2075 Bedford Avenue
Brooklyn, NY 11226BBL 3-05065-0001Map
Owner of record: 101 Lonox LLC
2075 Bedford Avenue is a walk-up apartment building built in 1922 in Brooklyn, 11226. It has 40 residential units across 5 floors. The owner of record is 101 Lonox LLC. HPD has recorded 1,017 housing violations here, most recently on September 28, 2026. 11 of the 50 most recent violations are still open. City tax records listed 40 rent-stabilized apartments here in 2024.
- HPD violations
- 1,017
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 942
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,017
- BHazardous
Properly repair with similar material the broken or defective wood floor at south in the 1st room from north at west located at apt apt5e, 5th story, 2nd apartment from north at east
Sep 28, 2026 · Apt APT5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective fixture at ceiling in the 1st room from north at east located at apt apt5e, 5th story, 2nd apartment from north at east
Sep 28, 2026 · Apt APT5E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter balance upper sash in the kitchen located at apt apt5e, 5th story, 2nd apartment from north at east
Sep 28, 2026 · Apt APT5E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west
Jul 28, 2026 · Apt 1F
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jul 28, 2026
Open — Violation will be reinspected - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall
Jul 28, 2026
Open — Nov certified on time - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jul 28, 2026
Open — Nov certified on time - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 28, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west
Jul 28, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1f, 1st story, 1st apartment from south at west
Jul 28, 2026 · Apt 1F
Open — Civ14 mailed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of the storage of a gas fired motor bike attached with chain at stair balustrade , north section at public hall, 1st story
Jun 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly secure the loose marble tread at intermediate landing , 4th from bottom up at public hall stairs, 2nd story
Jun 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats , at all building 's yards yard
Jun 7, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective cracked plaster at porch, above entrance door at, west building 's yard yard
Jun 7, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked brick wall with deteriorated and missing mortar at joints , 1st , 2nd , 3rd and 4th story, northwest section, at building 's north yard yard
Jun 7, 2026
Closed — Violation dismissed - BHazardous
Refit door at building entrance , 1st story
May 13, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal frame at building entrance door , 1st story
May 13, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 13, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood frame at door at entrance in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
May 13, 2026 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
May 13, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroom located at apt 1f, 1st story, 1st apartment from west at north
May 13, 2026 · Apt 1F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of gas scooter at public hall, 1st story
Apr 27, 2026
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of electir bicycle with battery not intact at public hall, 1st story
Apr 27, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective glass lite at entance door at public hall, 1st story
Apr 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to building entrance at west , 1st story
Feb 28, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 3rd room from east located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the 3rd room from east located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 22, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Feb 22, 2026 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame, ceiling in the 3rd room from north at west located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall, 1st radiator from north at east wall in the 1st room from north at east located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective loose stone cap above brick post with deteriorated and missing mortar at joints at southeast section, building front yard
Jan 13, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall, 1st radiator from north at east wall in the 1st room from north at east located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from south at west wall in the foyer located at apt 3e, 3rd story, 2nd apartment from north at east , section ''north''
Jan 13, 2026 · Apt 3E
Closed — Violation dismissed
DOB building violations · 4
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 28, 1988
Dob violation - dismissed
ECB violations · 3
- Class - 2
Throughout apartment 3g there is no power in both bedrooms hallway and bathroom all outlets fixtures and switches are not working. also there is a baby in the apartment, comply with ec
Oct 19, 2022
Resolve - Class - 1
Failure to maintain building in code compliant manner.as noted at front of building a partial collapse of approx 2-3ft wall and other section of masonry wall in disreapir throughout.remedy:repair and/or replace
Dec 16, 2021
Resolve - Class - 1
Heating system- boiler room sign not visible from front door of building correct violating condition and submit a certificate of correction
Dec 28, 2020 · Penalty $312
Resolve
Complaints
- Door/window
Door
Oct 8, 2026 · Apt 1F
Open - Plumbing
Radiator
Sep 22, 2026 · Apt APT5E
Close - Door/window
Window frame
Sep 22, 2026 · Apt APT5E
Close - Heat/hot water
Entire building
Jul 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 26, 2026 · Apt 1F
Close - Plumbing
Toilet
Jun 24, 2026 · Apt 5C
Close - Paint/plaster
Ceiling
Jun 3, 2026 · Apt 4F
Close - Paint/plaster
Window/frame
May 4, 2026 · Apt 1F
Close - Water leak
Heavy flow
Mar 10, 2026 · Apt 2C
Close - Door/window
Door
Mar 10, 2026 · Apt 2C
Close
Show 40 more ↓
- Unsanitary condition
Mold
Feb 11, 2026 · Apt 3F
Close - Water leak
Slow leak
Feb 11, 2026 · Apt 3F
Close - Water leak
Damp spot
Feb 11, 2026 · Apt 3F
Close - Paint/plaster
Ceiling
Jan 11, 2026 · Apt 3E
Close - Water leak
Heavy flow
Jan 11, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt 3E
Close - Heat/hot water
Apartment only
Dec 27, 2025 · Apt 2H
Close - Unsanitary condition
Garbage/recycling storage
Dec 8, 2025 · Apt BLDG
Close - Door/window
Door
Dec 8, 2025 · Apt BLDG
Close - Water leak
Slow leak
Dec 5, 2025 · Apt 1F
Close - Paint/plaster
Window/frame
Dec 5, 2025 · Apt 1F
Close - Water leak
Heavy flow
Dec 5, 2025 · Apt 1F
Close - Plumbing
Basin/sink
Nov 25, 2025 · Apt 3D
Close - Electric
No lighting
Nov 25, 2025 · Apt 3D
Close - Plumbing
Basin/sink
Nov 25, 2025 · Apt 3D
Close - Unsanitary condition
Mold
Oct 10, 2025 · Apt 2C
Close - Paint/plaster
Ceiling
Oct 8, 2025 · Apt 5C
Close - Paint/plaster
Ceiling
Oct 7, 2025 · Apt 5C
Close - Electric
Wiring
Sep 22, 2025 · Apt 5D
Close - Electric
Outlet/switch
Sep 22, 2025 · Apt 5D
Close - Unsanitary condition
Garbage/recycling storage
Sep 9, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 20, 2025 · Apt 2C
Close - Paint/plaster
Ceiling
Aug 20, 2025 · Apt 2C
Close - Plumbing
Bathtub/shower
Aug 20, 2025 · Apt 2C
Close - Unsanitary condition
Mold
Aug 19, 2025 · Apt 2C
Close - Plumbing
Bathtub/shower
Aug 19, 2025 · Apt 2C
Close - Plumbing
Water supply
Aug 16, 2025 · Apt 5D
Close - Electric
Outlet/switch
Aug 16, 2025 · Apt 5D
Close - Electric
Wiring
Aug 16, 2025 · Apt 5D
Close - Water leak
Heavy flow
Aug 10, 2025 · Apt 4G
Close - Appliance
Refrigerator
Jul 24, 2025 · Apt 3E
Close - Door/window
Door frame
Jul 24, 2025 · Apt 3E
Close - General
Cabinet
Jul 24, 2025 · Apt 3E
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 3E
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 3E
Close - Water leak
Slow leak
Jul 24, 2025 · Apt 3E
Close - Paint/plaster
Ceiling
Jul 24, 2025 · Apt 3E
Close - Appliance
Refrigerator
Jul 8, 2025 · Apt 3E
Close - Electric
Outlet/switch
Jul 6, 2025 · Apt 3E
Close - General
Cabinet
Jul 6, 2025 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 5
- Residential units
- 40
- Building area
- 39,500 ft²
- Lot area
- 12,430 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 5065 / 1
- Assessed value
- $1,201,500
- Landmark / historic district
- No
HPD registration #327129, last renewed Aug 28, 2025.
Questions about 2075 Bedford Avenue
Who owns 2075 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 101 Lonox LLC.
Does 2075 Bedford Avenue have violations?
Yes. NYC HPD has recorded 1,017 housing violations at this property.
Is 2075 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 40 rent-stabilized units here in 2024 (about 100% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2075 Bedford Avenue built?
City records list 1922 as the year it was built.
How many apartments are in 2075 Bedford Avenue?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.