291 Fenimore Street
Brooklyn, NY 11225BBL 3-05039-0075Map
Owner of record: Pinkdiam Holdings LLC
291 Fenimore Street is a walk-up apartment building built in 2018 in Brooklyn, 11225. It has 7 residential units across 4 floors. The owner of record is Pinkdiam Holdings LLC. HPD has recorded 47 housing violations here, most recently on June 3, 2026. 33 of the 47 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 47
- DOB violations
- 8
- ECB violations
- 16
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 3, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jun 3, 2026
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 3, 2026
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 3, 2026
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing
Jun 3, 2026
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Jun 3, 2026
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story
Apr 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Apr 24, 2025
Closed — Violation dismissed
Show 37 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Apr 24, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling north and east wall in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Apr 24, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling north and east wall in the 3rd room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Apr 24, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 24, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story
Apr 24, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing at public hall, 1st story
Apr 24, 2025
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ,.. at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at west wall at public hall, 3rd story
Nov 3, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at west wall at public hall, 2nd story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at west wall at public hall, 2nd story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors at west wall at public hall stairs, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Nov 3, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of house hold items at public hall stairs, 1st story
Nov 3, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Mar 15, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 15, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Mar 15, 2024
Open — Nov sent out - BHazardous
Refit door in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Nov certified late - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 15, 2024
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 15, 2024
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Nov certified late - BHazardous
Refit door to terrace in the 1st room from north at east located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Open — Nov certified late - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 15, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq ft at ceiling in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from east at south
Mar 15, 2024 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq ft at ceiling in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from east at south original violation 16745471 issued 15-mar-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 15, 2024 · Apt 3F
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 8, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 8, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 8, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 8, 2019
Vp*-violation unserved ecb- dismissed
ECB violations · 16
- Class - 1
Owner failed to ensure construction worker successfully completed the required training under bc3321.1.victor manuel lejasanic on site for which a construction superintendent is required.victor manuel lejasonic
May 2, 2019
Resolve - Class - 1
Owner failed to ensure construction worker successfully completed the required training under bc3321.1 at time of inspection of a 4 story building i observed fredis calderon on site for which a construction sup
May 2, 2019
Resolve - Class - 1
General contractor failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection ofa 4 story building,i observed fredis calderon on site for which a cons
May 2, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per seciton requirement.note:at time of inspeciton of an actiev new building construction site i observed poor housekeeping throughout entire site items include debris
May 2, 2019
Resolve - Class - 1
General contractor failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection ofa 4 story building,i observed victor manuel lejasanic on site for whic
May 2, 2019
Resolve - Class - 1
General contractor failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection ofa 4 story building,i observed william calderson on site for which a co
May 2, 2019
Resolve - Class - 1
General contractor failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection ofa 4 story building i observed armondo calderon on site for which a con
May 2, 2019
Resolve - Class - 1
Failure to maintain safety equipment measures or temporary construction-inadequate guardrails.at time of inspection of a 4 story new building under construction,i observed on inadequate guardrail system at expo
May 2, 2019 · Penalty $2,500
Resolve - Class - 2
Bc3303.7.2/fire extinguisher not maintained as per code.at time of inspection of a 4 story new building under construction,i observed several fire extinguishers that were not mounted 3'-5'off of the ground.seve
May 2, 2019 · Penalty $250
Resolve - Class - 1
Owner failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection of a 4 story building,i observed william calderon on site for which a construction su
May 2, 2019
Resolve
Show 6 more ↓
- Class - 1
Owner failed to ensure construction worker successfully completed the required training under bc3321.1.at time of inspection of a 4 story building i observed armando calderon on site for which a construction su
May 2, 2019
Resolve - Class - 2
Construction superintendent failed to perform duties as per code. at the time of inspection it was observed that under the supervision of joshua bail,the super failed to perform his duties by not ensuring that
Jan 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures of temporary construction. at the time of inspection it was observed that the contractor failed to institute/install temporary guardrails to prevent all
Jan 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/display on site document required by chapter 33. at the time of inspection it was observed that the contractor failed toprovide site safety plans. as per code the ssp is to be maintained on
Jan 8, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33. at the time of inspection the contractor failed to provide/produce theinspection reports for the sidewalk shed the special inspections repor
Jan 8, 2019 · Penalty $625
Resolve - Class - 2
Electrical work w/o a permit. at the time of inspection it was observed that the contractor had temporary work installed throughout the jobsite but did not have an electrical permit for temporary construciton
Jan 8, 2019 · Penalty $400
Resolve
Complaints
- Water leak
Slow leak
May 18, 2026 · Apt 3F
Close - Door/window
Door
May 18, 2026 · Apt 3F
Close - General
Bell/buzzer/intercom
May 18, 2026 · Apt 3F
Close - Water leak
Heavy flow
Apr 6, 2025 · Apt 3F
Close - Water leak
Damp spot
Apr 6, 2025 · Apt 3F
Close - Water leak
Slow leak
Apr 6, 2025 · Apt 3F
Close - Paint/plaster
Wall
Apr 6, 2025 · Apt 3F
Close - Water leak
Slow leak
Mar 6, 2024 · Apt 3F
Close - General
Cabinet
Mar 6, 2024 · Apt 3F
Close - Unsanitary condition
Pests
Mar 6, 2024 · Apt 3F
Close
Show 3 more ↓
- Door/window
Door
Mar 6, 2024 · Apt 3F
Close - Door/window
Door frame
Mar 6, 2024 · Apt 3F
Close - Unsanitary condition
Mold
Mar 6, 2024 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2018
- Floors
- 4
- Residential units
- 7
- Building area
- 6,300 ft²
- Lot area
- 2,100 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 40
- Block / lot
- 5039 / 75
- Assessed value
- $936,000
- Landmark / historic district
- No
HPD registration #389196, last renewed Jul 30, 2025.
Questions about 291 Fenimore Street
Who owns 291 Fenimore Street?
The owner of record in NYC Department of City Planning PLUTO data is Pinkdiam Holdings LLC.
Does 291 Fenimore Street have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 291 Fenimore Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 43% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 291 Fenimore Street built?
City records list 2018 as the year it was built.
How many apartments are in 291 Fenimore Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.