story, 1st apartment from north at east
May 27, 2024 · Apt 15B
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 15b, 15th story, 1st apartment from north at east
Apr 26, 2024 · Apt 15B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15b, 15th story, 1st apartment from north at east
Jan 6, 2024 · Apt 15B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11b, 11th story, 1st apartment from north at east
Nov 28, 2023 · Apt 11B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 11b, 11th story, 1st apartment from north at east
Nov 28, 2023 · Apt 11B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11b, 11th story, 1st apartment from north at east , section ''west''
Nov 19, 2023 · Apt 11B
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 1, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 1, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 1, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 1, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 1, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 1, 2023
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 1, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15b, 5th story, 1st apartment from north at east
Apr 27, 2023 · Apt 15B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9c, 9th story, 1st apartment from south at west
Mar 26, 2023 · Apt 9C
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective locking device in the entrance located at apt 5b, 5th story, 1st apartment from north at east , section at west
Mar 24, 2023 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Mar 11, 2023
Closed — Violation closed - BHazardous
Properly repair the broken or defective at radiator in the 1st room from north located at apt 11b, 11th story, 1st apartment from north at east
Mar 11, 2023 · Apt 11B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 11b, 11th story, 1st apartment from north at east
Mar 11, 2023 · Apt 11B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 11a, 11th story, 1st apartment from south at west
Feb 27, 2023 · Apt 11A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 11a, 11th story, 1st apartment from south at west
Feb 27, 2023 · Apt 11A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 11a, 11th story, 1st apartment from south at west
Feb 27, 2023 · Apt 11A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15b, 15th story, 1st apartment from north at east
Feb 18, 2023 · Apt 15B
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Dec 26, 2022
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Dec 26, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective locking assembly at building front at fire passage way, 1st story
Nov 1, 2022
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at all hotwater fixtures in the entire apartment located at apt 5d, 5th story, 1st apartment from north at east
Oct 24, 2022 · Apt 5D
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 23, 2022
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking device at east at public hall
Oct 23, 2022
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective locking device at west at public hall
Oct 23, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor defective at public hall, 1st story
Aug 9, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 9, 2022
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 9, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 4, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 4, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story
May 4, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 4, 2022
Closed — Violation closed
DOB building violations · 6
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed
ECB violations · 28
- Class - 2
1) phone is not working 2) provide additional top of car stop switch
Dec 21, 2022 · Penalty $1,562
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#917759.remedy:submit acceptable require
Dec 9, 2022
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation#38270731k issued on 7/17/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptable certifi
Oct 21, 2020 · Penalty $3,125
Resolve - Class - 2
97-p-16:provide access to building and leevator so a proper inspection can be conducted * management of property refused access to teh building
Jul 17, 2019 · Penalty $625
Resolve - Class - 1
Cu05a10 cease use item door zone restrictor has been rendered inoperative. this is a safety device to ensure elevator passengers safety. rmdy: repair restrictor and contact nycdob at 212-393-2435 and email
Apr 25, 2019
Resolve - Class - 1
100b1)adjust excessive slack on leveling tape in the pit.
May 23, 2018 · Penalty $1,250
Resolve - Class - 1
No designated concrete safety manager. at time of inspection observed,active job site. concrete operations in progress.the concrete safety manger #2016 is not found on the pw2 in dob files. all concrete opera
Nov 23, 2016 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved plans. at time of inspection observed, active job site. a platform has been constructed at exp1 on the 9thfloor exterior of the building, and is used to pick equipment and mate
Nov 23, 2016
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. at time of inspection observe,d active job stie concrete operations are in progress. workers are constructing form work for the bulk head at roof
Nov 23, 2016 · Penalty $4,800
Resolve - Class - 1
3309.10 failure to provide adequate roof protection. at time of inspection observed, active job site. the roof protection provided for the adjoining property at exp4 is found to be inadequate and is missing at
Nov 23, 2016 · Penalty $400
Resolve
Show 18 more ↓
- Class - 1
3308.5. vertical safety netting not maintained. at time of inspection observed, active job site the vertical safety netting is found to be inadequate and is loose, and hanging in various locations, putting per
Nov 23, 2016 · Penalty $1,600
Resolve - Class - 1
3308.5.3 cables inadequate. at time of inspection observed, active job site. the cable system is found to be inadequate and missing top cables and 2nd cable from the top in various locations, and loose/hang
Nov 23, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to provide approved plans at site at time of inspection.at time of inspection observed, active job site. concrete operations are in progress. when the site safety plan was requested for inspection,
Nov 23, 2016
Resolve - Class - 1
Sec. 28-110.1 osha10. noted: 3 workers;one of them is bartolo garcia,no hard hats on while on active construction site w/other trades present. all 3 workers do not have active osha 10 card. bartolo garcia has
Oct 11, 2016 · Penalty $400
Resolve - Class - 2
Sec. 3308.3 vertical safety netting not per code damaged. noted: active construction site,new bldg at 15th fl. vertical netting at perimeter not maintained holes & openings observed throughout. remedy: maintain
Oct 11, 2016
Resolve - Class - 2
Work does not conform to approved construction document-pipe scaffold design/sidewalk shed. noted: pipe scaffold erected at exp#2&4,portion of pipe scaffold vests on sidewalk shed erected at exp#1 not shown on
Oct 11, 2016
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.noted: at time of my inspection of a 16story bldg at 16 flr level, construc tion work in progress on 16th flr deck at exp1 that consist of formwor
Sep 14, 2016
Resolve - Class - 1
Failed to perform successful hydrostatic pressure test of standpipe system.note:at the time of inspection of a 16story bldg at 16 flr level,approximately 160ft construction wrk in progress.upon request for hydr
Sep 7, 2016 · Penalty $2,400
Resolve - Class - 1
Bc3309.13/protection of adjoining equipment and spaces.noted:at the time of inspection of a 16 story bldg at 16th flr level,construction wrkin progress.i observed that there were no protection provided for adja
Sep 7, 2016 · Penalty $1,600
Resolve - Class - 1
Electrical wrk w/out a permit.noted:at the time of my inspection of a 16 story bldg at 16th flr level,construction wrk in progress.i observed electrical standpipe alarm installed at cellar level,review of depar
Sep 7, 2016 · Penalty $800
Resolve - Class - 1
Bc3301.6/design,sizes and capacity of materials,structures,temporary construction and equipment.noted:at the time of my inspection of a 16 story bldg at 16th flr level,construction wrk in progress.i observed a
Sep 7, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3308.6.14/supported scaffold alternative.noted:at the time of my inspection of a 16 story bldg at 16th flr level,approximately 160ft construction wrk in progress.i observed supported pipe scaffold being used
Sep 7, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3307.6.2/protection where required.noted:at the time of my inspection of a 16 story bldg at 16 flr level,construction wrk in progress.i observed two means of egress provided at exposure one for personnels tha
Sep 7, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to safeguard all persons and properly affected by constructionoperations.noted:at the time of my inspection of a 16 story bldg at 16flr level,construction wrk in progress.i observed that there were no o
Sep 7, 2016 · Penalty $5,000
Resolve - Class - 1
Wrk w/out permit.noted:at the time of my inspection of a 16 story bldgat 16th flr level,construction wrk in progress.i observed a climbing formwork system being use for shear wall construction at exposure 2 & 4
Sep 7, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to provide protection @ start of excavation.noted @ time of inspection in progress has excavated for footing @ rear of property approx 10-12 feet deep w/ no 1:1 (slopes) observed,no sheeting a story a b
Dec 21, 2015 · Penalty $12,000
Resolve - Class - 2
Job fence not constructed pursuant to subsection noted fence panel 8ftx4ft fallen on sidewalk create opening to vacant lot and unsafe condition to public
Mar 26, 2009 · Penalty $400
Resolve - Class - 2
Work w.o permit. erected construction fence at vacant lot exp 8/25/08 permit # 302044865. remedy: renew permit.
Mar 26, 2009 · Penalty $800
Resolve
Complaints
- Electric
Outlet/switch
Oct 9, 2026 · Apt 5C
Open - Heat/hot water
Entire building
Jul 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 20, 2026 · Apt 15BC
Close - Unsanitary condition
Mold
Jul 13, 2026 · Apt 5B
Close - General
Bell/buzzer/intercom
Feb 28, 2025 · Apt 6L
Close - Door/window
Door
Feb 11, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2025 · Apt 13D
Close - Heat/hot water
Apartment only
Jan 27, 2025 · Apt 13D
Close - Plumbing
Basin/sink
Oct 23, 2024 · Apt 13A
Close - Heat/hot water
Apartment only
Aug 22, 2024 · Apt 15C
Close
Show 40 more ↓
- Door/window
Door
May 13, 2024 · Apt 15C
Close - Door/window
Door frame
May 13, 2024 · Apt 6D
Close - Door/window
Door
May 13, 2024 · Apt 15B
Close - Heat/hot water
Apartment only
Apr 25, 2024 · Apt 15B
Close - Unsanitary condition
Garbage/recycling storage
Jan 16, 2024 · Apt 12D
Close - Heat/hot water
Apartment only
Jan 4, 2024 · Apt 15B
Close - Electric
Wiring
Dec 13, 2023 · Apt 13A
Close - Electric
Wiring
Nov 29, 2023 · Apt 13A
Close - Heat/hot water
Apartment only
Nov 27, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Nov 17, 2023 · Apt 11B
Close - Electric
Wiring
Nov 16, 2023 · Apt 13A
Close - Heat/hot water
Apartment only
Nov 14, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Nov 14, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Nov 13, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Nov 12, 2023 · Apt 11B
Close - Electric
Outlet/switch
Sep 27, 2023 · Apt 13A
Close - Electric
Wiring
Sep 27, 2023 · Apt 13A
Close - Electric
Outlet/switch
Jul 14, 2023 · Apt 13A
Close - General
Bell/buzzer/intercom
Jul 5, 2023 · Apt 15B
Close - Heat/hot water
Apartment only
Jun 10, 2023 · Apt 4D
Close - Heat/hot water
Apartment only
May 18, 2023 · Apt 15B
Close - Heat/hot water
Apartment only
Apr 30, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Apr 26, 2023 · Apt 15B
Close - Heat/hot water
Apartment only
Apr 26, 2023 · Apt 15B
Close - Heat/hot water
Apartment only
Apr 24, 2023 · Apt 5B
Close - Heat/hot water
Apartment only
Mar 25, 2023 · Apt 11A
Close - General
Bell/buzzer/intercom
Mar 25, 2023 · Apt 11A
Close - Heat/hot water
Apartment only
Mar 23, 2023 · Apt 5B
Close - General
Bell/buzzer/intercom
Mar 22, 2023 · Apt 13A
Close - Heat/hot water
Apartment only
Mar 9, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Feb 25, 2023 · Apt 11A
Close - Door/window
Door
Feb 23, 2023 · Apt 5B
Close - Heat/hot water
Apartment only
Feb 23, 2023 · Apt 5B
Close - Plumbing
Radiator
Feb 23, 2023 · Apt 11B
Close - Heat/hot water
Entire building
Feb 21, 2023 · Apt 11B
Close - Heat/hot water
Apartment only
Feb 19, 2023 · Apt 5B
Close - Heat/hot water
Apartment only
Feb 16, 2023 · Apt 11B
Close - Unsanitary condition
Garbage/recycling storage
Feb 3, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 27, 2022 · Apt 11B
Close - Plumbing
Water supply
Dec 25, 2022 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2016
- Floors
- 17
- Residential units
- 55
- Building area
- 75,871 ft²
- Lot area
- 15,680 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5066 / 68
- Assessed value
- $8,662,500
- Landmark / historic district
- No
HPD registration #388212, last renewed Jun 25, 2026.
Questions about 271 Lenox Road
Who owns 271 Lenox Road?
The owner of record in NYC Department of City Planning PLUTO data is 271 Lenox Property LLC.
Does 271 Lenox Road have violations?
Yes. NYC HPD has recorded 96 housing violations at this property.
Is 271 Lenox Road rent stabilized?
NYC Department of Finance tax bills listed 55 rent-stabilized units here in 2024 (about 100% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 271 Lenox Road built?
City records list 2016 as the year it was built.
How many apartments are in 271 Lenox Road?
It has 55 residential units and 57 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.