3216 Farragut Road
Brooklyn, NY 11210BBL 3-05007-0043Map
Owner of record: 3216 Farragut Road LLC
3216 Farragut Road is a walk-up apartment building built in 1920 in Brooklyn, 11210. It has 10 residential units across 4 floors. The owner of record is 3216 Farragut Road LLC. HPD has recorded 51 housing violations here, most recently on September 19, 2025. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 51
- DOB violations
- 7
- ECB violations
- 17
- HPD complaints
- 53
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard lawn
Sep 19, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 17, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak west wall and ceiling in the 1st room from north located at apt 4c lower level, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household at compactor room at public hall, 4th story
Apr 17, 2023
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 20 sq ft at ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4C
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulk around sink in the kitchenette located at apt 4c, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Apr 17, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at east wall in the foyer located at apt 4d, 4th story, 1st apartment from east at south
Mar 15, 2023 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
Mar 15, 2023 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
Mar 15, 2023 · Apt 4D
Closed — Violation closed
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... approximately 1sqft at ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north original violation 15749557 issued 01-mar-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective connection at wasteline under sink in the kitchen located at apt 4c, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical switch at south in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Mar 1, 2023
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 1sqft at ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4c upper level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall, north wall in the 1st room from north located at apt 4c lower level, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the entire apartment located at apt 4c, 4th story, 1st apartment from west at north
Mar 1, 2023 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south
Feb 3, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at wasteline pipe at sink in the kitchen located at apt 4a, 4th story, 1st apartment from north at east
Apr 30, 2022 · Apt 4A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 4a, 4th story, 1st apartment from north at east
Apr 30, 2022 · Apt 4A
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above ceiling in the 2nd room from north located at apt 4a, 4th story, 1st apartment from north at east
Apr 30, 2022 · Apt 4A
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 15, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 15, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 15, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 15, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Nov 15, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Oct 29, 2021
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs landings and floors at all stories at public hall
Oct 29, 2021
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system at south wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from east at south
Oct 17, 2021 · Apt 4C
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 17, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 17, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 17, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Oct 17, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 17, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 17, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Oct 17, 2021
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electric wire exposed at south wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north
Oct 17, 2021 · Apt 4C
Closed — Violation closed - ANon-hazardous
Refit door at west wall upper level in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north
Oct 17, 2021 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from west at north
Oct 17, 2021 · Apt 4C
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 17
- Class - 2
Failure to maintain adequate housekeeping per section reuqirmeents note at exposure #1 on front wall at ground level two workers installed styrofoam insulation for stucco work or four story building no proper
May 26, 2020
Resolve - Class - 2
Failure to provide design drawings for temporary construction platform.at the time of inspection i observed a temporary platform made of c-joist and plank with a piece of plywood to walk on in 3rd floor apartme
Oct 24, 2019
Resolve - Class - 1
Failru to institue maintain safety equipment measures for temporary construction no guard rails.at the time of inspection i observed at exp#1 on balcony supported scaffold missing guard rails.this is a hazardou
Oct 24, 2019
Resolve - Class - 2
Bc 3307.2.3 temporary public walkway within the site. at the time of inspection i observed active construction site. work in progress. i also observed missing protection(safety netting) between construction fen
Sep 16, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1. at the time of inspection i observed active construction site. when i asked ro
Sep 16, 2019
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker successfully completed the required training under bc 3321.1. at the time of inspection i observed active construction site. when i asked ro
Sep 16, 2019
Resolve - Class - 1
Bc 3314.1 supported scaffold does not meet code specification. at the time of inspection i observed active construction site,supported scaffold in place at exp#1 and exp#3. i also observed missing midrails in f
Sep 16, 2019 · Penalty $625
Resolve - Class - 1
Manufactures specifications. at time of inspection observed yodock barricade system in street at exp#1. barricade system was not completely locked together or filled halfway w/water or sand. not following manuf
Jul 27, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3303.4.1.1 sidewalk not maintained. at time of inspection observed sidewalk outside of rolling gate at exp#1 w/numerous uneven flags w/1-2 inch high tripping hazards. asphalt patch was totally uneven with
Jul 27, 2019 · Penalty $625
Resolve - Class - 1
3301.9.26:maintenance of sidewlak shed parapet at time of inspection observed numerous missing parapet panels on sidewalk shed at exposure #2 exposure #2 is direction adjacent to neighboring property front door
Jul 27, 2019 · Penalty $625
Resolve
Show 7 more ↓
- Class - 2
Sec. 3307.6.4.9 avoid interference at time of inspection observed sidewalk shed at exp#1 in front of site built & concealing from public view alternate site ofd street dot parking signs not allowing public the
Jul 27, 2019
Resolve - Class - 1
Bc3309.10/missing and inadequate roof protection of adjacent property.at the time of inspection i observed active construction site work in progress ,roof protection of adjacent property at exp#2 is not protect
Jul 11, 2019
Resolve - Class - 1
Failure to institute/maintain safety equiptment measures or temporary construction no guard rails.at the time of inspection i observed active construction site supported scaffold in place at exp#1 and at exp#3
Jul 11, 2019 · Penalty $2,500
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided.at the time of inspection i observed active construction site sws in place at exp#1 missing parapet panel information.rem:com
Jul 11, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. observed contractor doing work from scaffold for installation 1 1/2" styrofoam insulation & stucco,the styrofoam dust & debris all other the
Jun 7, 2019
Resolve - Non-hazardous
Work without a permit note new brick facade erected at first story at north east and west sides and second story at north and west sides illegally changing building construction classifications approx 70% of wo
Jun 15, 2004 · Penalty $250
Resolve - Hazardous
Residence altered as dwelling for more than the legally approved number of families. cellar converted into sheeping quarters. alteration work noted erected full partitions creating two sleeping rooms. full kitc
May 11, 2000 · Penalty $3,050
Resolve
Complaints
- Unsanitary condition
Pests
Oct 5, 2026 · Apt 4D
Open - Unsanitary condition
Garbage/recycling storage
Aug 29, 2025 · Apt 1
Close - Electric
Power outage
Jun 3, 2024 · Apt 4D
Close - Electric
No lighting
May 1, 2023 · Apt 4C
Close - Unsanitary condition
Pests
Mar 14, 2023 · Apt 4D
Close - Unsanitary condition
Garbage/recycling storage
Mar 14, 2023 · Apt 4D
Close - Outside building
Roofing
Mar 14, 2023 · Apt 4D
Close - Paint/plaster
Ceiling
Mar 14, 2023 · Apt 4D
Close - Unsanitary condition
Pests
Mar 14, 2023 · Apt 4D
Close - Unsanitary condition
Mold
Mar 14, 2023 · Apt 4D
Close
Show 40 more ↓
- Electric
Wiring
Mar 14, 2023 · Apt 4D
Close - Water leak
Heavy flow
Mar 14, 2023 · Apt 4D
Close - Heat/hot water
Entire building
Mar 14, 2023 · Apt 4D
Close - Plumbing
Basin/sink
Mar 14, 2023 · Apt 4C
Close - Electric
Wiring
Mar 14, 2023 · Apt 4C
Close - Electric
Wiring
Mar 14, 2023 · Apt 4C
Close - General
Bell/buzzer/intercom
Mar 14, 2023 · Apt 4C
Close - Unsanitary condition
Mold
Mar 14, 2023 · Apt 4C
Close - Water leak
Slow leak
Mar 14, 2023 · Apt 4C
Close - Water leak
Heavy flow
Mar 7, 2023 · Apt 4A
Close - Unsanitary condition
Mold
Mar 1, 2023 · Apt 4C
Close - Heat/hot water
Apartment only
Mar 1, 2023 · Apt 4C
Close - Paint/plaster
Ceiling
Mar 1, 2023 · Apt 4C
Close - Water leak
Slow leak
Mar 1, 2023 · Apt 4C
Close - Paint/plaster
Wall
Mar 1, 2023 · Apt 4C
Close - Electric
Wiring
Mar 1, 2023 · Apt 4C
Close - Paint/plaster
Door/frame
Mar 1, 2023 · Apt 4C
Close - Paint/plaster
Ceiling
Mar 1, 2023 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 2, 2023 · Apt 3B
Close - Paint/plaster
Ceiling
Dec 7, 2022 · Apt 4A
Close - Unsanitary condition
Mold
Dec 7, 2022 · Apt 4A
Close - Water leak
Heavy flow
Dec 7, 2022 · Apt 4A
Close - Plumbing
Basin/sink
Apr 27, 2022 · Apt 4A
Close - Safety
Window guard broken/missing
Apr 27, 2022 · Apt 4A
Close - Water leak
Slow leak
Apr 27, 2022 · Apt 4A
Close - Unsanitary condition
Mold
Jan 11, 2022 · Apt BASEME
Close - Plumbing
Toilet
Jan 11, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 30, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 25, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 24, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 17, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 16, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 12, 2021 · Apt 4D
Close - General
Mailbox
Oct 19, 2021 · Apt 4D
Close - Electric
Wiring
Oct 19, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Oct 19, 2021 · Apt 4D
Close - General
Cabinet
Oct 14, 2021 · Apt 4D
Close - Electric
Wiring
Oct 14, 2021 · Apt 4D
Close - Electric
Lighting
Oct 14, 2021 · Apt 4D
Close - Heat/hot water
Entire building
Oct 14, 2021 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 10
- Building area
- 9,183 ft²
- Lot area
- 3,417 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 45
- Block / lot
- 5007 / 43
- Assessed value
- $637,200
- Landmark / historic district
- No
HPD registration #389509, last renewed Aug 24, 2025.
Questions about 3216 Farragut Road
Who owns 3216 Farragut Road?
The owner of record in NYC Department of City Planning PLUTO data is 3216 Farragut Road LLC.
Does 3216 Farragut Road have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 3216 Farragut Road rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 40% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3216 Farragut Road built?
City records list 1920 as the year it was built.
How many apartments are in 3216 Farragut Road?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.