631 East 96 Street
Brooklyn, NY 11236BBL 3-04756-0022Map
Owner of record: E96 Realty LLC
631 East 96 Street is a walk-up apartment building built in 1940 in Brooklyn, 11236. It has 6 residential units across 3 floors. The owner of record is E96 Realty LLC. HPD has recorded 192 housing violations here, most recently on June 12, 2026. 4 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2018.
- HPD violations
- 192
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 254
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 192
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Jun 12, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Jun 12, 2026 · Apt 2F
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Jun 12, 2026 · Apt 2F
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 3rd story
Jun 12, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Jun 12, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick stand installed at building entrance door , 1st story
Jun 12, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 3rd story
Jun 12, 2026
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door at bulkhead , 3rd story
Jun 12, 2026
Open — Invalid certification - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration walls erected from floor to ceiling consisting of sheetrock and studs, approximately 6' x 4', used to create closet/storage room in the 3rd room from east at south located at apt 1f, 1st story, apartment at south
Jun 12, 2026 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door sweep in the entrance located at apt 2f, 2nd story, 1st apartment from south at west
Jun 12, 2026 · Apt 2F
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
Jun 12, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Jun 12, 2026 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Jun 12, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Jun 12, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Dec 26, 2025 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 2r, 2nd story, 1st apartment from north at east
Dec 26, 2025 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof door at public hall
Feb 5, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead
Aug 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at b-room #1 located at apt bldg, 1st story, 1st apartment from west at north
Aug 15, 2022 · Apt BLDG
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at the wash basin in the the community bathroom located at apt 1r, 1st story, 1st apartment from north at east
Feb 8, 2022 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from north at east
Feb 8, 2022 · Apt 3F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of householed items at public hall, 3rd story
Feb 8, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 3rd story
Mar 12, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 12, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 12, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 12, 2021
Closed — Violation closed - BHazardous
Install and maintain sufficient light or lights of at least 100 watts incandescent or equivalent each, to light adequately from sunset to sunrise the south yard
Oct 11, 2018
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items and discarded construction material at the 2nd and 3rd story balconies of the south stack
Oct 11, 2018
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator stored at public hall, 1st story
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall
Sep 17, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Sep 17, 2018
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Aug 27, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 21, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Feb 21, 2018
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with doors intact at public hall, 3rd story
Feb 21, 2018
Closed — Violation closed - IInformation / order
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Feb 1, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood decking & asphalt material at roof.
Dec 9, 2015
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of wood/sheetrock partition erected and other remnants of partitions remaining at cellar
Dec 9, 2015
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections ; water closet and wash basin at cellar
Dec 9, 2015
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the mattress at cellar
Dec 9, 2015
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling & walls at public hall, 1st story
Dec 9, 2015
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Dec 9, 2015
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling & walls at public hall, 2nd story
Dec 9, 2015
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling & walls at public hall, 2nd story
Dec 9, 2015
Closed — Violation closed
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Due to fire on second floor
Aug 2, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 3
- Non-hazardous
Failure to maintain building: as noted: at the third floor of a 3 storied 6 families walk-up brick framed structure walls in the stairway have cracks at various locations, loose broken and chipped walls are
Jun 7, 2005 · Penalty $180
Resolve - Non-hazardous
Failure to maintian building defect is brickwork cracked at various locations at sooth bearing wall remedy make all necessary repairs obtain structural stablity report from arclutect or engineer
Jan 6, 1999
Resolve - Non-hazardous
Failur eto maitain building defect is palster is cracked and falling in apt 1 bedrom kitcchen and living room remedy make all necessary repairs
Jan 4, 1999
Resolve
Complaints
- Unsanitary condition
Mold
Apr 27, 2024 · Apt 3R2
Close - Unsanitary condition
Garbage/recycling storage
Mar 9, 2024 · Apt BLDG
Close - General
Mailbox
Aug 11, 2022 · Apt LOBBY
Close - Safety
Fire escape
Nov 15, 2021 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 8, 2021 · Apt BLDG
Close - Safety
Fire escape
May 8, 2021 · Apt BLDG
Close - General
Mailbox
May 8, 2021 · Apt 3R
Close - Appliance
Electric/gas range
Oct 4, 2018 · Apt 2R
Close - Appliance
Electric/gas range
Oct 4, 2018 · Apt 1F
Close - Appliance
Electric/gas range
Oct 4, 2018 · Apt 3F
Close
Show 40 more ↓
- Electric
Lighting
Oct 4, 2018 · Apt BLDG
Close - Safety
Fire escape
Oct 4, 2018 · Apt BLDG
Close - Electric
Power outage
Aug 29, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 29, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 29, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 29, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 24, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 24, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Aug 24, 2018 · Apt 3F
Close - Heat/hot water
Apartment only
Apr 22, 2018 · Apt 3F
Close - Flooring/stairs
Floor
Jan 1, 2018 · Apt 3F
Close - Door/window
Window frame
Jan 1, 2018 · Apt 3F
Close - Electric
Lighting
Dec 29, 2015 · Apt 1F
Close - Paint/plaster
Ceiling
Dec 29, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Dec 29, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Dec 29, 2015 · Apt 1F
Close - Water leak
Slow leak
Dec 29, 2015 · Apt 1F
Close - Water leak
Slow leak
Dec 29, 2015 · Apt 1F
Close - Flooring/stairs
Floor
Dec 29, 2015 · Apt 1F
Close - Paint/plaster
Wall
Dec 29, 2015 · Apt 1F
Close - Plumbing
Radiator
Dec 29, 2015 · Apt 1F
Close - Unsanitary condition
Mold
Dec 29, 2015 · Apt 1F
Close - Door/window
Door
Dec 28, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2015 · Apt 1F
Close - Outside building
Roof door/hatch
Dec 28, 2015 · Apt BLDG
Close - Door/window
Door
Dec 28, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2015 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 29, 2015 · Apt 3R
Close - Heat/hot water
Entire building
Mar 5, 2015 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Jan 18, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 18, 2015 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 9, 2015 · Apt 3R
Close - Unsanitary condition
Pests
Jan 6, 2015 · Apt 1F
Close - Unsanitary condition
Pests
Jan 6, 2015 · Apt 1F
Close - Water leak
Heavy flow
Jan 6, 2015 · Apt 1F
Close - General
Cabinet
Jan 6, 2015 · Apt 1F
Close - Paint/plaster
Wall
Jan 6, 2015 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1940
- Floors
- 3
- Residential units
- 6
- Building area
- 5,250 ft²
- Lot area
- 3,000 ft²
- Zoning
- R5
- Community board
- 317
- Council district
- 42
- Block / lot
- 4756 / 22
- Assessed value
- $327,600
- Landmark / historic district
- No
HPD registration #335191, last renewed Jul 10, 2025.
Questions about 631 East 96 Street
Who owns 631 East 96 Street?
The owner of record in NYC Department of City Planning PLUTO data is E96 Realty LLC.
Does 631 East 96 Street have violations?
Yes. NYC HPD has recorded 192 housing violations at this property.
Is 631 East 96 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2018 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 631 East 96 Street built?
City records list 1940 as the year it was built.
How many apartments are in 631 East 96 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.