330 Lenox Road
Brooklyn, NY 11226BBL 3-04853-0035Map
Owner of record: Unavailable Owner
330 Lenox Road is an elevator apartment building built in 1964 in Brooklyn, 11226. It has 118 residential units across 6 floors. The owner of record is Unavailable Owner. HPD has recorded 243 housing violations here, most recently on September 12, 2026. 38 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 243
- DOB violations
- 50
- ECB violations
- 18
- HPD complaints
- 428
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 243
- BHazardous
Properly repair or replace the broken or defective ventilation system at south wall in the bathroom located at apt 2u, 2nd story, 1st apartment from east at south
Sep 12, 2026 · Apt 2U
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tile at south wall in the kitchen located at apt 2u, 2nd story, 1st apartment from east at south
Sep 12, 2026 · Apt 2U
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2u, 2nd story, 1st apartment from east at south
Sep 12, 2026 · Apt 2U
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at north wall in the 4th room from north located at apt ll2, 1st apartment from west at north
Aug 1, 2026 · Apt LL2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Aug 1, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt ll2, 1st apartment from west at north
Jul 15, 2026 · Apt LL2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt ll2, 1st apartment from west at north
Jul 15, 2026 · Apt LL2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt ll2, 1st story, 1st apartment from west at north
May 21, 2026 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the private hallway located at apt ll2, 1st story, 1st apartment from west at north
May 21, 2026 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 4th room from east located at apt ll2, 1st story, 1st apartment from west at north
May 21, 2026 · Apt LL2
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Cleanse to the satisfaction of this department the floor in the 2nd room from east at south located at apt ll2, 1st story, 1st apartment from west at north
Mar 31, 2026 · Apt LL2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt ll2, 1st story, 1st apartment from west at north
Sep 12, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the foyer located at bsmt-apt ll2, 1st bsmt-apt from west at north
Aug 30, 2025 · Apt LL2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 2nd bedroom from east at north located at bsmt-apt ll2
Aug 30, 2025 · Apt LL2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the bathroom located at apt 3e, 3rd story, 3rd apartment from west at north
Aug 1, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 3e, 3rd story, 3rd apartment from west at north
Aug 1, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Replace with new the missing electrical outlet cover at north wall in the 2nd room from north located at apt 3e, 3rd story, 3rd apartment from west at north
Aug 1, 2025 · Apt 3E
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the kitchen located at apt 3e, 3rd story, 3rd apartment from west at north
Aug 1, 2025 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 3rd apartment from west at north
Aug 1, 2025 · Apt 3E
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor door at compactor closet, 2nd story
May 1, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand installed at lundry room door at laundry room, 2nd story
May 1, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 3rd story
Jun 5, 2024
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3t, 3rd story, 1st apartment from west at north
Jun 5, 2024 · Apt 3T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 3t, 3rd story, 1st apartment from west at north
Jun 5, 2024 · Apt 3T
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3t, 3rd story, 1st apartment from west at north
Jun 5, 2024 · Apt 3T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective oven door at range in the kitchen located at apt 3t, 3rd story, 1st apartment from west at north
Jun 5, 2024 · Apt 3T
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock at fire escape window in the 1st room from east at south located at apt 3t, 3rd story, 1st apartment from west at north
Jun 5, 2024 · Apt 3T
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick stand at boiler room at basement story
Mar 19, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at laundry room, 6th story
Mar 19, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... observed approx 2sqft of mold at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south original violation 16143595 issued 06-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 6, 2023 · Apt 2A
Open — Defect letter issued - ANon-hazardous
Properly repair with similar material the broken or defective 1sqft wooden baseboard in the kitchen located at apt 2k, 3rd story, 1st apartment from north at east
Aug 6, 2023 · Apt 2K
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed approx 2sqft of mold at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 6, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx 3sqft at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 6, 2023 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4h, 4th story, 1st apartment from west at north
Sep 14, 2022 · Apt 4H
Open — Notice of issuance sent to tenant - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 21, 2020
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north at west located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction materials at central court
Feb 17, 2020
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at north wall aprox = 12 sq ft in the 1st room from north at west located at bsmt-apt ll1, 1st bsmt-apt from east at south original violation 13606753 issued 17-feb-20 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Feb 17, 2020 · Apt LL1
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall aprox = 12 sq ft in the 1st room from north at west located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at west located at bsmt-apt ll1, 1st bsmt-apt from east at south
Feb 17, 2020 · Apt LL1
Open — Nov sent out
DOB building violations · 50
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Feb 18, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2014
Dob violation - resolved
Show 40 more ↓
- Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 2, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Construction other optional
C-construction other optional
Jun 25, 2002
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Elevator elevatorrequired
(74)provide capacity plate
May 18, 1990
Dob violation - resolved - Elevator elevatorrequired
(74)provide capacity plate
May 18, 1990
Dob violation - resolved
ECB violations · 18
- Class - 1
Failure to safeguard parking structure, to secure public safety and/ormake the building's structure and appurtenances conform to the provisions of the administrative code after unsafe notification filed by qpsi
May 21, 2025 · Penalty $25,000
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 23, 2020
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 23, 2020
Resolve - Class - 1
*42x10,14j01,67l10,70y02,17h11,17d06,32h11,37y02,39y02,76q03,56y13,68b07,40r09,61g11. *cease use item 47r-inopertive door positioning monitor; 14j-adjust for full view of cab; 67l-one way transmission; 70,37,
Dec 18, 2017 · Penalty $1,000
Resolve - Class - 2
Work without permit.note:having constructed structure approx 11ft widex16ft long and approx 11ft in height.constructed with bricks and shingle roof.4 window openings and one door also a/c sleeve and electrical
Mar 7, 2016 · Penalty $2,000
Resolve - Non-hazardous
21q03/28q03/38o02/34q03/66o02/84x10 21-q lobby lock 34-q top of car 84-x door close button
Aug 5, 2003 · Penalty $350
Resolve - Non-hazardous
84x10/24x10/08l10/11l10/16l10/28j10/06j10/15i11/84x10/28q03/38o02/66o02/84#10 08-l false stops 11-l 5fl button ng.16-l,4fl door jumps track 2806-j-repair operator gate contract and door clutch for proper operat
Aug 5, 2003 · Penalty $880
Resolve - Non-hazardous
Failure to maintain adeqiuate housekeeping noted: stacks of black plastic bags, consist of debris and obstructing the fire escape drop ladder at court yard. (2) wood, old charis, old doors, and mattresses are s
Jan 9, 2003 · Penalty $500
Resolve - Hazardous
Failure to safeguard public & property affected by construction operations : construction being preformed on roof causing a 4 alram fire major structure damage to apt's 7u, 7v, 7n, 7t, 7m, 7r, 7l, 7s, 7p, 7k, s
Jun 25, 2002
Resolve - Non-hazardous
75u05/ 73o02/ 21x11/ 74x11/ 39h08/ 974) door close button (39) unequal rope height
Mar 13, 2002
Resolve
Show 8 more ↓
- Non-hazardous
57d06,39h08,10x11.10x-door open button.
Aug 30, 2000 · Penalty $180
Resolve - Non-hazardous
39h08,08v01
Feb 28, 2000 · Penalty $2,500
Resolve - Non-hazardous
54d06,39m08,08v01
Feb 28, 2000 · Penalty $2,500
Resolve - Non-hazardous
50y,39h,20l,73o.
Jun 22, 1999 · Penalty $2,500
Resolve - Non-hazardous
50y,39h,20l,73o.
Jun 22, 1999 · Penalty $2,500
Resolve - Non-hazardous
73x,. (73) restore elevator service for complete inspection.
Apr 2, 1996 · Penalty $100
Resolve - Non-hazardous
02b 14m 16h 28h 73 perform 5 yr test and file elv3
Jan 24, 1991 · Penalty $150
Resolve - Non-hazardous
02m 09h 10l 14m 18q 16h 57o 35o 73 18 provide cover on interlocks 73 perform 5yr test and file form elv3
Jan 24, 1991 · Penalty $150
Resolve
Complaints
- Water leak
Damp spot
Oct 5, 2026 · Apt LL2
Open - Unsanitary condition
Mold
Oct 5, 2026 · Apt LL2
Open - General
Ventilation system
Aug 29, 2026 · Apt 2U
Close - Water leak
Slow leak
Aug 29, 2026 · Apt 2U
Close - Plumbing
Basin/sink
Aug 29, 2026 · Apt 2U
Close - Unsanitary condition
Mold
Jul 31, 2026 · Apt LL2
Close - Unsanitary condition
Mold
Jul 28, 2026 · Apt LL2
Close - Unsanitary condition
Mold
Jul 15, 2026 · Apt LL2
Close - Flooring/stairs
Floor
Jul 15, 2026 · Apt LL2
Close - Water leak
Slow leak
Jul 15, 2026 · Apt LL2
Close
Show 40 more ↓
- Paint/plaster
Wall
Jul 15, 2026 · Apt LL2
Close - Unsanitary condition
Mold
Jul 10, 2026 · Apt LL2
Close - Water leak
Slow leak
Jul 10, 2026 · Apt LL2
Close - Flooring/stairs
Floor
May 20, 2026 · Apt LL2
Close - Paint/plaster
Wall
May 20, 2026 · Apt LL2
Close - Unsanitary condition
Mold
May 20, 2026 · Apt LL2
Close - Unsanitary condition
Mold
Mar 3, 2026 · Apt LL2
Close - Unsanitary condition
Mold
Feb 23, 2026 · Apt LL2
Close - Flooring/stairs
Floor
Feb 23, 2026 · Apt LL2
Close - Paint/plaster
Wall
Feb 23, 2026 · Apt LL2
Close - Paint/plaster
Ceiling
Feb 23, 2026 · Apt LL2
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 6D
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 3H
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 6Y
Close - Flooring/stairs
Floor
Sep 5, 2025 · Apt LL2
Close - Paint/plaster
Wall
Sep 5, 2025 · Apt LL2
Close - Flooring/stairs
Floor
Aug 24, 2025 · Apt LL2
Close - Paint/plaster
Ceiling
Aug 24, 2025 · Apt LL2
Close - Unsanitary condition
Mold
Aug 24, 2025 · Apt LL2
Close - Paint/plaster
Wall
Aug 24, 2025 · Apt LL2
Close - Unsanitary condition
Pests
Jul 30, 2025 · Apt 3E
Close - Plumbing
Radiator
Jul 30, 2025 · Apt 3E
Close - Plumbing
Toilet
Jul 30, 2025 · Apt 3E
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 3E
Close - Electric
Outlet/switch
Jul 30, 2025 · Apt 3E
Close - Plumbing
Water supply
Jul 30, 2025 · Apt 3E
Close - Water leak
Damp spot
Feb 24, 2025 · Apt 3T
Close - Paint/plaster
Wall
Feb 24, 2025 · Apt 3T
Close - Heat/hot water
Entire building
Jan 31, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 6, 2024 · Apt 3T
Close - Appliance
Electric/gas range
Apr 6, 2024 · Apt 3T
Close - General
Cabinet
Apr 6, 2024 · Apt 3T
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 26, 2026 | $432,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1964
- Floors
- 6
- Residential units
- 118
- Building area
- 112,518 ft²
- Lot area
- 30,025 ft²
- Zoning
- R7-1
- Community board
- 317
- Council district
- 40
- Block / lot
- 4853 / 35
- Assessed value
- $4,721,400
- Landmark / historic district
- No
HPD registration #373726, last renewed Aug 31, 2025.
Questions about 330 Lenox Road
Who owns 330 Lenox Road?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 330 Lenox Road have violations?
Yes. NYC HPD has recorded 243 housing violations at this property.
Is 330 Lenox Road rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 9% of its 118 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 330 Lenox Road built?
City records list 1964 as the year it was built.
How many apartments are in 330 Lenox Road?
It has 118 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.