3415 Farragut Road
Brooklyn, NY 11210BBL 3-04998-0004Map
Owner of record: 435 Marion LLC
3415 Farragut Road is an elevator apartment building built in 2019 in Brooklyn, 11210. It has 42 residential units across 7 floors. The owner of record is 435 Marion LLC. HPD has recorded 37 housing violations here, most recently on October 4, 2026. 25 of the 37 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 37
- DOB violations
- 14
- ECB violations
- 31
- HPD complaints
- 74
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 50 sq ft aggregate observed at ceiling near air vents at public hall, 3rd story
Oct 4, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 6a, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 6a, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6a, 6th story, 1st apartment from east at south
Sep 16, 2026 · Apt 6A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at north wall in the 1st room from north located at apt 3e, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling at public hall, 3rd story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 2nd story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling, south and west walls at public hall stairs, 2nd story
Sep 16, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south and west walls at public hall stairs, 2nd story
Sep 16, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 4, 2026
Open — Nov sent out
Show 27 more ↓
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 4, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from south at west
May 28, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
May 28, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 28, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 5d, 5th story, 2nd apartment from west at north
Mar 11, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 5d, 5th story, 2nd apartment from west at north
Mar 11, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the 1st room from north at east located at apt 6d, 6th story, 2nd apartment from west at north
Feb 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north at east located at apt 6d, 6th story, 2nd apartment from west at north
Feb 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Feb 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 6d, 6th story, 2nd apartment from west at north
Feb 1, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling and east wall at public hall stairs, 7th story, section ''a''
Jan 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling and east wall at public hall stairs, 7th story, section ''a''
Jan 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall stairs, 7th story, section ''a''
Jan 30, 2026
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink, low volume in the kitchen located at apt 5e, 5th story, 1st apartment from east at south
Jan 28, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building front entrance door , 1st story
Jan 28, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Jun 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jun 7, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed
DOB building violations · 14
- Construction other optional
Failure to comply with commissioner's order:dob violation #031225cfa01 701yc required the immediate 100% hands on inspection of all facades b y a pe/ra and submit a report to facades via email immediately.as of 6 /30/26,no hands on inspection submitted to facades unit.remedy:comply with dob violation #031225cfa01701yc immediately
Jun 30, 2026
Dob violation - active - Construction other optional
Ftm due to obsrved unsf facde condit @ exp2 w.elev obsrved fallen off eifs stucco wall, loose eifs stucco wall from roofedge to 6fl. a large portion of eifs stucco wall are missing from the exter wall. remdy: immedly retain service of nys rdp to inspect/evalute 100% ofhands-on of unsf facde condit.submit photo of corrction & reprt to [email protected]
Mar 12, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - dismissed - Construction other optional
Failure to respond to objections issued for tpp audit for inadequate tenant protection plan for job #b00930975-i1.
Mar 26, 2024
Dob violation - dismissed - Construction other optional
.partial vacate order on 03/12/24 by a dacade inspector there is a larged area of exterior.insulation existing inising system wall fallin off thesen
Mar 18, 2024
Dob violation - active - Construction other optional
Emergency work order to secure unsafe facade in the following of incid ent 42936.the fallen exterior insulation finishing system at exp2 west elev.for the safety of public,owner is required to provide safety meas ures at other exposures.remedy:immediately provide safety measures suc h as sws at exp1 south elev,exp2,exp3 north elev,exp4 east elev,cyard
Mar 12, 2024
Dob violation - active - Construction other optional
. at time of inspection observed area of foam panels and stucco (approx.. 50ft x 20ft ) at 7th sty level have become detached from building and fallen to pedestrian sidewalk at exp.1.
Mar 11, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed
Show 4 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed
ECB violations · 31
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39108320r as of 4/1/2026., file a certificate o
Apr 1, 2026 · Penalty $625
Resolve - Class - 1
Unlawfully continued work on notice of a stop work order. observed on 1st floor commercial space mechanical unit and ducts are 100% complete and in operation against swo #3986163 issued 12/02/24., comply with s
Apr 1, 2026 · Penalty $10,000
Resolve - Class - 2
Atoi observed in commercial space at ground level illegal install of mechanical hvac duct system without permit .approximately 65% work complete., obtain all permits; obtain permit
Dec 2, 2024 · Penalty $625
Resolve - Class - 1
Failure to maintain building walls and appurtenances. at time of inspection, i observed damaged e.i.f.s. stucco surface on balcony deck edge(6 floor b line) at exposure(1) south elevation. and large area of e.i
Mar 12, 2024 · Penalty $6,250
Resolve - Class - 1
Area of foam panels and stucco (approx.. 50ft x 20ft ) have become detached from building and fallen to pedestrian sidewalk., maintain exterior building wall
Mar 11, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to provide unobstructed exit passageway noted:atoi observed@exp2 there has been trench dug aprx12" deep this partially obstructs egress from adj property rear door.remove obstruction
Nov 23, 2021
Resolve - Class - 1
Housekeeping note:at the time of my inspection of a 7 story building topped off at roof no work in progress i observed a large pile of construction debris accumulated at exposure# 2 obstructing egress from stai
Sep 8, 2021 · Penalty $625
Resolve - Class - 2
Condition of fence note:at time of my inspection of a 7 story buildingtopped of roof no work in progress,i observed that a section of jobsite fence is leaning towards the sidewalk and in danger overturning.whil
Sep 8, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. no guardrails. at time of inspection observed an active construction site w/interior work in progress. during inspection noted
Jun 15, 2021 · Penalty $2,500
Resolve - Class - 2
Sec. bc 3301.2 failure to provide overhead protection. at time of inspection observed an active construction site w/interior work in progress. during inspection noted that there is no overhead protection at exp
Jun 15, 2021
Resolve
Show 21 more ↓
- Class - 2
Sec. bc 3314.4.8 failure to perform maintenance at support scaffold. at time of inspection observed an active construction site w/interior work in progress. during inspection noted a supported scaffold at exp#4
Jun 15, 2021
Resolve - Class - 2
Temporary construction equipment on site - expired permit. noted: at time of inspection i observed construction fence in place with permit of fence expired on 10/29/2020. remedy: renew permit
Dec 14, 2020 · Penalty $625
Resolve - Class - 1
Bc1704.1.2.3 based on the findings of ceu & 5205ie respondent failed to perform tr-1 special inspection duties/special inspector duties.special inspections non-compliance items include but not limited to the
Jul 16, 2020 · Penalty $2,500
Resolve - Class - 1
Based on the findings of ceu audit,the respondent failed to meet the requirements of code 1rcny 101-06 section c4.special inspector kennedyogbuokin,steven gransham,andres ortega,rajvinder kaur & shane cotanese
Jul 16, 2020 · Penalty $2,500
Resolve - Class - 1
Bc107 ac28-104.7.1, bc1707.1.1 indadequate design documents/drawings. based on the findings of ceu audit,the respondent failed to perform registered design professional of record duties-non-compliance items inc
Jul 16, 2020
Resolve - Class - 1
3307.4 skirting around trailers note: @time of my inspection of a 7 sty building @5th sty stage. no work in progress i observed a contractors office trailer in from, of sws @exp4 @ e 35 street w/o any skirting,
Dec 24, 2019
Resolve - Class - 2
3307.2.1 failure to comply with dot regulations note: @time of inspection of a 7 sty building under const @5th, sty stage, no work in progress, i observed that pedestrian walker under sidewalk shed was broken
Dec 24, 2019 · Penalty $625
Resolve - Class - 2
Access denied to a jobsite at the time of my inspection of 7 story building proposed currently on 4th floor i observed workers working on 3rd floor exp #4 i knocked on teh door several time no one open the door
Dec 23, 2019 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. as noted:at time of my inspection of a 7 story buildingat 4 fl level observed splices connection different (2)moment connecti
Dec 13, 2019 · Penalty $1,250
Resolve - Class - 1
Expired/no licence. note:at the time of my inspection of a proposed 7story building the dob records indicate that the gc licence of m&y developers inc,lic#600255 was expired since11/08/19.without a valid liense
Nov 20, 2019
Resolve - Class - 1
Netting.note:at the time of my inspection i observed that there was inadequate / no netting on the cable/guardrail system throughout the perimeter at expo#1,2,3 and4 as well as the stairs,vertical netting had l
Nov 20, 2019
Resolve - Class - 1
Guardrails.note:at the time of my inspection ofa proposed 7story building work in progress i observed a worker standing on top of a supported scaffold wigh no guardrail system in place the lack of guardrails cr
Nov 20, 2019
Resolve - Class - 1
Housekeeping.note:at the time of my inspection of a proposed 7story building,i observed while going up and down the metal stairs that there were several locations that was uneven and not filled in with temporar
Nov 20, 2019
Resolve - Class - 1
Work and storage zone. note:at the time of my inspection of a proposed 7story building with work in progress,i observed a work and storage zone at expo#1 grade level adjacent to the sidewalk shed and roadway,i
Nov 20, 2019
Resolve - Class - 1
Roof protection.note: at the time of my inspection of a proposed 7 story building with work in progress.i observed that the garage located at exp#4 was not provided with any roof protection.the adjacent garage
Nov 20, 2019
Resolve - Class - 2
28-105.5 forms filed with dob do not have required signatures. as noted at time of inspection on any 7 story active jobsite tr2 concrete sampling and testing () code sc 131212002 at line 5 which list the
May 16, 2019
Resolve - Class - 1
Bc 912.5 back flow protection at water pump. at time of inspection at a jobsite currently excavation phase,i observed concrete operations inprogress,workers using fire hydrant pump w/o use of back flow diverter
May 16, 2019 · Penalty $625
Resolve - Class - 1
3303.7 fire prevention/protection/equipment access at the constructionor demolition site. at time of inspection at a jobsite currently excavation phase i observed workers using fire hydrant pump at exp 1 for co
May 16, 2019 · Penalty $625
Resolve - Class - 2
Failure to perform proper concrete operations. at time of inspection at a jobsite currently excavation phase i observed concrete operations,concrete being poured at exp 4,i also observed worker washing out conc
May 16, 2019 · Penalty $2,500
Resolve - Class - 2
Fence;at time of inspection of a new bldg and construction @ excavation stage at time jobe site i observed that the entire perimeter of jobsite was missing at expo#2 creating a danger of intruders or others to
Feb 28, 2019 · Penalty $400
Resolve - Class - 1
3301.4.1maintenance of areas used by the public. observed severely cr acked sidewalk at exposure 1 posing a tripping hazard swo issued pursuant to 28-207.2 and posted at premises. remedy: stop all work except t
May 21, 2015 · Penalty $1,600
Resolve
Complaints
- Electric
Power outage
Oct 2, 2026 · Apt 7A
Open - Heat/hot water
Apartment only
Oct 2, 2026 · Apt 7A
Open - Unsanitary condition
Mold
Sep 30, 2026 · Apt 3G
Close - General
Signage missing
Sep 13, 2026 · Apt FRONTD
Close - Unsanitary condition
Mold
Sep 13, 2026 · Apt FRONTD
Close - Unsanitary condition
Mold
Sep 13, 2026 · Apt 3E
Close - Door/window
Door
Sep 13, 2026 · Apt 3E
Close - Water leak
Heavy flow
Sep 10, 2026 · Apt 6A
Close - General
Ventilation system
Sep 10, 2026 · Apt 6A
Close - Door/window
Window frame
Sep 10, 2026 · Apt 6A
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 6, 2026 · Apt 7C
Close - Plumbing
Radiator
Aug 6, 2026 · Apt 7C
Close - Paint/plaster
Ceiling
Aug 6, 2026 · Apt 7C
Close - General
Bell/buzzer/intercom
Jun 25, 2026 · Apt 6B
Close - General
Mailbox
Jun 25, 2026 · Apt 6B
Close - General
Signage missing
May 25, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
May 25, 2026 · Apt 3E
Close - Water leak
Slow leak
May 24, 2026 · Apt 2E
Close - Water leak
Damp spot
May 14, 2026 · Apt 3E
Close - Appliance
Refrigerator
May 14, 2026 · Apt 3E
Close - Unsanitary condition
Garbage/recycling storage
Mar 18, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 6E
Close - Unsanitary condition
Mold
Mar 18, 2026 · Apt 6E
Close - Door/window
Door
Mar 12, 2026 · Apt 3D
Close - Water leak
Damp spot
Mar 12, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Mar 12, 2026 · Apt 3D
Close - Electric
Lighting
Mar 12, 2026 · Apt 3D
Close - Electric
Lighting
Mar 12, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Mar 1, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Feb 26, 2026 · Apt 3E
Close - Electric
Lighting
Feb 25, 2026 · Apt 4D
Close - Electric
Lighting
Feb 25, 2026 · Apt 4D
Close - Paint/plaster
Wall
Feb 25, 2026 · Apt 4D
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 4D
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 5G
Close - Water leak
Damp spot
Feb 3, 2026 · Apt 3E
Close - Appliance
Refrigerator
Feb 3, 2026 · Apt 3E
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 7A
Close - Paint/plaster
Ceiling
Jan 30, 2026 · Apt 6D
Close - Water leak
Heavy flow
Jan 30, 2026 · Apt 6D
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 7A
Close - Water leak
Heavy flow
Jan 29, 2026 · Apt 5D
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 2E
Close - Outside building
Roofing
Jan 29, 2026 · Apt 3A
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Jan 29, 2026 · Apt 3A
Close - Electric
Lighting
Jan 29, 2026 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2019
- Floors
- 7
- Residential units
- 42
- Building area
- 40,877 ft²
- Lot area
- 13,922 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 45
- Block / lot
- 4998 / 4
- Assessed value
- $3,347,550
- Landmark / historic district
- No
HPD registration #390044, last renewed Jul 8, 2026.
Questions about 3415 Farragut Road
Who owns 3415 Farragut Road?
The owner of record in NYC Department of City Planning PLUTO data is 435 Marion LLC.
Does 3415 Farragut Road have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 3415 Farragut Road rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3415 Farragut Road built?
City records list 2019 as the year it was built.
How many apartments are in 3415 Farragut Road?
It has 42 residential units and 43 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.