55 Winthrop Street
Brooklyn, NY 11225BBL 3-05045-0078Map
Owner of record: 45-55 Realty Co
55 Winthrop Street is an elevator apartment building built in 1931 in Brooklyn, 11225. It has 77 residential units across 6 floors. The owner of record is 45-55 Realty Co. HPD has recorded 2,312 housing violations here, most recently on September 27, 2026. 18 of the 50 most recent violations are still open. City tax records listed 77 rent-stabilized apartments here in 2024.
- HPD violations
- 2,312
- DOB violations
- 42
- ECB violations
- 24
- HPD complaints
- 3,730
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2,312
- BHazardous
Properly secure the loose marble tread at intermediate landing, 2nd from bottom up at east section at public hall stairs, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
Replace with new the missing guardrail and handrail at stair below grade, southeast section, building's front yard at fire passage way
Sep 27, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4l, 4th story, 2nd apartment from north at east
Jul 28, 2026 · Apt 4L
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4l, 4th story, 2nd apartment from north at east
Jul 28, 2026 · Apt 4L
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 6th story
Jul 28, 2026
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south
Jul 21, 2026 · Apt 6B
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective wash basin faucet in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south
Jul 21, 2026 · Apt 6B
Open — Violation will be reinspected - ANon-hazardous
Repair the leaky and/or defective faucets at shower head and fixtures in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south
Jul 21, 2026 · Apt 6B
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 6b, 6th story, 3rd apartment from east at south
Jul 21, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from north at east located at apt 6b, 6th story, 3rd apartment from east at south
Jul 21, 2026 · Apt 6B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line in the bathtub in the bathroom located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trims in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6h, 6th story, 3rd apartment from west at north
May 19, 2026 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 6th story
May 13, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''
Apr 16, 2026 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''
Apr 16, 2026 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the apartment door in the entrance located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''
Apr 16, 2026 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 5i, 5th story, 2nd apartment from west at north , section ''east''
Apr 16, 2026 · Apt 5I
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the kitchen located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''
Apr 16, 2026 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''
Apr 16, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''
Apr 16, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout in between tiles at north east and west walls in the bathroom located at apt 2l, 2nd story, 2nd apartment from west at north , section ''west''
Apr 16, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 2g, 2nd story, 1st apartment from east at south , section ''east''
Apr 16, 2026 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling. in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchen located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall. in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4l, 4th story, 2nd apartment from west at north , section ''west''
Apr 11, 2026 · Apt 4L
Closed — Violation dismissed - CImmediately hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Open — Not complied with - BHazardous
Repair the roof so that it will not leak over ceiling in the 6th room from north located at apt 6b, 6th story, 3rd apartment from east at south , section ''west''
Apr 11, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 1l, 1st story, 2nd apartment from west at north
Feb 19, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 6th apartment from west at north
Feb 19, 2026 · Apt 3H
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 1a, 1st story, 6th apartment from east at south
Feb 19, 2026 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 2nd apartment from west at north
Feb 19, 2026 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at cailing in the 2nd room from east located at apt 1c, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
Jan 23, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at penthouse 3h, 3rd story, 6th penthouse from west at north
Jan 17, 2026 · Apt 3H
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance at public hall, 1st story
Jan 5, 2026
Closed — Violation closed
DOB building violations · 42
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2019
Dob violation - resolved
Show 32 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 2016
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2015
Mar 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 5, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 9, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
3p2379
Dec 9, 1998
Dob violation - resolved - Elevator elevatorrequired
3p2380
Dec 9, 1998
Dob violation - resolved - Zoning none
Z-zoning none
Sep 19, 1995
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 28, 1993
Dob violation - dismissed - Elevator elevatoroptional
2
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51) eliminate scraping on main track
Aug 23, 1988
Dob violation - resolved - Elevator elevatorrequired
(29)eliminate noise on machine (7)repair gov. (51)provide lock for motor room
Aug 23, 1988
Dob violation - resolved
ECB violations · 24
- Class - 2
Misaligned cab mirror. provide keys to basement level and roof/machine room as per 8.1.1. (d).
May 12, 2025
Resolve - Class - 2
Misaligned cab mirror. provide keys to basement level and roof/machine room as per 8.1.1. (d).
May 12, 2025
Resolve - Class - 2
Failure to post or property post permit for work @premises. observed four workers from jacbobs telecommunication in working on roof for installation artena & boxes under permit #b0008519-i1-an with exp.date
Jul 17, 2019 · Penalty $312
Resolve - Class - 1
05x10,02x10,40p16. 05x10-repair door zone restrictor; 02x10-repair alarm bell; 40p16-no access to elevator machine room.
Aug 2, 2018
Resolve - Class - 1
5a10,16j10,40p16. 5a10-cease use item. door zone restrictor has been tampered with disabled and rendered inoperative. this is a safety device to ensure elevator passengers safety. repair restrictor and contact
Jul 2, 2018
Resolve - Class - 2
40z10,68b7,52m7,59bb5,70o2. 40a10-water leak in machine room; 68b7-maintenance log insufficient not up to date; 52m7-cable guards missing provide; 59bb5-brake maintenance expried tag; 70oz-clean dirty pit.
Apr 4, 2018
Resolve - Class - 3
Failure to maintiain building in a code compliant manner.noted:at front of building,exposure 1,left outer court fire escape(west side)6th flr balcony is obstructed with 2 flower pots and various cables going in
Mar 26, 2017 · Penalty $100
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices materials appliances or wiring in use.expose electrical wiring in door frame garbage room on the 4th floor.rem:comply with ec code.
Mar 24, 2014 · Penalty $400
Resolve - Class - 2
B254,15,16,50a,b,c. 50a- peep hole glass missing. 50b- remove high profile security box from boiler room and flex hose from fresh air intakefor boiler use. 50c- fire chamber door improper closing.
Feb 5, 2014
Resolve - Class - 2
16b11,16m07,70z02,16r09,16h11,40b11,61g11,52q03,40r09,56y13,59h11,40i04,68m07,41w06,16p07,14j01,77m07. 16b-lobby braille tag-not designated lobby. 16m-missing on r level. 70z-water in pt. 16r-grill on wrongside
Jul 20, 2010 · Penalty $250
Resolve
Show 14 more ↓
- Class - 2
08v01,16m02,16b11,70z02,53b14,77m07,41w06,41d06,41i11,40r09,60q03,59e01,59y11,59h11,56y13,61g11,42g11,40y02,52q03,40b11,40i04,68m07,16h11,16p07,39y02,37y02. 08v-adjust. 16m-braille tags on both sides. 16b-provi
Jul 20, 2010 · Penalty $250
Resolve - Class - 3
16b13.2q3.40p16.16b lobby hoist side door pull 20q roof hoist door
Mar 23, 2010 · Penalty $100
Resolve - Class - 2
97x10.97x remedy:make repairs restorte to service
Mar 23, 2010
Resolve - Non-hazardous
No exit sign. upon inspection at the above property building housed approx 78 tennant on 6 floors and there is no eixt sign remedy : maintain exit sign as per code
Mar 10, 2004
Resolve - Non-hazardous
10m07/67m07/32q06/79u16/55x11. 10m 2nd gib missing..67m toe guard missing. 32q properly servide wiring top of car 79u nyc device #tags.
Dec 3, 2002 · Penalty $180
Resolve - Non-hazardous
46f16,58o02,59o02.
Feb 29, 2000 · Penalty $350
Resolve - Hazardous
17i12,10e11,27m07,31q 11,37g07,46h15,47h15,57o02,75u05. 10e- buttons sticking. 27m- no down final only dir limit. 31q- main motor. 46h- counter weight landing. cease use of this device unitl cease use items c
Feb 24, 2000 · Penalty $500
Resolve - Non-hazardous
Failure to maintain building defect is: plaster is cracked missing falling beams are exposed due to water leaken in both bedroom closets. remedy: repair ceiling and walls of both closets..
Jan 10, 1997 · Penalty $1,000
Resolve - Non-hazardous
14i,15l,17i,.
Oct 28, 1995 · Penalty $1,000
Resolve - Non-hazardous
Exceeding scope of work approved under permit #300352632-01-az.in that a direct expansion condensing unit w/dimension 4x3x1/2 serial # 2194 x00454 208/230 volts is installed at rear yard illegally.remedy discon
Sep 12, 1995 · Penalty $1,000
Resolve - Non-hazardous
Worked without a permit in that a direct expansion condensing unit dimension 4ft high x 3ft wide x 1ft. 6"thickness with serial# 2194x00454 manufacturers # 781897 @208/230v is installed and in operat
Aug 16, 1995 · Penalty $1,000
Resolve - Non-hazardous
02l,11q.
Jan 17, 1995 · Penalty $1,000
Resolve - Non-hazardous
11q,14m,15l,18m,35p,57o,(18)covers (35)unable to gain access to motor room to complete inspection
Jul 2, 1991
Resolve - Non-hazardous
05l,11q,14m,15l,35p,57o,(35)unable to gain access to motor room to complete inspection
Jun 25, 1991 · Penalty $75
Resolve
Complaints
- Paint/plaster
Wall
Oct 5, 2026 · Apt 2L
Open - Unsanitary condition
Pests
Oct 5, 2026 · Apt 2L
Open - Unsanitary condition
Pests
Oct 5, 2026 · Apt 2L
Open - General
Cabinet
Oct 5, 2026 · Apt 2L
Open - Water leak
Slow leak
Oct 5, 2026 · Apt 2L
Open - Unsanitary condition
Garbage/recycling storage
Sep 14, 2026 · Apt 2L
Close - General
Cabinet
Sep 14, 2026 · Apt 2L
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 2L
Close - Electric
Lighting
Sep 8, 2026 · Apt 2G
Close - Water leak
Heavy flow
Sep 8, 2026 · Apt 2G
Close
Show 40 more ↓
- Water leak
Heavy flow
Aug 18, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Aug 18, 2026 · Apt 2G
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Aug 12, 2026 · Apt 1L
Close - Water leak
Heavy flow
Aug 3, 2026 · Apt 6B
Close - Plumbing
Bathtub/shower
Jul 19, 2026 · Apt 6B
Close - Plumbing
Bathtub/shower
Jul 19, 2026 · Apt 6B
Close - Water leak
Slow leak
Jul 19, 2026 · Apt 6B
Close - Safety
Fire escape
Jul 4, 2026 · Apt 2G
Close - Safety
Fire escape
Jul 3, 2026 · Apt BLDG
Close - General
Cabinet
May 28, 2026 · Apt 1K
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 1K
Close - Plumbing
Basin/sink
May 28, 2026 · Apt 1K
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 1K
Close - Door/window
Door
May 28, 2026 · Apt 1K
Close - Unsanitary condition
Mold
May 28, 2026 · Apt 1K
Close - Paint/plaster
Wall
May 28, 2026 · Apt 1K
Close - Electric
Power outage
May 14, 2026 · Apt 6H
Close - Paint/plaster
Ceiling
May 14, 2026 · Apt 6H
Close - Paint/plaster
Wall
May 14, 2026 · Apt 6H
Close - Unsanitary condition
Pests
May 14, 2026 · Apt 6H
Close - Plumbing
Bathtub/shower
May 14, 2026 · Apt 6H
Close - Plumbing
Basin/sink
May 14, 2026 · Apt 6H
Close - Elevator
Maintenance
May 12, 2026 · Apt BLDG
Close - Door/window
Door
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 19, 2026 · Apt 2K
Close - Paint/plaster
Door/frame
Apr 13, 2026 · Apt 2L
Open - Unsanitary condition
Mold
Apr 13, 2026 · Apt 2L
Open - Paint/plaster
Ceiling
Apr 13, 2026 · Apt 2L
Open - Unsanitary condition
Mold
Apr 12, 2026 · Apt 5I
Close - Water leak
Slow leak
Apr 10, 2026 · Apt 2G
Close - Electric
Outlet/switch
Apr 10, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Apr 6, 2026 · Apt 2L
Close - General
Cabinet
Apr 6, 2026 · Apt 2L
Close - Unsanitary condition
Mold
Apr 6, 2026 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Apr 4, 2026 · Apt 6M
Close - Water leak
Slow leak
Mar 24, 2026 · Apt 4L
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 3H
Close - Plumbing
Bathtub/shower
Mar 6, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Mar 6, 2026 · Apt 6B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1931
- Floors
- 6
- Residential units
- 77
- Building area
- 75,798 ft²
- Lot area
- 17,973 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 40
- Block / lot
- 5045 / 78
- Assessed value
- $3,247,650
- Landmark / historic district
- No
HPD registration #305951, last renewed Jan 2, 2026.
Questions about 55 Winthrop Street
Who owns 55 Winthrop Street?
The owner of record in NYC Department of City Planning PLUTO data is 45-55 Realty Co.
Does 55 Winthrop Street have violations?
Yes. NYC HPD has recorded 2,312 housing violations at this property.
Is 55 Winthrop Street rent stabilized?
NYC Department of Finance tax bills listed 77 rent-stabilized units here in 2024 (about 100% of its 77 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 55 Winthrop Street built?
City records list 1931 as the year it was built.
How many apartments are in 55 Winthrop Street?
It has 77 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.