167 Lenox Road
Brooklyn, NY 11226BBL 3-05065-0085Map
Owner of record: Lenox Apt's LLC
167 Lenox Road is a walk-up apartment building built in 1925 in Brooklyn, 11226. It has 38 residential units across 4 floors. The owner of record is Lenox Apt's LLC. HPD has recorded 676 housing violations here, most recently on September 12, 2026. 47 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.
- HPD violations
- 676
- DOB violations
- 4
- ECB violations
- 0
- HPD complaints
- 642
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 676
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations improper placement in the entire apartment located at apt b3, 1st story, 1st apartment from west at north , section at north
Sep 12, 2026 · Apt B3
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules improper placement in the entire apartment located at apt b3, 1st story, 1st apartment from west at north , section at north
Sep 12, 2026 · Apt B3
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt b3, 1st story, 1st apartment from west at north , section at north
Sep 12, 2026 · Apt B3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt b3, 1st story, 1st apartment from west at north , section at north
Sep 12, 2026 · Apt B3
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt b3, 1st story, 1st apartment from west at north , section at north
Sep 12, 2026 · Apt B3
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner prutruding more the 4 inches beyond window sill on 2nd and 3rd story balconies at the front of the building at fire escape
Sep 4, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt b8, 2nd story, 1st apartment from west at north , section at north
Aug 13, 2026 · Apt B8
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 2nd story
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 3rd story
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 4th story
Aug 13, 2026
Open — Nov certified on time
Show 40 more ↓
- ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landings at public hall stairs, section at north
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls at public hall stairs, section at north
Aug 13, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and landing at north bulkhead
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and north and east walls at north bulkhead
Aug 13, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north and east walls at north bulkhead
Aug 13, 2026
Open — Nov certified on time - BHazardous
Provide lower metal mesh screen at sky light at north section
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated lock installed at exterior of south bulkhead door
Aug 13, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening key operated lock installed at exterior of north bulkhead door
Aug 13, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Aug 13, 2026
Open — Nov certified on time - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes furniture and household items at 2nd story balcony at 1st stack from south at east yard at fire escape
Aug 13, 2026
Open — Nov certified on time - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components, all balconies, all stories at 1st stack from south at east yard at fire escape
Aug 13, 2026
Open — Nov sent out - BHazardous
Refit the door at vestibule , 1st story
Aug 13, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at .. yard
Aug 13, 2026
Open — Defect letter issued - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components, all balconies, all stories at 2nd stack from west at building front at fire escape
Aug 13, 2026
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components, all balconies, all stories at 1st stack from west at building front at fire escape
Aug 13, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt b8, 2nd story, 1st apartment from west at north , section at north
Aug 13, 2026 · Apt B8
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 1st story
Aug 13, 2026
Open — Nov certified on time - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape. in the 4th room from east located at apt b8, 2nd story, 1st apartment from west at north , section at north
Aug 13, 2026 · Apt B8
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at south bulkhead
Aug 13, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at vestibule , 1st story
Aug 13, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt b8, 2nd story, 1st apartment from west at north , section at north
Aug 13, 2026 · Apt B8
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of bicycle preventing drop ladder from fully extending at 1st stack from west at building front at fire escape
Aug 13, 2026
Open — Nov certified on time - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at north bulkhead
Aug 13, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard of the building
Aug 13, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt aptb2, 2nd story, 2nd apartment from south at west , section ''b''
Aug 2, 2026 · Apt APTB2
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 2, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt aptb2, 2nd story, 2nd apartment from south at west , section ''b''
Aug 2, 2026 · Apt APTB2
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of pests. evidence of flies at public hall, 4th story
Jul 30, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
Jul 30, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Jul 30, 2026
Open — Nov certified on time - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 4th story
Jul 30, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective wood floor near radiator in the 3rd room from north located at apt b2, 1st story, 3rd apartment from south at west
Jul 30, 2026 · Apt B2
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a18, 4th story, 1st apartment from south at west
Jun 10, 2026 · Apt A18
Open — False certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a18, 4th story, 1st apartment from south at west
Jun 10, 2026 · Apt A18
Open — False certification - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 18, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt a15, 3rd story, 2nd apartment from east at south
May 18, 2026 · Apt A15
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt a15, 3rd story, 2nd apartment from east at south
May 18, 2026 · Apt A15
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter ballance at lower window sash at south wall in the kitchen located at apt a15, 3rd story, 2nd apartment from east at south
May 18, 2026 · Apt A15
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at wasteline at washbasin in the bathroom located at apt a15, 3rd story, 2nd apartment from east at south
May 18, 2026 · Apt A15
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt a15, 3rd story, 2nd apartment from east at south
May 18, 2026 · Apt A15
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Electric
No lighting
Aug 17, 2026 · Apt A18
Close - Unsanitary condition
Pests
Jul 27, 2026 · Apt APTB2
Close - Unsanitary condition
Pests
Jul 27, 2026 · Apt APTB2
Close - Water leak
Heavy flow
Jul 27, 2026 · Apt APTB2
Close - Unsanitary condition
Mold
Jul 27, 2026 · Apt APTB2
Close - Water leak
Damp spot
Jul 27, 2026 · Apt APTB2
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt A18
Close - Plumbing
Basin/sink
Jun 9, 2026 · Apt A18
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt A18
Close - Paint/plaster
Wall
Jun 9, 2026 · Apt A18
Close
Show 40 more ↓
- Door/window
Door
Jun 9, 2026 · Apt A18
Close - Water leak
Slow leak
May 14, 2026 · Apt A15
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2026 · Apt A15
Close - Door/window
Window frame
May 14, 2026 · Apt A15
Close - Appliance
Electric/gas range
May 14, 2026 · Apt A15
Close - Plumbing
Basin/sink
May 14, 2026 · Apt A15
Close - Plumbing
Basin/sink
May 14, 2026 · Apt A15
Close - Door/window
Door
May 14, 2026 · Apt A15
Close - General
Bell/buzzer/intercom
May 14, 2026 · Apt A15
Close - Unsanitary condition
Mold
May 10, 2026 · Apt A3
Close - Heat/hot water
Entire building
May 2, 2026 · Apt A20
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt A3
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Mar 17, 2026 · Apt BLDG
Close - Outside building
Skylight
Mar 17, 2026 · Apt BLDG
Close - Door/window
Door
Mar 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt A11
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt B10
Close - Heat/hot water
Apartment only
Mar 17, 2026 · Apt B15
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt A14
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Mar 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt A3
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt APTA3
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt A3
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt A3
Close - Paint/plaster
Ceiling
Feb 7, 2026 · Apt A3
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt A3
Close - Appliance
Electric/gas range
Jan 26, 2026 · Apt B10
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt A1
Open - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 11STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 4
- Residential units
- 38
- Building area
- 30,575 ft²
- Lot area
- 11,600 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5065 / 85
- Assessed value
- $1,165,950
- Landmark / historic district
- No
HPD registration #333130, last renewed Jun 30, 2025.
Questions about 167 Lenox Road
Who owns 167 Lenox Road?
The owner of record in NYC Department of City Planning PLUTO data is Lenox Apt's LLC.
Does 167 Lenox Road have violations?
Yes. NYC HPD has recorded 676 housing violations at this property.
Is 167 Lenox Road rent stabilized?
NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 100% of its 38 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 167 Lenox Road built?
City records list 1925 as the year it was built.
How many apartments are in 167 Lenox Road?
It has 38 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.