roofy

55 Winthrop Street

Brooklyn, NY 11225BBL 3-05045-0078Map

Owner of record: 45-55 Realty Co

55 Winthrop Street is an elevator apartment building built in 1931 in Brooklyn, 11225. It has 77 residential units across 6 floors. The owner of record is 45-55 Realty Co. HPD has recorded 2,312 housing violations here, most recently on September 27, 2026. 18 of the 50 most recent violations are still open. City tax records listed 77 rent-stabilized apartments here in 2024.

HPD violations
2,312
DOB violations
42
ECB violations
24
HPD complaints
3,730

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
77
About 100% of the building's 77 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 2,312

  • B

    Properly secure the loose marble tread at intermediate landing, 2nd from bottom up at east section at public hall stairs, 1st story

    Sep 27, 2026

    Open — Nov sent out
  • B

    Replace with new the missing guardrail and handrail at stair below grade, southeast section, building's front yard at fire passage way

    Sep 27, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4l, 4th story, 2nd apartment from north at east

    Jul 28, 2026 · Apt 4L

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4l, 4th story, 2nd apartment from north at east

    Jul 28, 2026 · Apt 4L

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches at compactor closet, 6th story

    Jul 28, 2026

    Open — Not complied with
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south

    Jul 21, 2026 · Apt 6B

    Open — Violation will be reinspected
  • B

    Properly repair or replace the broken or defective wash basin faucet in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south

    Jul 21, 2026 · Apt 6B

    Open — Violation will be reinspected
  • A

    Repair the leaky and/or defective faucets at shower head and fixtures in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south

    Jul 21, 2026 · Apt 6B

    Open — Violation will be reinspected
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 6b, 6th story, 3rd apartment from east at south

    Jul 21, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 3rd room from north at east located at apt 6b, 6th story, 3rd apartment from east at south

    Jul 21, 2026 · Apt 6B

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in waste line in the bathtub in the bathroom located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls, ceiling and trims in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north

    May 19, 2026 · Apt 6H

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 6th story

    May 13, 2026

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''

    Apr 16, 2026 · Apt 2G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''

    Apr 16, 2026 · Apt 2G

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the apartment door in the entrance located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''

    Apr 16, 2026 · Apt 2L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 5i, 5th story, 2nd apartment from west at north , section ''east''

    Apr 16, 2026 · Apt 5I

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''

    Apr 16, 2026 · Apt 2G

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''

    Apr 16, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''

    Apr 16, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective grout in between tiles at north east and west walls in the bathroom located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''

    Apr 16, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''

    Apr 16, 2026 · Apt 2G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling. in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall. in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''

    Apr 11, 2026 · Apt 4L

    Closed — Violation dismissed
  • C

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Open — Not complied with
  • B

    Repair the roof so that it will not leak over ceiling in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''

    Apr 11, 2026 · Apt 6B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 1l, 1st story, 2nd apartment from west at north

    Feb 19, 2026 · Apt 1L

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 19, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 6th apartment from west at north

    Feb 19, 2026 · Apt 3H

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 1a, 1st story, 6th apartment from east at south

    Feb 19, 2026 · Apt 1A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 2nd apartment from west at north

    Feb 19, 2026 · Apt 1L

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Feb 4, 2026 · Apt 1C

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at cailing in the 2nd room from east located at apt 1c, 1st story, 1st apartment from east at south

    Feb 4, 2026 · Apt 1C

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at penthouse 3h, 3rd story, 6th penthouse from west at north

    Jan 17, 2026 · Apt 3H

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building front entrance at public hall, 1st story

    Jan 5, 2026

    Closed — Violation closed

DOB building violations · 42

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 20, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 30, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 30, 2020

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2019

    Dob violation - resolved
Show 32 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 17, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 14, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 14, 2016

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2015

    Mar 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 25, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 25, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 5, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 22, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 21, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 9, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    3p2379

    Dec 9, 1998

    Dob violation - resolved
  • Elevator elevatorrequired

    3p2380

    Dec 9, 1998

    Dob violation - resolved
  • Zoning none

    Z-zoning none

    Sep 19, 1995

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    2

    Jun 28, 1993

    Dob violation - dismissed
  • Elevator elevatoroptional

    2

    Oct 12, 1989

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) eliminate scraping on main track

    Aug 23, 1988

    Dob violation - resolved
  • Elevator elevatorrequired

    (29)eliminate noise on machine (7)repair gov. (51)provide lock for motor room

    Aug 23, 1988

    Dob violation - resolved

ECB violations · 24

  • Class - 2

    Misaligned cab mirror. provide keys to basement level and roof/machine room as per 8.1.1. (d).

    May 12, 2025

    Resolve
  • Class - 2

    Misaligned cab mirror. provide keys to basement level and roof/machine room as per 8.1.1. (d).

    May 12, 2025

    Resolve
  • Class - 2

    Failure to post or property post permit for work @premises. observed four workers from jacbobs telecommunication in working on roof for installation artena & boxes under permit #b0008519-i1-an with exp.date

    Jul 17, 2019 · Penalty $312

    Resolve
  • Class - 1

    05x10,02x10,40p16. 05x10-repair door zone restrictor; 02x10-repair alarm bell; 40p16-no access to elevator machine room.

    Aug 2, 2018

    Resolve
  • Class - 1

    5a10,16j10,40p16. 5a10-cease use item. door zone restrictor has been tampered with disabled and rendered inoperative. this is a safety device to ensure elevator passengers safety. repair restrictor and contact

    Jul 2, 2018

    Resolve
  • Class - 2

    40z10,68b7,52m7,59bb5,70o2. 40a10-water leak in machine room; 68b7-maintenance log insufficient not up to date; 52m7-cable guards missing provide; 59bb5-brake maintenance expried tag; 70oz-clean dirty pit.

    Apr 4, 2018

    Resolve
  • Class - 3

    Failure to maintiain building in a code compliant manner.noted:at front of building,exposure 1,left outer court fire escape(west side)6th flr balcony is obstructed with 2 flower pots and various cables going in

    Mar 26, 2017 · Penalty $100

    Resolve
  • Class - 2

    Unapproved unsafe unsuitable electrical equipment devices materials appliances or wiring in use.expose electrical wiring in door frame garbage room on the 4th floor.rem:comply with ec code.

    Mar 24, 2014 · Penalty $400

    Resolve
  • Class - 2

    B254,15,16,50a,b,c. 50a- peep hole glass missing. 50b- remove high profile security box from boiler room and flex hose from fresh air intakefor boiler use. 50c- fire chamber door improper closing.

    Feb 5, 2014

    Resolve
  • Class - 2

    16b11,16m07,70z02,16r09,16h11,40b11,61g11,52q03,40r09,56y13,59h11,40i04,68m07,41w06,16p07,14j01,77m07. 16b-lobby braille tag-not designated lobby. 16m-missing on r level. 70z-water in pt. 16r-grill on wrongside

    Jul 20, 2010 · Penalty $250

    Resolve
Show 14 more ↓
  • Class - 2

    08v01,16m02,16b11,70z02,53b14,77m07,41w06,41d06,41i11,40r09,60q03,59e01,59y11,59h11,56y13,61g11,42g11,40y02,52q03,40b11,40i04,68m07,16h11,16p07,39y02,37y02. 08v-adjust. 16m-braille tags on both sides. 16b-provi

    Jul 20, 2010 · Penalty $250

    Resolve
  • Class - 3

    16b13.2q3.40p16.16b lobby hoist side door pull 20q roof hoist door

    Mar 23, 2010 · Penalty $100

    Resolve
  • Class - 2

    97x10.97x remedy:make repairs restorte to service

    Mar 23, 2010

    Resolve
  • Non-hazardous

    No exit sign. upon inspection at the above property building housed approx 78 tennant on 6 floors and there is no eixt sign remedy : maintain exit sign as per code

    Mar 10, 2004

    Resolve
  • Non-hazardous

    10m07/67m07/32q06/79u16/55x11. 10m 2nd gib missing..67m toe guard missing. 32q properly servide wiring top of car 79u nyc device #tags.

    Dec 3, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    46f16,58o02,59o02.

    Feb 29, 2000 · Penalty $350

    Resolve
  • Hazardous

    17i12,10e11,27m07,31q 11,37g07,46h15,47h15,57o02,75u05. 10e- buttons sticking. 27m- no down final only dir limit. 31q- main motor. 46h- counter weight landing. cease use of this device unitl cease use items c

    Feb 24, 2000 · Penalty $500

    Resolve
  • Non-hazardous

    Failure to maintain building defect is: plaster is cracked missing falling beams are exposed due to water leaken in both bedroom closets. remedy: repair ceiling and walls of both closets..

    Jan 10, 1997 · Penalty $1,000

    Resolve
  • Non-hazardous

    14i,15l,17i,.

    Oct 28, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    Exceeding scope of work approved under permit #300352632-01-az.in that a direct expansion condensing unit w/dimension 4x3x1/2 serial # 2194 x00454 208/230 volts is installed at rear yard illegally.remedy discon

    Sep 12, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    Worked without a permit in that a direct expansion condensing unit dimension 4ft high x 3ft wide x 1ft. 6"thickness with serial# 2194x00454 manufacturers # 781897 @208/230v is installed and in operat

    Aug 16, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    02l,11q.

    Jan 17, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    11q,14m,15l,18m,35p,57o,(18)covers (35)unable to gain access to motor room to complete inspection

    Jul 2, 1991

    Resolve
  • Non-hazardous

    05l,11q,14m,15l,35p,57o,(35)unable to gain access to motor room to complete inspection

    Jun 25, 1991 · Penalty $75

    Resolve

Complaints

  • Paint/plaster

    Wall

    Oct 5, 2026 · Apt 2L

    Open
  • Unsanitary condition

    Pests

    Oct 5, 2026 · Apt 2L

    Open
  • Unsanitary condition

    Pests

    Oct 5, 2026 · Apt 2L

    Open
  • General

    Cabinet

    Oct 5, 2026 · Apt 2L

    Open
  • Water leak

    Slow leak

    Oct 5, 2026 · Apt 2L

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Sep 14, 2026 · Apt 2L

    Close
  • General

    Cabinet

    Sep 14, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Sep 14, 2026 · Apt 2L

    Close
  • Electric

    Lighting

    Sep 8, 2026 · Apt 2G

    Close
  • Water leak

    Heavy flow

    Sep 8, 2026 · Apt 2G

    Close
Show 40 more ↓
  • Water leak

    Heavy flow

    Aug 18, 2026 · Apt 2G

    Close
  • Paint/plaster

    Ceiling

    Aug 18, 2026 · Apt 2G

    Close
  • Paint/plaster

    Wall

    Aug 18, 2026 · Apt 2G

    Close
  • Paint/plaster

    Ceiling

    Aug 12, 2026 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Aug 3, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Jul 19, 2026 · Apt 6B

    Close
  • Plumbing

    Bathtub/shower

    Jul 19, 2026 · Apt 6B

    Close
  • Water leak

    Slow leak

    Jul 19, 2026 · Apt 6B

    Close
  • Safety

    Fire escape

    Jul 4, 2026 · Apt 2G

    Close
  • Safety

    Fire escape

    Jul 3, 2026 · Apt BLDG

    Close
  • General

    Cabinet

    May 28, 2026 · Apt 1K

    Close
  • Flooring/stairs

    Floor

    May 28, 2026 · Apt 1K

    Close
  • Plumbing

    Basin/sink

    May 28, 2026 · Apt 1K

    Close
  • Unsanitary condition

    Pests

    May 28, 2026 · Apt 1K

    Close
  • Door/window

    Door

    May 28, 2026 · Apt 1K

    Close
  • Unsanitary condition

    Mold

    May 28, 2026 · Apt 1K

    Close
  • Paint/plaster

    Wall

    May 28, 2026 · Apt 1K

    Close
  • Electric

    Power outage

    May 14, 2026 · Apt 6H

    Close
  • Paint/plaster

    Ceiling

    May 14, 2026 · Apt 6H

    Close
  • Paint/plaster

    Wall

    May 14, 2026 · Apt 6H

    Close
  • Unsanitary condition

    Pests

    May 14, 2026 · Apt 6H

    Close
  • Plumbing

    Bathtub/shower

    May 14, 2026 · Apt 6H

    Close
  • Plumbing

    Basin/sink

    May 14, 2026 · Apt 6H

    Close
  • Elevator

    Maintenance

    May 12, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    May 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 19, 2026 · Apt 2K

    Close
  • Paint/plaster

    Door/frame

    Apr 13, 2026 · Apt 2L

    Open
  • Unsanitary condition

    Mold

    Apr 13, 2026 · Apt 2L

    Open
  • Paint/plaster

    Ceiling

    Apr 13, 2026 · Apt 2L

    Open
  • Unsanitary condition

    Mold

    Apr 12, 2026 · Apt 5I

    Close
  • Water leak

    Slow leak

    Apr 10, 2026 · Apt 2G

    Close
  • Electric

    Outlet/switch

    Apr 10, 2026 · Apt 2G

    Close
  • Paint/plaster

    Ceiling

    Apr 6, 2026 · Apt 2L

    Close
  • General

    Cabinet

    Apr 6, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Apr 6, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 4, 2026 · Apt 6M

    Close
  • Water leak

    Slow leak

    Mar 24, 2026 · Apt 4L

    Close
  • Heat/hot water

    Apartment only

    Mar 19, 2026 · Apt 3H

    Close
  • Plumbing

    Bathtub/shower

    Mar 6, 2026 · Apt 6B

    Close
  • Plumbing

    Basin/sink

    Mar 6, 2026 · Apt 6B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1931
Floors
6
Residential units
77
Building area
75,798 ft²
Lot area
17,973 ft²
Zoning
R6
Community board
309
Council district
40
Block / lot
5045 / 78
Assessed value
$3,247,650
Landmark / historic district
No

HPD registration #305951, last renewed Jan 2, 2026.

Questions about 55 Winthrop Street

Who owns 55 Winthrop Street?

The owner of record in NYC Department of City Planning PLUTO data is 45-55 Realty Co.

Does 55 Winthrop Street have violations?

Yes. NYC HPD has recorded 2,312 housing violations at this property.

Is 55 Winthrop Street rent stabilized?

NYC Department of Finance tax bills listed 77 rent-stabilized units here in 2024 (about 100% of its 77 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 55 Winthrop Street built?

City records list 1931 as the year it was built.

How many apartments are in 55 Winthrop Street?

It has 77 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.