336 East 91 Street
Brooklyn, NY 11212BBL 3-04645-0031Map
Owner of record: Bsd91 LLC
336 East 91 Street is a walk-up apartment building built in 1931 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is Bsd91 LLC. HPD has recorded 128 housing violations here, most recently on July 15, 2026. 3 of the 50 most recent violations are still open.
- HPD violations
- 128
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 196
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 128
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jul 15, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling, north wall, east wall. west wall and south wall at basement at public hall
Nov 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires throughout ceiling and walls at basement at public hall
Nov 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulding front entrance door , 1st story
Nov 18, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at front door at basement at public hall
Nov 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at rear door at basement at public hall
Nov 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room at basement at public hall
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling and electrical outlet at west wall in the 5th room from east located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Jan 21, 2025
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling and electrical outlet at east wall in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling and electrical outlet at east wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixtures at ceiling and electrical outlet at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Jan 21, 2025 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east
Sep 20, 2024 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at building front entrance door , 1st story
Sep 20, 2024
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1f, 1st story, 1st apartment from north at east
Sep 20, 2024 · Apt 1F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east
Sep 20, 2024 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Sep 20, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and south walls in the bathroom located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at front entrance to building , 1st story
Jan 28, 2022
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexi-glass panel installed at front entrance door to building , 1st story
Jan 28, 2022
Open — Not complied with - BHazardous
Provide glass panel at front entrance door to building , 1st story
Jan 28, 2022
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at vestibule at public hall, 1st story
Jan 28, 2022
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of water bottles, flower pot, and household items at public hall, 2nd story
Jan 28, 2022
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the west wall above entrance door in the foyer located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 5th room from east located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood base inside cabinet under sink at west wall in the kitchen located at apt 3, 2nd story, 1st apartment from north at east
Jan 28, 2022 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 5th room from east located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from east located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective shut off valve at radiator in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 3, 2nd story, 1st apartment from east at south
Dec 6, 2021 · Apt 3
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling and south wall at public hall, 2nd story
Aug 27, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at east located at apt 3, 2nd story, 1st apartment from west at north
Aug 27, 2021 · Apt 3
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the foyer located at apt 3, 2nd story, 1st apartment from west at north
Aug 27, 2021 · Apt 3
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jul 5, 2026 · Apt 2FENTI
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 19, 2024 · Apt 1F
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 23, 2021 · Apt 3
Close - Plumbing
Basin/sink
Nov 12, 2021 · Apt 3
Close - Unsanitary condition
Pests
Nov 12, 2021 · Apt 3
Close - Plumbing
Radiator
Nov 12, 2021 · Apt 3
Close
Show 40 more ↓
- Plumbing
Radiator
Nov 12, 2021 · Apt 3
Close - Plumbing
Bathtub/shower
Nov 12, 2021 · Apt 3
Close - Unsanitary condition
Pests
Nov 12, 2021 · Apt 3
Close - Water leak
Heavy flow
Oct 21, 2021 · Apt 3
Close - Paint/plaster
Ceiling
Oct 21, 2021 · Apt 3
Close - Paint/plaster
Cabinet
Oct 21, 2021 · Apt 3
Close - Paint/plaster
Ceiling
Oct 21, 2021 · Apt 3
Close - Water leak
Heavy flow
Aug 22, 2021 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Aug 17, 2021 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Jul 28, 2021 · Apt 3
Close - Unsanitary condition
Pests
Jul 28, 2021 · Apt 3
Close - Unsanitary condition
Pests
Jun 28, 2021 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Mar 22, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2019 · Apt 3
Close - Door/window
Door
Jun 30, 2018 · Apt 3
Close - Plumbing
Basin/sink
Jun 30, 2018 · Apt 3
Close - General
Bell/buzzer/intercom
Jun 30, 2018 · Apt 3
Close - General
Bell/buzzer/intercom
Jun 30, 2018 · Apt 3
Close - Door/window
Door frame
Jun 30, 2018 · Apt 3
Close - Unsanitary condition
Pests
Jun 30, 2018 · Apt 3
Close - Door/window
Window pane
Jun 30, 2018 · Apt 3
Close - Paint/plaster
Wall
Apr 19, 2018 · Apt 3
Close - Door/window
Door
Apr 19, 2018 · Apt 3
Close - Unsanitary condition
Pests
Apr 12, 2018 · Apt 3
Close - Door/window
Window pane
Apr 12, 2018 · Apt 3
Close - Plumbing
Basin/sink
Apr 12, 2018 · Apt 3
Close - Heat/hot water
Entire building
Dec 15, 2017 · Apt 3
Close - General
Cabinet
Dec 12, 2017 · Apt 3
Close - Unsanitary condition
Pests
Dec 12, 2017 · Apt 3
Close - Unsanitary condition
Pests
Dec 12, 2017 · Apt 3
Close - Door/window
Door
Dec 12, 2017 · Apt 3
Close - Safety
Fire escape
Dec 12, 2017 · Apt 3
Close - Heat/hot water
Entire building
Dec 12, 2017 · Apt BLDG
Close - Door/window
Door frame
Oct 18, 2017 · Apt 3
Close - Plumbing
Basin/sink
Oct 18, 2017 · Apt 3
Close - Door/window
Window frame
Oct 18, 2017 · Apt 3
Close - Door/window
Window frame
Oct 18, 2017 · Apt 3
Close - Door/window
Door frame
Aug 23, 2017 · Apt 3
Close - Unsanitary condition
Pests
Aug 23, 2017 · Apt 3
Close - Plumbing
Basin/sink
Aug 23, 2017 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,664 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4645 / 31
- Assessed value
- $219,600
- Landmark / historic district
- No
HPD registration #303376, last renewed Sep 29, 2025.
Questions about 336 East 91 Street
Who owns 336 East 91 Street?
The owner of record in NYC Department of City Planning PLUTO data is Bsd91 LLC.
Does 336 East 91 Street have violations?
Yes. NYC HPD has recorded 128 housing violations at this property.
Is 336 East 91 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 336 East 91 Street built?
City records list 1931 as the year it was built.
How many apartments are in 336 East 91 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.