210 East 51 Street is a walk-up apartment building built in 1931 in Brooklyn, 11203. It has 37 residential units across 4 floors. The owner of record is 210 East 51st Street, LLC. HPD has recorded 318 housing violations here, most recently on October 6, 2026. 31 of the 50 most recent violations are still open. City tax records listed 35 rent-stabilized apartments here in 2024.

HPD violations
318
DOB violations
13
ECB violations
2
HPD complaints
224

What to know

Concern
20 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
35
About 95% of the building's 37 apartments
Down from 36 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 318

  • B

    M/d law abate the nuisance consisting of plexi glass at vestibule door at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • B

    Provide outlet cover at 1st story public hall south wall at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Oct 6, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Oct 6, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective spring balance, upper and lower sash at east wall in the 1st room from east at south located at apt b20, 4th story, 2nd apartment from north at east

    Oct 6, 2026 · Apt B20

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock mechanism at apartment door in the entrance located at apt b20, 4th story, 2nd apartment from north at east

    Oct 6, 2026 · Apt B20

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected subdividing 1 room into 2 in the 3rd room from east at south located at apt b5, 2nd story, 1st apartment from south at west , section at south

    Aug 20, 2026 · Apt B5

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at rear yard

    Aug 20, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt b19, 4th story, 1st apartment from north at east

    Aug 20, 2026 · Apt B19

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt a3, 1st story, 2nd apartment from south at west , section at south

    Jul 16, 2026 · Apt A3

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt a3, 1st story, 2nd apartment from south at west , section at south

    Jul 16, 2026 · Apt A3

    Open — Nov sent out
  • C

    Repair the broken or defective connection at waste drain pipe under the sink in the kitchen located at apt a3, 1st story, 2nd apartment from south at west , section at south

    Jul 16, 2026 · Apt A3

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of plex-glass at vestibule door at public hall, 1st story

    Apr 16, 2026

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective 2nd marble tread from bottom to up at public hall stairs, 2nd story

    Apr 16, 2026

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt b8, 2nd story, 1st apartment from north at east , section at north

    Apr 16, 2026 · Apt B8

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective 8th marble tread from bottom to up at public hall stairs, 4th story

    Apr 16, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroom located at apt b9, 2nd story, 3rd apartment from north at east , section at north

    Apr 16, 2026 · Apt B9

    Open — First no access to re- inspect violation
  • C

    Properly repair or replace the broken or defective base cabinet with counter top in the kitchen located at apt b9, 2nd story, 3rd apartment from north at east , section at north

    Apr 16, 2026 · Apt B9

    Closed — Violation closed
  • C

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt b9, 2nd story, 3rd apartment from north at east , section at north

    Apr 16, 2026 · Apt B9

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective springs balances at fire escape window upper sash in the 1st room from east located at apt b8, 2nd story, 1st apartment from north at east , section at north

    Apr 16, 2026 · Apt B8

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt b4, 1st story, 1st apartment from south at west , section ''b''

    Mar 16, 2026 · Apt B4

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at north located at apt b4, 1st story, 1st apartment from south at west , section ''b''

    Mar 16, 2026 · Apt B4

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt b4, 1st story, 1st apartment from south at west , section ''b''

    Mar 16, 2026 · Apt B4

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt b4, 1st story, 1st apartment from south at west , section ''b''

    Mar 16, 2026 · Apt B4

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt b4, 1st story, 1st apartment from south at west , section ''b''

    Mar 16, 2026 · Apt B4

    Closed — Violation closed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 1st story

    Mar 16, 2026

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt b9, 2nd story, 2nd apartment from north at east

    Mar 3, 2026 · Apt B9

    Closed — Violation closed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Mar 3, 2026

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt b9, 2nd story, 2nd apartment from north at east

    Mar 3, 2026 · Apt B9

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt b9, 2nd story, 2nd apartment from north at east

    Mar 3, 2026 · Apt B9

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt b9, 2nd story, 2nd apartment from north at east

    Mar 3, 2026 · Apt B9

    Open — First no access to re- inspect violation
  • I

    The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Feb 2, 2026

    Open — Info nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 4th room from north located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall, 3rd window frame from north at east wall in the 4th room from north located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 3rd room from north located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st door from south at west wall, 1st window frame from north at east wall in the 1st room from north at east located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, north wall in the foyer located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from east at south wall in the 3rd room from north located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from north at east located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the kitchen located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st closet from north at east wall door frame, 1st closet from south at west wall door frame in the private hallway located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, east wall, west wall in the private hallway located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at east wall, east wall in the kitchen located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from north located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, ceiling in the 1st room from north at east located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door, ceiling in the private hallway located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of circuit breaker box with, missing slot' s covers and, exposed electrical wires, at west wall in the private hallway located at apt b1, 1st story, 1st apartment from north at east , section ''north''

    Dec 10, 2025 · Apt B1

    Closed — Violation closed

DOB building violations · 13

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2023

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
Show 3 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - active

ECB violations · 2

  • Class - 1

    At time of inspection observed at exp#2 missing mortar joints at multiple locations, cracks on facade at exp#1 and 2, at exp# 4 paint missing and exposed bricks., repair and/replace

    Sep 2, 2026 · Penalty $2,500

    Active
  • Class - 2

    Observed at exposure 4 and 3 section of facade paint spalling around tops floor of building., repair and/or replace

    Jul 15, 2026 · Penalty $1,280

    Active

Complaints

  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt B5

    Open
  • Water leak

    Damp spot

    Oct 8, 2026 · Apt B5

    Open
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt B5

    Open
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt B5

    Open
  • Paint/plaster

    Ceiling

    Oct 8, 2026 · Apt B5

    Open
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt B5

    Open
  • Heat/hot water

    Entire building

    Oct 8, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Oct 7, 2026 · Apt B6

    Open
  • Heat/hot water

    Entire building

    Oct 7, 2026 · Apt B7

    Close
  • Heat/hot water

    Entire building

    Oct 7, 2026 · Apt B4

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Oct 7, 2026 · Apt B6

    Open
  • Unsanitary condition

    Pests

    Oct 7, 2026 · Apt B6

    Open
  • Heat/hot water

    Apartment only

    Oct 7, 2026 · Apt B6

    Open
  • Plumbing

    Bathtub/shower

    Oct 7, 2026 · Apt B6

    Open
  • Plumbing

    Toilet

    Oct 7, 2026 · Apt B6

    Open
  • Heat/hot water

    Entire building

    Oct 7, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 6, 2026 · Apt B7

    Open
  • Heat/hot water

    Entire building

    Oct 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2026 · Apt B20

    Close
  • Door/window

    Door

    Sep 14, 2026 · Apt B20

    Close
  • Door/window

    Window frame

    Sep 14, 2026 · Apt B20

    Close
  • Water leak

    Heavy flow

    Sep 1, 2026 · Apt B14

    Open
  • Electric

    No lighting

    Sep 1, 2026 · Apt B14

    Open
  • Appliance

    Electric/gas range

    Sep 1, 2026 · Apt B14

    Open
  • Unsanitary condition

    Pests

    Sep 1, 2026 · Apt B14

    Open
  • General

    Cabinet

    Sep 1, 2026 · Apt B14

    Open
  • Unsanitary condition

    Mold

    Aug 26, 2026 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Aug 26, 2026 · Apt 2A

    Close
  • Appliance

    Refrigerator

    Aug 26, 2026 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Aug 9, 2026 · Apt A3

    Open
  • Plumbing

    Basin/sink

    Aug 9, 2026 · Apt A3

    Open
  • Unsanitary condition

    Pests

    May 21, 2026 · Apt B17

    Close
  • Unsanitary condition

    Pests

    May 21, 2026 · Apt B17

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2026 · Apt B6

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2026 · Apt B4

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2026 · Apt B4

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2026 · Apt A1

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Mar 9, 2026 · Apt B4

    Close
  • General

    Signage missing

    Feb 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2026 · Apt B6

    Close
  • Water leak

    Heavy flow

    Dec 30, 2025 · Apt B9

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2025 · Apt B9

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2025 · Apt B9

    Close
  • Heat/hot water

    Entire building

    Dec 11, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1931
Floors
4
Residential units
37
Building area
31,812 ft²
Lot area
10,000 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4620 / 30
Assessed value
$847,350
Landmark / historic district
No

HPD registration #305450, last renewed Jul 15, 2026.

Questions about 210 East 51 Street

Who owns 210 East 51 Street?

The owner of record in NYC Department of City Planning PLUTO data is 210 East 51st Street, LLC.

Does 210 East 51 Street have violations?

Yes. NYC HPD has recorded 318 housing violations at this property.

Is 210 East 51 Street rent stabilized?

NYC Department of Finance tax bills listed 35 rent-stabilized units here in 2024 (about 95% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 210 East 51 Street built?

City records list 1931 as the year it was built.

How many apartments are in 210 East 51 Street?

It has 37 residential units and 40 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.